My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16514
>
1600 - Food Program
>
PR0544910
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:15:33 AM
Creation date
8/12/2020 8:15:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544910
PE
1625
FACILITY_ID
FA0025530
FACILITY_NAME
IN-N-OUT BURGER #346
STREET_NUMBER
16514
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16514 GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-N-Out Burgers NGF 255 Progate Drive Thru Installation Manual <br />© 2011, IMI Cornelius Inc.- 7 -Publication Number: 621058475INS <br />NOTE: Refer to Water Installation section or Decal on the lower front of the unit for the location of <br />syrup and water connections. <br />5. Clean the hopper interior. <br />6. Connect the unit power cord to a 120 volt, 60 cycle, 3–wire grounded receptacle. For 220-240 Volt International <br />Units, a 3-wire power cord is provided. An adapter plug for the particular country will need to be provided by <br />the Installer. <br />ADJUST CARBONATOR CO2 R EGULATOR AND TURN WATER INLET SUPPLY LINE ON <br />1. Open (counterclockwise) CO2 cylinder valve slightly to allow lines to slowly fill with gas, then open the valve <br />fully to back-seat the valve. (Back-seating the valve prevents leakage around the valve shaft). <br />2. The carbonator CO2 regulator is fixed at a nominal 75 psi. <br />3. Open one of the post-mix dispensing valves to exhaust trapped air inside the carbonator tank. <br />4. Open the water inlet supply line shutoff valve. <br />CO2 INSTALLATION <br />WARNING: Machine is designed to work only with CO2. Store air supplied from a compressed air system could <br />contain moisture and oils that could damage and/or cause the Ice Gate to loose performance or malfunction. <br />1. Use 1/4” tubing capable of handling a minimum of 120 psi. <br />2. Guide CO2 lines from back of machine to front. <br />3. Locate CO2 line and connect to the barb fitting. <br />4. Use Oetiker clamps to secure all lines to barbed fittings. <br />5. Replace lower splash panel to frame. <br />Figure 4. <br />PROGATE CO SHUTOFF2 CARBONATOR FEED <br />CO INPUT2
The URL can be used to link to this page
Your browser does not support the video tag.