Laserfiche WebLink
1430A215-Mar2008 1530A215-Mar2008 <br /> <br /> <br />WARNING: THE RESTRAINT DEVICE (ITEM 9) MUST BE INSTALLED TO ASSURE TENSION CANNOT BE PLACED <br /> ON THE GAS OR ELECTRICAL CONNECTIONS <br /> 1. BUILDING GAS SERVICE LINE 6. APPLIANCE MANIFOLD/NIPPLE <br /> 2. MAIN GAS CUT-OFF VALVE 7. EYELET FASTENERS <br /> 3. CONNECT-IT QUICK-DISCONNECT 8. SPRING HOOK <br /> 4. FLEX-CON CONNECTOR 9. RESTRAINING CHAIN <br /> 5. ELBOW <br /> <br />A. UNPACKING: Check that the container is upright. Use an outward prying motion – DO NOT USE A HAMMER - to remove the <br /> carton. Check the fryer for visible damage; if such damage has occurred do not refuse shipment, but contact the carrier and file <br /> the appropriate freight claims. <br />B. INSTALLING: Roll the assembled fryer into the building and to its operating location. <br /> <br /> WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE <br /> PROPERTY DAMAGE, INJURY, OR DEATH. READ THE INSTALLATION, OPERATING, AND MAINTENANCE <br /> INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT. <br /> C. LEVELING: <br /> 1. When the fryer is placed in its operating location, check to be sure it is level. If not, loosen the casters and insert the appropri- <br /> ate number of shim plates between leg and caster plates; then retighten the caster bolts. <br /> 2. If the floor is smooth and level, adjust to the high corner and measure with a spirit level. If the floor is uneven or has a <br /> decided slope, level the unit with metal shims. <br /> NOTE: A caster may not return exactly to the same position after being moved, which may require re-leveling after each move. <br /> 3. Connect the gas manifold to the building gas supply line by means of a CSA International APPROVED flexible gas line as <br /> shown in the figure below. <br /> NOTE: CONNECT-IT inc. 3⁄4" (19mm), 1" (25mm) and 1 1⁄4" (32mm) flexible gas hose 4 feet long (1219mm) with a quick <br /> disconnect coupling on one end is available from Ultrafryer Systems under PN 24322 (3⁄4" (19mm) hose), PN 24323 <br /> (1" (25mm) hose) and PN 24456 (1 1⁄4" (32mm) hose). These hoses are equipped with a fusible link, which melts at <br /> 361˚F (183˚C) that will SHUT OFF the gas supply when it melts. A 44" (1119mm) long restraining device is also <br /> available under PN 24324. <br /> CAUTION: THE BUILDING GAS SUPPLY LINE MUST BE SIZED TO PROVIDE THE VOLUME OF GAS REQUIRED FOR <br /> PROPER OPERATION AS EXPLAINED ON THE PREVIOUS PAGE.