G G GAS
<br /> CW COLD WATER 0
<br /> HW HOT WATER
<br /> CD CONDENSATE DRAIN
<br /> o W WASTE
<br /> F
<br /> W z ------ V VENT �—
<br /> o0 4
<br /> �OCOw
<br /> F
<br /> wo 0 0
<br /> oz
<br /> �o F � O
<br /> a�
<br /> o
<br /> =of
<br /> coLL
<br /> = LEGEND N.T.S. D s
<br /> LU 5
<br /> 0-0
<br /> 5
<br /> Ms 1.ALL PLUMBING WORK&MATERIALS TO BE INSTALLED IN ACCORDANCE WITH ALL vM) architecture
<br /> 01 o APPLICABLE STATE&LOCAL CODES®ULATIONS. CONTRACTOR TO OBTAIN ALL — — — —
<br /> w a APPROVALS REQUIRED FROM REGULATING AGENCIES BEFORE STARTING WORK.ALL �f© Design Planning Interiors
<br /> o PLUMBING WORK&MATERIALS TO MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE 637 5th Avenue San Rafael, CA 94901
<br /> CO CALIFORNIA PLUMBING CODE. OBTAIN &PAY FOR ALL PERMITS, FEES&INSPECTIONS s 415-451-2500 415-451-2595 fax
<br /> REQUIRED BY GOVERNING AUTHORITIES. www.vmarch.com
<br /> LU 0
<br /> o<2 . PRIOR TO COMMENCING WORK ON THIS PROJECT, CONTRACTOR SHALL VERIFY DEPTH, ❑ O O O Ms 1 12
<br /> I VMI JOB NUMBER
<br /> o SIZE, LOCATION AND CONDITION OF ALL EXISTING UTILITIES IN FIELD BEFORE STARTING _ 10 1861
<br /> w Lu WORK. SHOULD CONDITIONS EXIST OTHER THAN THOSE INDICATED WHICH WOULD CAUSE
<br /> 0" THE DESIGN TO BE ALTERED, CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY.
<br /> _— / Q
<br /> Z o 3. CONTRACTOR SHALL COORDINATE INSTALLATION OF PLUMBING WORK WITH ALL OTHER ` 13
<br /> o w TRADES SO AS TO AVOID UNNECESSARY DELAY OR INTERFERENCES. CONTRACTOR TO 16 9 ����'� ARCFIJ�
<br /> z REVIEW ARCHITECTURAL AND EQUIPMENT SHEETS. 2s 14 J ti� WAR
<br /> o 15 �� I
<br /> o m 4.WATER PIPING TO BE TYPE L COPPER MATCHING EXISTING,TYPE K BELOW FLOOR. 21 17 1s 30
<br /> IL m 2g — C �b
<br /> o w 5.WASTE AND VENT PIPING TO BE CAST IRON OR ABS DWV WHERE ALLOWED. (E)11/2"
<br /> J * No. C17928
<br /> o a 7. NEW GAS PIPING TO BE SCHEDULE 40 BLACK STEEL, GALVANIZED ON ROOF. 22 L 1 2s we 1 I I ( REN. 10/31/19
<br /> 2s
<br /> cn
<br /> O 1 il/2"
<br /> LU W
<br /> EL 8. NEW WASTE PIPING TO BE RUN AT 2%MINIMUM SLOPE. 1/2" TP 1 20 � � r0����
<br /> o ❑ 25 FD 1 C7 0� C 1L�i
<br /> R Q 10. NEW HOT WATER PIPING TO BE WRAPPED WITH 1"THICK JACKETED FIBERGLASS 11/4"
<br /> LOU W ISULATION. PROVIDE INSULATION SHIELDS AT PIPE HANGERS AND SUPPORTS. INSULATION 1" 1/2"
<br /> 0
<br /> 0 a-
<br /> 00 FOR HOT WATER PIPING TO COMPLY WITH THE REQUIREMENTS OF SECTION 120.3 OF THE 2016 C
<br /> o cn= CALIFORNIA ENERGY CODE. z4 we i
<br /> 00 L - -
<br /> o 11. INSTALL SHUTOFF VALVES ON ALL HOT&COLD WATER LINES TO FIXTURE OR APPLIANCE. 1/2"
<br /> o ALL EXPOSED WATER AND WASTE LINES SHALL BE CHROME PLATED. 19
<br /> LF
<br /> ww
<br /> Uj
<br /> } 12. REMOVE ALL ABANDONED PIPING TO REMOVED FIXTURES&EQUIPMENT, CAPPING BEHIND 25 FD 1 17 WH 1&2 27
<br /> cn Z FINISHED SURFACES. 22 L 1 r J
<br /> go 06 66
<br /> w
<br /> U)COO
<br /> 13. RELOCATE PLUMBING PIPING (WATER, WASTE&VENT)TO NEW FIXTURE&EQUIPMENT 21 2s „
<br /> o
<br /> Z CONNECTIONS AS REQUIRED. 3/4
<br /> z
<br /> w o
<br /> 0 0 14. PROVIDE ACCESSABLE WATER HAMMER ARRESTORS OR AIR CHAMBERS WHERE REQUIRED
<br /> Q BY THE CALIFORNIA PLUMBING CODE.
<br /> az
<br /> vS o
<br /> z 15.ARRANGE FOR SAWCUTTING AND PATCHING EXISTING CONCRETE FLOOR SLAB AS
<br /> o REQUIRED FOR INSTALLATION OF NEW UNDER FLOOR PIPING.
<br /> 0
<br /> vi w
<br /> o'm 16. SLEEVES TO BE PROVIDED TO PROTECT ALL NEW PIPING PASSING THRU CONCRETE FLOOR
<br /> �Z
<br /> SLABS PER REQUIREMENTS OF CPC 312.10.
<br /> LL O
<br /> w�~ 17. NEW OR REPAIRED POTABLE WATER PIPING TO BE DISINFECTED PRIOR TO USE PER
<br /> ¢
<br /> Z> REQUIREMENTS OF CPC 609.9.
<br /> U Z
<br /> 0 18.ALL NEW PIPING IN BUILDING TO BE SUPPORTED&SEISMICALLY BRACED PER RECORD DATES
<br /> w REQUIREMENTS OF 2016 CBC&CPC.p j DD SUBMITTAL
<br /> �ZPLUMBING FLOOR PLAN 1/4" = 1'-0" A
<br /> LU m 19. NEW CLEANOUTS TO BE INSTALLED WHERE REQUIRED BY 2016 CPC&BE READILY BLDG.SUBMITTAL 12/03/2018
<br /> ACCESSIBLE.THE CONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS WITH RECONNECT RELOCATED BEVERAGE UNIT&ICE MACHINE DRAINS TO EXISTING FLOOR SINK ALONG WITH SODA&WATER TUBING. BID SET
<br /> EQUIPMENT, CABINETS, ETC. PRIOR TO ANY INSTALLATION. COLD HOT WASTE WATER CONTRACT SET
<br /> ITEM FIXTURE WASTE VENT WATER WATER GAS FU FU DESCRIPTION MANUFACTURER/MODEL NUMBER (�f) EXISTING FRUTISTA MACHINE TO BE REMOVED&REINSTALLED FOR COUNTER REFINISHING.ARRANGE FOR RECONNECTION TO
<br /> z o EXISTING SODA TUBING. REVISIONS
<br /> o 20. NEW LAVATORIES AND WATER CLOSETS TO BE INSTALLED PER CALIFORNIA STATE
<br /> HANDICAPPED ACCESSIBILITY REQUIREMENTS. WATER WHITE VITREOUS CHINA FLOOR MOUNTED PRESSURE ASSISTED FLUSH TANK TYPE, (:IDCONNECT NEW WALL MOUNTED HAND SINK TO EXISTING COLD WATER, HOT WATER,WASTE&VENT THAT SERVED REMOVED
<br /> o Q WC 1 CLOSET 4" 2" 1/2" -- 4 2.5 ELONGATED BOWL,ADA COMPLIANT, 1.1 GPF WITH BOLT CAPS,TANK COVER LOCKS, AM. STD. CADET/MODEL: 2467.100 COUNTERTOP HAND SINK,VERIFY POINTS OF CONNECTION.
<br /> Z O 21. LOCATIONS OF EXISTING WATER&WASTE PIPING SERVING EXISTING TOILET ROOM OLSENITE #95 OPEN FRONT SEAT LESS COVER AND SPEEDWAY SUPPLY. ® EXISTING PREP SINK TO REMAIN.
<br /> FIXTURES ARE UNKNOWN &TO BE VERIFIED IN FIELD BEFORE STARTING WORK.
<br /> Q~ WHITE VITREOUS CHINA,WALL HUNG,ADA COMPLIANT WITH CONCEALED ARM SUPPORT, AMERICAN STD. COMRADE 0124.131 EXISTING FLOOR SINK TO REMAIN.
<br /> 0
<br /> 4"CENTERS, INTEGRAL BACKSPLASH, FLAT GRID STRAINER, METERING TYPE FAUCET,
<br /> U)
<br /> L 1 LAVATORY 2" 1-1/2" 1/2" 1/2" 1 1 17 GAUGE P-TRAP&SPEEDWAY SUPPLIES. WITH A.S. 1340.225 METERING FAUCET © EXISTING FLOOR DRAIN TO REMAIN.
<br /> r
<br /> o Z (�Z:) INSTALL NEW NICKEL-BRONZE GRATE WITH FUNNEL ON EXISTING FLOOR DRAIN.
<br /> UJ 0 24"x24"x12" PRECAST TERRAZZO WITH 6"HIGH THRESHOLD, STAINLESS STEEL CAP ON ALL FIAT TSB-3000 ® NEW 3 COMPARTMENT POWER SOAK SINK TO REPLACE EXISTING 3 COMPARTMENT SINK, RECONNECT TO EXISTING WATER&WASTE
<br /> Z SIDES, REAR&LEFT SIDE TILING FLANGES, 3"GRID DRAIN &WALL MOUNTED FAUCET ROUGH-INS THRU EXISTING WALL.
<br /> N > MS 1 MOP SINK 3" 2" 3/4" 3/4" - 3 3 WITH VACUUM BREAKER. AM. STD. 8344.012 FAUCET
<br /> ' EXISTING WALL MOUNTED WATER FILTER TO REMAIN. REROUTE EXISTING PLASTIC DRAIN TUBE THRU NEW 1/2"0 PVC SLEEVE THRU
<br /> coa w WALL AS LOW AS POSSIBLE TERMINATED WITH ELBOW OVER RIM OF NEW MOP SINK.
<br /> N � WATER GAS FIRED TANKLESS WATER HEATER, 199,000 BTUH INPUT, 6 GPM @ 60 DEGREE RISE TAKAGI T-H3-OS
<br /> co o¢ WH 1&2 HEATER -- -- 3/4" 3/4" 1" -- -- RECOVERY RATE WITH OUTDOOR RATING&WALL MOUNTING KITS. WEIGHT= 110 POUNDS 10 1/2"FLUE CONDENSATE DRAIN DOWN IN WALL WITH 90°TERMINATION LOW AS POSSIBLE OVER NEW MOP SINK.
<br /> o w w 11 CONNECT 3/4"H&CW TO MOP SINK FAUCET&1/2" H&CW TO HAND SINK FAUCET TO EXISTING 3/4"HOT&COLD WATER DOWN IN WALL. CLIENT
<br /> GENERAL NOTES E PRB MANAGEMENT LLC.
<br /> a PPP INC. MODEL ULP-50OLP 12 CONNECT NEW MOP SINK DRAIN TO 3"VENTED WASTE FROM REMOVED MOP SINK DRAIN ON OPPOSITE SIDE OF EXISTING WALL.
<br /> LU�, TRAP PRIMER VALVE INSTALLED ON BOTTOM CONNECTION ON STOP VALVE THRU WALL WITH
<br /> co TRAP 1/2"COLD WATER INTO WALL TO FLOOR DRAIN TRAP PRIMER CONNECTION. 4709 Mangels Blvd.
<br /> 0 o z - 13 CONNECT NEW HAND SINK TO EXISTING 2"MOP SINK VENT IN WALL&3"WASTE BELOW FLOOR.
<br /> TP 1 PRIMER -- -- 1/2" -- -- --
<br /> CL Farfield,CA 94534
<br /> C, M IX TOP OF PARAPET WALL ABOVE ROOF CONNECT NEW 1"HOT&COLD WATER TO NEAREST EXISTING 1"ALONG WITH 11/4"GAS CONNECTED TO NEAREST EXISTING 2"GAS.
<br /> o ¢m f 14 DAVE FULWILER
<br /> > w z CAST IRON FLOOR DRAIN WITH FLANGE, INTEGRAL CLAMPING COLLAR,TRAP (]5D EXISTING MOP SINK ALONG WITH ITS WALL MOUNTED FAUCET TO BE REMOVED IN DEMOLITION WORK.
<br /> s "a _ PRIMER CONNECTION AND ADJUSTABLE ROUND NICKEL BRONZE STRAINER
<br /> o FD 1 FLOOR DRAIN 2" 2" -- -- -- 2 - JR SMITH/MODEL: 2005-A 1s EXISTING WATER HEATER&FLUE THRU ROOF TO BE REMOVED ALONG WITH ABANDONED PIPING.ARRANGE FOR PATCHING OF
<br /> 0 _> EXISTING ROOF&ROOFING AT REMOVED FLUE PENETRATION. PROJECT
<br /> F= -a $ WATER HEATER MOUNTED HIGH
<br /> cm o= WH 1&2 AS POSSIBLE ON WALL,2 WATER 17 EXISTING LAVATORY TO BE REMOVED IN DEMOLITION WORK. TACO BELL REMODEL
<br /> a LuHEATERS INSTALLED SIDE BY SIDE NOTE: LAVATORIES AND WATER CLOSETS TO BE INSTALLED PER CALIFORNIA STATE HANDICAPPED ACCESSABILITY REQUIREMENTS.
<br /> 4 012 1 18 EXISTING WATER CLOSET TO BE REMOVED IN DEMOLITION WORK. 3507 W HAMMER LANE
<br /> NI w 7 19 EXISTING URINAL TO BE REMOVED IN DEMOLITION WORK. STOCKTON,CA 95219
<br /> co
<br /> � =
<br /> 20 1/2"COLD WATER FROM EXISTING NEAR BY TO ACCESSABLE TRAP PRIMER TP-1 ADJACENT TO T-BAR CEILING. RUN INDIVIDUAL 1/2"CW
<br /> C:)
<br /> f Q 6j 4 FLASH PIPE PENETRATIONS THRU WALL WATER DOWN IN WALL FROM TP-1 TO BELOW FLOOR TO EACH OF 2 FLOOR DRAINS. STORE#2832
<br /> > o TIGHT,PIPE INSULATION JACKET TO EXTEND THRU
<br /> o Z 3 FLASHING INTO WALL 21 INSTALL NEW CHROME PLATED WALL ACCESS PLATE TO REPLACE EXISTING COVERING EXISTING CLEANOUT IN WALL.
<br /> Z�
<br /> wo s s ROOF 22 NEW LAVATORY TO REPLACE EXISTING AT SLIGHTLY OFFSET LOCATION ALONG EXISTING WALL, CONNECT TO EXISTING ROUGH-INS
<br /> �I THRU WALL PROVIDING NEW SUPPLIES&P-TRAP.
<br /> of Z w z 23 NEW WATER CLOSET TO REPLACE EXISTING AT SLIGHTLY OFFSET LOCATION ON EXISTING WALL, CONNECT TO WATER ROUGH-IN THRU 4QCOO
<br /> o w WALL PROVIDING NEW SUPPLY&4"VENTED WASTE FROM ADJACENT REMOVED WATER CLOSET.CO
<br /> o�n n
<br /> NI =w 1O WRAP EXTERIOR WATER PIPING WITH ALUMINUM JACKETED INSULATION 24 1/2"COLD WATER,4"WASTE&2"VENT TO NEW WATER CLOSET FROM EXISTING PIPING (LOCATIONS UNKNOWN), POINTS OF 7L�L�
<br /> E m El
<br /> O2 EXPANSION TANK PER CPC REQUIREMENTS ABOVE CEILING CONNECTION TO BE FIELD VERIFIED. M 1 O H
<br /> _ o 3/a"COLD WATER TO WATER HEATER FROM COMMON 1"IN WALL 25 CONNECT NEW FLOOR DRAIN TO EXISTING 2"VENTED WASTE THAT SERVED FLOOR DRAIN IT IS REPLACING. CONNECT UNDERFLOOR
<br /> of o¢ ® 3/4"120 DEGREE HOT WATER FROM WATER HEATER TO COMMON 1"IN WALL 1/2"COLD WATER FROM TRAP PRIMER TO TRAP PRIMER CONNECTION.
<br /> Z J ( 1"GAS TO WATER HEATER FROM COMMON 11/4"IN WALL 2s 1"HOT&COLD WATER, 11/4"GAS, 3/4"FLUE CONDENSATE&T&P RELIEF VALVE DRAIN UP TO WATER HEATERS ON ROOF. TERMINATE
<br /> U) Z= T&P RELIEF VALVE DRAIN THRU EXTERIOR WALL PER CODE
<br /> � �N © COMBINATION TEMPERATURE AND PRESSURE RELIEF VALVE WITH FULL SIZE
<br /> ml a COPPER DRAIN FLASHED WATER TIGHT INTO PARAPET WALL&DROPPING TO
<br /> [ o Z TERMINATION POINT THRU EXTERIOR WALL PER CODE 27 2 NEW TANKLESS WATER HEATERS MOUNTED ON ROOF WELL WALL, SEE WATER HEATER DETAIL.
<br /> _I U)< O7 1/2"PVC CONDENSATE DRAIN INTO WALL TO COMMON 1/2"DRAIN FLASHED EXISTING WALL TO BE REMOVED IN DEMOLITION WORK,TYPICAL. PLUMBING
<br /> C.0 z WATER TIGHT INTO PARAPET WALL&DROPPING ABOVE CEILING TO 28
<br /> 2? �w w TERMINATION POINT OVER MOP SINK
<br /> z_ ® SEISMICALLY MOUNT WATER HEATER TO STUDS OR BLOCKING PER CPC 29 OUTLINE OF EXISTING ROOF WELL ABOVE. PLAN
<br /> E REQUIREMENTS USING MANUFACTURER'S WALL MOUNTING KIT.SEAL
<br /> a o ANY WALL PENETRATIONS WATERTIGHT so EXISTING 11/2"COLD WATER SUPPLY WITH SHUT-OFF VALVE IN VALVE BOX.
<br /> cc uioz ( COMMON 1"COLD WATER SUPPLY ABOVE CEILING
<br /> �i '�'-
<br /> m F'-w
<br /> w
<br /> � o�
<br /> z
<br /> 0 ��
<br /> WATER HEATER DETAIL D PLUMBING FIXTURE & EQUIPMENT SCHEDULE C KEY NOTES B
<br />
|