My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
6100
>
4800 – General/Other Program
>
PR0535193
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:01 PM
Creation date
8/17/2020 8:09:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0535193
PE
1862
FACILITY_ID
FA0009271
FACILITY_NAME
OAK RIDGE WINERY, LLC
STREET_NUMBER
6100
Direction
E
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
APN
04912034
CURRENT_STATUS
01
SITE_LOCATION
6100 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Process Hazard Analysis Report July 2020 <br /> 3 Introduction <br /> This report documents the findings of a What-if/ Checklist study conducted for Oak <br /> Ridge Winery for the three (3) anhydrous ammonia processes at the Lodi, CA <br /> facility. Oak Ridge Winery does not exceed the federal threshold of 10,000 pounds <br /> in either of the three processes. However, they have adopted the program 3 <br /> prevention elements to bolster process safety. <br /> For the What-if questions, APCCO used an on-line software system that manages <br /> all aspects of a prevention program called APSM. Checklists were used for <br /> external events and human factor analysis. <br /> 3.1 Objectives <br /> The primary objective of the study was to systematically identify all credible safety <br /> hazards and operability concerns associated with the three (3) anhydrous <br /> ammonia processes. This included a complete review of the design and operation <br /> of the anhydrous ammonia process, and a focus on process safety hazards versus <br /> other occupational safety and health or environmental hazards. What-if combined <br /> with a checklist were used as analysis methods to assist the team in identifying <br /> possible hazards. The What-if methodology is widely recognized as a thorough <br /> process safety hazard analysis method for anhydrous ammonia systems. <br /> A secondary objective was to suggest means to reduce the risks of all the <br /> identified hazards, if the team concluded that a recommendation was justified <br /> based on risk. Where recommendations were made, the risks of the scenario were <br /> evaluated by the team and prioritized according to a qualitative risk ranking <br /> system. <br /> The study team members were guided through a systematic approach designed to <br /> address potentially significant incidents which have the potential to injure workers, <br /> cause damage to the process, cause damage to the environment, or result in <br /> significant business losses and interruptions. A detailed description of the What-if <br /> methodology is given in this report. <br /> 3.2 PHA Team Packet <br /> The PHA team packet that was developed for use during the prior PHA was <br /> distributed to the team members to enhance their understanding of the system. It <br /> was reviewed and revised as needed to reflect the current state of the processes. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.