My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 1:06:51 PM
Creation date
8/13/2020 12:26:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASE EQUIPMENT UNITS RATE TOTAL <br /> EconoPump System and Tank Skid Rental 1 $2,750.00 $2,750.00 <br /> Water level meter 4 $25.00 $100.00 <br /> Total ASE Equipment Costs $2,850.00 <br /> MISCELLANEOUS p`r �� � „av UNITS RATE TOTAL <br /> Mileage 800 $0.40 $320.00 <br /> Power Consumption To be Determined <br /> Activated Carbon Usage To be Determined <br /> City of Manteca Sewer Discharge Fee, per gallon To be Determined <br /> Total Miscellaneous Costs $320.00 <br /> GRAND TOTAL E5TIMATE OF MONTHLY COSTS , <br /> NOTES: <br /> 1. Actual coots will be calculated from Subcontractor invoices,plus 15%,and from ASE personnel time5heeto. <br /> Actual coots may vary from month to month. <br /> 2. The cost per gallon to discharge treated groundwater into the City of Manteca Sewer System has not <br /> been calculated at this time. This cost will be billed to the client at a rate of cost pluo 15%. <br /> 3. At the point when breakthrough i5 determined for a particular carbon vessel,the cost for carbon <br /> regeneration will be approximately$2,800.00 per vessel. <br /> 4. At the point when influent/effluent water Sampling and ASE Site visit frequency i5 reduced,ASE will modify <br /> thio monthly proposal to meet revised conditions. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.