Laserfiche WebLink
03: <br /> GILASS <br /> S <br /> LIFE <br /> FE <br /> 8.1.2 180-gallon Diesel Fuel AST at Bldg A Fire Pump (on south property <br /> boundary)............................................. .........................................................16 <br /> 8.1.3 Diesel Fuel ASTs at Bldg D Fire Pump (on west property boundary)...........17 <br /> 8.1.4 1,000-gallon Used Oil ASTs (ground level of furnace building) ....................17 <br /> 8.1.5 Three Emergency Generators......................................................................17 <br /> 8.1.6 Two Biosol Mixing Tanks...............................................................................17 <br /> 8.1.7 Drums and Totes Containing Oil ........................................................._..._.....17 <br /> 8.1.8 Transformers and Compressors....................................................................17 <br /> 8.1.9 105 gallon Hydraulic Oil Reservoir for Cardboard Baler...............................18 <br /> 8.1.10 Oil Reservoir for Trash Compacter................................................................18 <br /> 8.2 Offshore Facilities-§112.7 (c)(2) ...................................................................................19 <br /> 9 Oil Spill Contingency Plan and Manpower-§112.7(d) ...........................................................19 <br /> 10. Inspections, Tests, and Records-§112.7(e) .......................................................................... 19 <br /> 10.1 Visual Non-Documented Observations............................................................................19 <br /> 10.2 Monthly Documented Inspections...................................................................................20 <br /> 10.3 Monthly Response Equipment Inspections.....................................................................20 <br /> 10.4 Completed Inspection Forms........ ........ .........................................................................20 <br /> 11. Training & Discharge Prevention-§112.7(f)...........................................................................20 <br /> 11.1 Personnel Training-§ 112.7(f)(1)..................................................................................20 <br /> 11.2 Emergency Coordinator-§112.7(f)(2)............................................................................21 <br /> 11.3 Spill Prevention Briefings-§112.7(f)(3).........................................................................21 <br /> 12. Security-§ 112.7(g)................................................................................................................21 <br /> 12.1 Access Control................................................................................................................21 <br /> 12.2 Flow Drains and Valves...........................................................................................:...:..21 <br /> 12.3 Pump Starter Control......................................................................................................21 <br /> 12.4 Connections to Pipelines ................................................................................................22 <br /> 12.5 Facility Lighting .................. .................... .......................................................................22 <br /> 13 Tank Car&Truck Loading/Unloading Rack-§112.7(h)..........................................................22 <br /> 13.1 Unloading Area Drainage-§112.7(h)(1)................................................................_.......22 <br /> 13.2 Disconnect Warning-§112.7(h)(2)........ .......................................................................22 <br /> 13.3 Examination of Tank Truck Drains-§112.7(h)(3)..........................................................22 <br /> 14. Tank Alterations-§112.7(i)........................................................................................... .........23 <br /> 15. State or Local Spill Prevention Rules-§112.70) ....................................................................23 <br /> 16. Qualified Oil-Filled Operational Equipment-§112.7(k)............................................................23 <br /> 17. SPCC Requirements for Onshore Facilities-§112.8..............................................................24 <br /> 17.1 Facility Drainage-§112.8(b)............ .............................................................................24 <br /> 17.1.1 Valves & Pumps in Diked Areas-§112(8)(b)(1-2)..........................................24 <br /> 17.1.2 Facility Drainage from Undiked Areas-§112.8(b)(3)...................................24 <br /> GHD I Spill Prevention,Control,and Countermeasure(SPCC)Plan 1085405 1 Page ii <br />