Laserfiche WebLink
am' cc <br /> G k 1` S S <br /> I FE <br /> 4. Maximum storage or handling capacity of the Facility and normal daily throughput <br /> 5. Corrective action and countermeasures taken, including a description of equipment repairs <br /> and replacements <br /> 6. An adequate description of the Facility, including maps, flow diagrams, and topographical <br /> maps, as necessary <br /> 7. The cause of such discharge as described in 40 CFR 112.1(b), including a failure analysis of <br /> the system or subsystem in which the failure occurred <br /> 8. Additional preventive measures taken or contemplated to minimize the possibility of <br /> recurrence <br /> 9. Such other information as the EPA Regional Administrator may reasonably require pertinent <br /> to the Plan or discharge <br /> Per§112.4(c)-(f), once the information has been provided to the Regional Administrator, they may <br /> require Owens-Brockway to amend the Plan if he/she finds that it does not meet the requirements <br /> of 40 CFR 112 or that amendment(s) are necessary to prevent and contain discharges from the <br /> Facility based on the information sent in, information provided by state agencies, or an on-Site visit. <br /> Within 30 days from receipt of such notice, Owens-Brockway may submit written information, views, <br /> and arguments on the proposed amendment. After considering all relevant material presented, the <br /> Regional Administrator must either notify Owens-Brockway of any amendment required or rescind <br /> the notice. Owens-Brockway must amend the Plan, as required, within 30 days after such notice, <br /> unless the Regional Administrator, for good cause, specifies another effective date. Owens- <br /> Brockway must implement the amended Plan as soon as possible, but not later than six months <br /> after amending the Plan, unless the Regional Administrator specifies another date. <br /> 5. Amendments to the SPCC by Owners or Operators <br /> - §112.5 <br /> Owens-Brockway will review and evaluate this SPCC Plan after any change in the Facility's design, <br /> construction, operation, or maintenance that materially affects its potential for a discharge. <br /> Revisions to the SPCC Plan, if any are needed, will be made within six months of the review date. <br /> Owens-Brockway will implement any amendments as soon as possible, but not later than <br /> six months following preparation of any amendments. A registered PE will certify any technical <br /> amendments to the SPCC Plan as described above in accordance with 40 CFR 112.3(d).Any <br /> amendments will be kept in Table 7 of Appendix G and PE certifications will be kept in the Plan. <br /> 6. General Requirements for SPCC Plans <br /> The Facility complies with all applicable parts of 40 CFR 112 and does not deviate from any <br /> requirements. <br /> GHD I Spill Prevention,Control, and Countermeasure(SPCC)Plan 1085405 1 Page 10 <br />