My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
212
>
2200 - Hazardous Waste Program
>
PR0514288
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 3:48:59 PM
Creation date
8/17/2020 8:43:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0514288
PE
2229
FACILITY_ID
FA0010339
FACILITY_NAME
H&H ENGINEERING CONST INC
STREET_NUMBER
212
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206-3920
APN
17728019
CURRENT_STATUS
01
SITE_LOCATION
212 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Collecting, Processing and Recycling UNIVERSAL WASTE <br /> 6 Should a release occur, respond to it quickly and effectively to <br /> prevent the release of any hazardous constituents into the environ- <br /> ment (air, water or soil). <br /> 7= Accumulate Universal Wastes for no more than one year. Any <br /> reasonable record keeping method can be used to ensure that no <br /> waste remains on-site beyond one year. <br /> 8. Do not accumulate more than 5000 kg (11,000 lbs) of all Universal <br /> Wastes combined at any one time. <br /> 9 , Before reaching the one year or 5000 kg limit, send the wastes to <br /> a recycler, to a permitted disposal facility or to another universal <br /> waste handler. Make sure all shipments conform with any appli- <br /> cble shipping requirements and standards of the US Department of <br /> Transportation (DOT). <br /> Contact the destination facility prior to shipping your <br /> Universal Waste to ensure that they can accept your waste. <br /> 11 , If your shipment is rejected by the destination facility, make <br /> appropriate arrangements to take it back or forward it to an accept- <br /> able destination. <br /> 1 Train your employees, contractors or others who work with these <br /> wastes on correct handling and management of your Universal Wastes. <br /> The Excal Visual training kit is designed to help accomplish this <br /> training requirement. RECEIVED <br /> SEP 0 9 � °� <br /> ENVI IIEALTH <br /> DEPARTMENT <br /> 5 <br /> Leader Guide:eviscpruc_vod <br />
The URL can be used to link to this page
Your browser does not support the video tag.