Laserfiche WebLink
����' <br /> �N��' <br /> ��� |` v~��m���� ���� <br /> n�� <br /> S <br /> LIFE <br /> �~ <br /> 17.1.3 Cukeda. Guttero. orOthorOnsinmga- -- ------ .....................................24 <br /> 171.4 Drainage Diversion System -§1128���Q-----' --.-.--.-~-.- 24 <br /> 171.5 Facility Drainage Systems-§112.8(b)(5)......................................................24 <br /> 17.2 Bulk Storage Tanks-§1128(:) --' --- ..................................... 24 <br /> 17.21 Tank Compatibility-§112.8(n (1) ................................................... ..........25 <br /> 17.2.2 Secondary Containment-§112.8(c)(2)........................................................25 <br /> 17.23 Draining Secondary Containment Areas-§112.8(c)(3)..................... .........25 <br /> 17.2.4 Buried Metallic Storage Tanks-§112.O(c)(4).......... .......................................26 <br /> 172.5 Partially Buried Metallic Storage Tanks-§1128(c)(5)..............................-25 <br /> 17.2.6 Periodic Integrity Testing-§112.B(c)(G) ................................. .....................25 <br /> 17.27 Internal Heating Coils-§112.8(c)(7).......................................................... '2G <br /> 17.2.8 Fail-Safe Engineering-§112.8(c)(8) ---------'___-_-_.26 <br /> 17.2.9 Pump Cutoff' 112.D (c)(8)(0..........................................................................2G <br /> 17.210 Effluents into Navigable Waters-§112.O(c)(9)..............................................27 <br /> 17.211 Correction ofTank Deficiencies-§112.Q(c)(1O)..............................................27 <br /> 17.2.12 Mobile/Portable Oil Storage Tank-§1138(c)(11)... ..................... ....._,....37 <br /> 17.3 Transfer Operations & In-Plant Process-§112.8(d) ............................... . ...................27 <br /> 17.31 Buried Piping Installations-§112.8(d)(1) .........................- .........................27 <br /> 17.32 Out ofService Piping -§112.8(j (2).............................................................37 <br /> 17.3.3 Piping Support Design-§112.O(d)(B............................. ............... ...... ......27 <br /> 17.3.4 Inspection cfValves and Piping-§112.8(d)(4) ...................................... 27 <br /> 17.3.5 Aboveground Piping-§112.8(d)(5) ' ..... ' ............................................... '27 <br /> 17.4 Onshore Oil Production Facility Drainage-§112S --------.-'-.-.-'-.-.-~�8 <br /> 17.5 Onshore Oil Drilling and VVorkoverFacilities-§1121U.......... .........................................28 <br /> 17.6 Offshore Oil Drilling, Production, VVorkoverFacilities-§112.11...................... ...... ......28 <br /> 177 Anhne| Fats and Oils-Subpart C. §11212-§11215 ...................................................28 <br /> Appendix Index <br /> ex <br /> Appendix Diagrams <br /> Figure Site Location Map <br /> Figure Site Aerial Map <br /> Figure 3 Facility Diagram <br /> Appendix B Tanks &Containment-4O CFR 1127(a)(3) <br /> Tob|c 1 Schedule of Regulated Tanks-4O CFR 1127(a)(3)(i) <br /> Table AST Secondary Containment Volume Calculations <br /> Appendix C Oil Spill Contingency Plan <br /> Table 3 Oil Spill Response Immediate Actions-4O CFR 1127(a)(3)(iv) <br /> Table Spill Response Notification Procedures-4OCFR 1127(s)(4) <br /> Table 5 Emergency Contacts-4O CFR 1127(a)(3)(vi) <br /> Table Disposal Plan-4OCFR 1127(a)(3)(v) <br /> Appendix Inspection Checklists <br /> Appendix Applicability ofSubstantial Harm Criteria Checklist <br /> GHD I Spill Prevention,Control,and Countermeasure(SPCC)Plan 1085405 1 Page iii <br />