My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16514
>
1600 - Food Program
>
PR0544910
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:15:33 AM
Creation date
8/12/2020 8:15:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544910
PE
1625
FACILITY_ID
FA0025530
FACILITY_NAME
IN-N-OUT BURGER #346
STREET_NUMBER
16514
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16514 GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 L1L2L3NL1 <br />FOR 3-PHASE OPERATION <br />CONNECT INPUT WIRING TO <br />L1,L2,L3 & N AS SHOWN. <br />FOR 1-PHASE/15 AMP. OPERATION <br />CONNECT INPUT WIRING TO <br />L1 & N AS SHOWN. <br />N <br />RED <br />BRN <br />BLU <br />TERMINAL <br />BLOCK <br />TO MACHINEFROM POWER SOURCETO MACHINEFROM POWER SOURCEL1L2L3NBLK <br />RED <br />BRN <br />BLK <br />BRN <br />BLU <br />L2 <br />L3 <br />BLK L1L2L3NL1 <br />N <br />RED <br />BLUTO MACHINEFROM POWER SOURCEL1 <br />N <br />FOR 1-PHASE/30 AMP. OPERATION <br />MOVE BLACK WIRE INTO <br />TERMINAL BLOCK WITH BROWN <br />WIRE, CONNECT INPUT WIRING <br />TO L1 & N AS SHOWN. <br />PLUMBING REQUIREMENTS <br />The dispenser may be connected to a cold or hot water system (140°F Max.) with operating pressure between 20 and 90 psi <br />(0.138 and 0.620 MPa) from a 1/2” or larger supply line. A shut-off valve should be installed in the line before the dispenser. <br />Install a regulator in the line when pressure is greater than 90 psi (0.620 MPa) to reduce it to 50 psi (0.345 MPa). The water <br />inlet fitting is 3/8” flare. Dispensers set up to deliver to 1.8 Oz./sec. (53.2 ml/sec) per dispense tip, require a water supply <br />source that can deliver a minimum of 1.7 gpm (6.4 lpm) at the inlet fitting. Dispensers set up to deliver 2.6 Oz./sec. (76.9 <br />lpm) per dispense tip, require a water supply source that can deliver a minimum of 2.4 gpm (9.2 lpm) at the inlet fitting. <br />NOTE: Bunn-O-Matic recommends 3/8” tubing from the 1/2” water supply line. At least 18 inches of FDA approved flexible <br />beverage tubing, such as reinforced braided polyethylene or silicone, before the dispenser will facilitate movement to clean <br />the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the dispenser. The size and shape <br />of the hole made in the supply line by this type of device may restrict water flow. <br />NOTE: Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed, and <br />maintained in accordance with federal, state, and local codes. <br />36026.1 111714 <br />As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the <br />Food and Drug Administration (FDA), this equipment must be installed with adequate backflow prevention to comply <br />with federal, state and local codes. For models installed outside the U.S.A., you must comply with the applicable <br />Plumbing /Sanitation Code for your area. <br />ELECTRICAL REQUIREMENTS (Cont.) <br />CAUTION: The dispenser must remain disconnected from power source until specified in Electrical Hook-Up. <br /> The LCR-2A 3 Phase dispenser is internally wired from the factory for 400 Volts AC Phase to Phase, 220-240 Volts AC <br />Phase to Neutral, 3 Phase 50/60 Hz. It requires a 4-wire, grounded, individual branch circuit rated for 400 Volts AC, Three <br />Phase, 50/60 Hz. At Three Phase operation, each Phase will have approximately 13.5-14.0 Amps flow through it. <br /> The LCR-2A 3 Phase dispenser can be Field Wired for 220-240 Volts AC, Single Phase applications. This requires a <br />2-wire, grounded, individual branch circuit rated for 220-240 volts AC, Single Phase, 50/60 Hz. At Single Phase operation, <br />the machine will have approximately 27.5 Amps flow through it. <br />NOTE: The internal terminal block must be rewired for 220-240 Volts AC, Single Phase applications, (see Optional Field <br />Wiring Diagram). <br />CE REQUIREMENTS <br />• This appliance must be installed in locations where it can be overseen by trained personnel. <br />• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C. <br />• Appliance shall not be tilted more than 10° for safe operation. <br />• An electrician must provide electrical service as specified in conformance with all local and national codes. <br />• This appliance must not be cleaned by water jet. <br />• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabili- <br />ties, or lack of experience and knowledge, unless they have been given instructions concerning use of this appliance by <br />a person responsible for its safety. <br />• Children should be supervised to ensure they do not play with the appliance. <br />• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with a special <br />cord available from the manufacturer or its authorized service personnel in order to avoid a hazard. <br />• Machine must not be immersed for cleaning. <br />The LCR-2A dispenser is internally wired from the <br />factory for 220-240 Volts AC Single Phase 50/60 <br />Hz. It requires a 2-wire, grounded, individual <br />branch circuit rated for 220-240 Volts AC. <br />L2 RED <br />L1 BLACK <br />200, 230 or <br />240V A.C.230V A.C. <br />RELEASED FOR PRODUCTION <br />DIR Num: 36026.0001 19, May 2015
The URL can be used to link to this page
Your browser does not support the video tag.