My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005760 CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2900 - Site Mitigation Program
>
PR0545951
>
ARCHIVED REPORTS_XR0005760 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 2:53:09 AM
Creation date
8/6/2020 11:33:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005760 CASE 2
RECORD_ID
PR0545951
PE
3528
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Atlantic Richfield Company 3 <br /> ARCO Station#6020, 1711 E Yosemite Ave,Manteca, CA August 16,2000 <br /> • • Well Surveying. Upon completion of well construction, the wells will be <br /> surveyed by a licensed surveyor to a local benchmark relative to mean sea <br /> level Groundwater gradient will be interpreted utilizing wellhead <br /> elevations and depth-to-water measurements <br /> • Well Search. A 112-mile radius well search will be performed to evaluate <br /> potential sensitive receptors in the area of the site <br /> • Report. A report will be prepared after completion of necessary field <br /> work The report will include soil boring logs, well construction <br /> details, soil and groundwater analytical results, chain-of-custody <br /> documentation, and conclusions <br /> Field and laboratory procedures are presented as Attachment D <br /> SCHEDULE <br /> SECOR is prepared to initiate field work within 2 weeks following approval of this work <br /> plan and issuance of permits by the SJCEHD A report documenting the findings of this <br /> assessment is anticipated to be submitted approximately 6 to 8 weeks after the completion <br /> of the field work and receipt of laboratory results <br /> If there are any Questions regarding this work plan, please call us at(916) 861-0400 <br /> Y .02,R� <br /> Sincerely, <br /> SECOR International Incorporated <br /> �ERED GE <br /> Rusty E Benkosky, P E �c, p� <br /> Associate Engineer Q`LGREG O0 <br /> BARCLAY <br /> u, No. gp <br /> Greg Barclay, RG &0 �oF L1Fa� <br /> Senior Geologist <br /> Attachments Figure 1 - Site Location Map <br /> Figure 2 - Site Map with Proposed Well Locations <br /> Attachment A —SCEMD Letter, dated April 19, 1999 <br /> Attachment B - UST Removal Analytical Data <br /> Attachment C - Site Specific Health and Safety Plan <br /> Attachment D - Field and Laboratory Procedures <br /> cc Mr Paul Supple, Atlantic Richfield Company (ARCO) <br /> Mr Marty Hartzell, RWQCB <br /> 077 42070 310/WKPLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.