Laserfiche WebLink
1 <br />' 440789 <br /> BLOCK WALL MW-2 <br /> (21 39) <br /> N 21 .40 EXPLANATION <br /> ASPHALT <br />' PAVING B-11/MW-4 <br /> Soil Boring/Monitoring Well <br /> CONCRETE ao 8-13 a Sol[ Boring <br /> MW-1 r <br />' {21 40)1/ $�3 � (21 60) Groundwater elevation (Ft-MSL), July 18, 1894 <br /> C7 � � � ?-21.40 Groundwater elevation contour (Ft-MSL), <br /> /. -21 .45 am'"' 02 18, 1994, queried where uncertain <br /> r Approximate direction of groundwater <br />' v STATION ❑ flow showing average gradient <br /> BUILDING <br />' CONCRETE •2 c:::3 <br /> TANK <br /> 7 <br /> PAD I <br /> Bs 12 ' • CONCRETE )NAL"AY B-6 <br /> 21.50�-� ?~—.B-13 <br />' B-4� B-7 <br /> 0 B-1 <br /> ASPHALT PUMP <br />' PAVING ISLANDS 21.5 5 ?— <br /> O ONCRETE PAVING <br /> PAD <br /> B-5 — <br /> /� <br />' MW--4 <br /> Mw-3 <br /> (21 57) <br /> Light Pole (21 60) <br />' CONCRETECURB '� PROJECT ASSUMED EAST <br /> AC CURB DRIVEWAY <br /> DRNEWAY <br /> YOSEM ITE AVENUE 20 0 20 40 <br /> ISource: Map modified from reap provided Approximate Scale (feet) <br /> by Tom 0. Morrow Inc. <br /> 8104 <br /> ARCO PRODUCTS COMPANY FIGURE <br /> Em c o n ARCO SERVICE STATION NO 6020 <br /> Associates 1711 Y SEMITE AVENUE <br /> MANT CA, CALIFORNIA <br /> PROJECT N8 <br /> Sacramento, California GROUNOwATER C NTOUR MAP, JULY 18, 1994 0805-11101 <br />