Laserfiche WebLink
Pacific Gas and <br /> 8 E/¢ctric Company' <br /> 11. Cathodic Protection: PGS.E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system. Any proposed facilities, such as metal conduit, pipes, <br /> service lines, ground rods, anodes,wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PGBE Corrosion Engineering. <br /> 12- Pipeline Marker Signs: PGB.E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete- <br /> 13. PG8.E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PGBE's facilities must be reviewed and <br /> approved by PGB,E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PGS�E Gas and lilcc b-fc Pa cilitics Page 4 <br />