My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN VALLEY
>
16514
>
1600 - Food Program
>
PR0544910
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2023 11:15:33 AM
Creation date
8/12/2020 8:15:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544910
PE
1625
FACILITY_ID
FA0025530
FACILITY_NAME
IN-N-OUT BURGER #346
STREET_NUMBER
16514
STREET_NAME
GOLDEN VALLEY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16514 GOLDEN VALLEY PKWY
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br />REPLACING THE PUMP TUBING <br />The pumps and tubing used in the dispenser are designed to give maximum performance and long life. However, <br />the tubes are a wear item and must be replaced periodically. How long the tubes last is dependent on usage and <br />properties of the concentrate. Excessive wear will reduce the output of the pumps resulting in a weak mixed <br />beverage. Bunn-O-Matic recommends replacing the Pump Tubing a minimum of once every 6 months or <br />sooner if warranted. <br />Refer to the Tube Replacement Instruction on the Cabinet door for details. <br />1. Rinse the pump tubing with warm tap water (Refer to steps 1 - 5 of the Weekly Sanitizing instructions) prior <br />to removing the tubes to avoid concentrate spills. <br />2. Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set it and the retainer plate <br />aside. <br />3. Depress the tension screw and remove it from the notch in the pump housing, releasing the spring tension <br />on the pump band. <br />4. Open the compression band and gently pull the pump tube from around the pump’s rotor. <br />5. Inspect the pump bands for signs of wear. Replace if necessary. <br />6. Apply lubricant (BUNN-O-MATIC part number M2531.0001) to the new pump tubing’s rotor side. <br />7. Insert the tube onto the mix chamber port, then wrap the new tubing around the pump rotor, making sure <br />that the elbow and clamps end up on the bottom side of the pump housing. <br />8. Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump <br />band. <br />9. Replace the tubing retainer plate and tighten the thumbscrew. <br />10. Repeat steps 1 through 9 for the other pump. <br />Note: Replacement Tube/Adapter Kits can be purchased from BUNN-O-MATIC. <br />Remove Retaining Plate Release Spring Tension Remove Tubing Lubricate New Tube <br />Install New Tubing Completed Installation <br />Thumbscrew <br />Lubricate between arrows <br />2.0”2.0”Tension <br />Screw <br />Tube Clamp <br />Tension Screw <br />36026.1 010313 <br />PREVENTIVE MAINTENANCE <br />Bunn-O-Matic® Corporation recommends that preventive maintenance be performed at regular intervals. Maintenance <br />should be performed by a qualified service technician. For Technical Service, contact Bunn-O-Matic® Corporation at <br />1-800-286-6070. <br />NOTE: Replacement parts or service caused by failure to perform required maintenance is not covered by warranty. <br /> Replace pump hoses every 6-Months or as needed. <br />RELEASED FOR PRODUCTION <br />DIR Num: 36026.0001 19, May 2015
The URL can be used to link to this page
Your browser does not support the video tag.