My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013544
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
26603
>
2600 - Land Use Program
>
PA-2000083
>
SU0013544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 4:40:33 PM
Creation date
8/7/2020 11:07:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013544
PE
2631
FACILITY_NAME
PA-2000083
STREET_NUMBER
26603
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20911004
ENTERED_DATE
7/27/2020 12:00:00 AM
SITE_LOCATION
26603 S HANSEN RD
RECEIVED_DATE
3/22/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & E/ecrric Campany� <br /> Attachment 2—Electric Facilities <br /> It is PGB.E's policy to permit certain uses on a case by case basis within its electric <br /> transmission fee strips) and/or easements) provided such uses and manner in which th¢y era <br /> exarcisetl, will not interfere with PG&E's rights or endanger Its facilities. Some <br /> examples/restrictions are as follows: <br /> 1. Buildings antl Other Structures: No buildings or other structures inclutling the foot print and <br /> cave of any buildings, swimming pools, wells or similar structures will be permitted within fee <br /> strips) and/or easemant(s) areas. PGB�E's transmission easement shall be designated on <br /> subtlivision/parcel maps as"RESTRICTED USE AREA—NO BUILDING." <br /> 2. Grading: Cuts, trenches or excavations may not ba made within 25 feet of our towers. <br /> Developers must submit grading plans and site tlevelopment plans (including geotechnical <br /> reports if applicable), signed and dated, for PG8.E's review. PGB.E engineers must review grade <br /> changes in the vicinity of our towers. No fills will be allowed which woultl impair ground-to- <br /> conductor clearances. Towers shall not ba left on mounds without atlaquate road access to <br /> base of tower or structure. <br /> 3. Fences: Walls, fences, and other structural must be installed at locations that do not affect <br /> the safe operation of PGB.'s facilities. Heavy equipment access to our facilities must be <br /> maintained at all times. Metal fences are to be grountl¢d to PGSE specifications. No wall, fence <br /> or other like structure is to be Installed within 10 feet of tower footings and unrestrictetl access <br /> must be maintained from a tower structure to th¢near¢st street. Walls, fences antl other <br /> structures proposed along or within the fee strips) and/or easements)will require PG$E <br /> review; submit plans to PG&E Centralized Review Team for review and comment. <br /> 4. Landscaping: Vegetation may be allowed; subject to review of plans. On overhead electric <br /> transmission tee strips) and/or easement(s), trees and shrubs are limited to those varieties that <br /> tlo not exceetl 15 feet in height at maturity. PGBE must have access to its facilities at all times, <br /> including access by heavy¢quipmant. No planting is to occur within the footprint of the tower <br /> legs. Greenbelts are encouraged. <br /> 5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibited within PG&E's fee strips) <br /> and/or easements)for electric transmission lines. <br /> 6. Automobile Parking: Short term parking of movable passenger vehicles antl light trucks <br /> (pickups, vans, etc.) is allowed. Tha lighting within these parking areas will Head to ba reviewed <br /> by PG&E; approval will be on a case by case basis. Heavy equipment access to PG&E facilities <br /> is to be maintained at all times. Parking is to clear PGS.E structures by at least 1 O feet. <br /> Protection of PGB.E facilities from vehicular traffic is to ba provided at developer's expense AND <br /> to PGB,E specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings <br /> are not allowetl. <br /> 7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or <br /> combustibles and no fueling of vehicles within PG&E's easement. No trash bins or Incinerators <br /> are allowetl. <br /> PGScE Gas and Electric Facilities Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.