Laserfiche WebLink
GENERAL NOTES (CONT. <br /> FINISHES <br /> GYPSUM WALL BOARD ELECTRICAL 6m33311? <br /> 13. THE CONTRACTORS SHALL PROVIDE ANY AND ALL SHORING AND BRACING NECESSARY TO INSURE THE STABILITY OF ANY 1. PROVIDE GYPSUM WALLBOARD, STEEL FRAMING COMPONENTS, AND ACCESSORIES IN ACCORDANCE WITH THE CONTRACT 1. CENTER OF ELECTRICAL AND DATA RECEPTACLE OUTLETS SHALL BE INSTALLED NOT LESS THAN <br /> DOCUMENTS. PRODUCTS SPECIFIED HEREIN ARE AS MANUFACTURED BY U.S. GYPSUM. EQUIVALENT PRODUCTS OF 15" A.F.F. TO THE BOTTOM OF THE OUTLET BOX <br /> AND ALL PARTS OF THE PROJECT DURING CONSTRUCTION. OTHER MANUFACTURERS WILL BE CONSIDERED PROVIDED THEY MEET THOSE ESTABLISHED STANDARDS. MAKE WPO 14. UNLESS SPECIFICALLY SHOWN OR NOTED ON THE DRAWINGS, NO STRUCTURAL MEMBER SHALL BE CUT, NOTCHED, APPROPRIATE SUBMITTAL FOR ANY SUBSTITUTIONS. 2. THE CENTER OF THE GRIP OF THE OPERATING HANDLE OF CONTROLS OR SWITCHES INTENDED TO BE USED BY THE <br /> BORED, OR OTHERWISE WEAKENED WITHOUT THE PERMISSION OF THE ARCHITECT AND LANDLORD OR MALL MANAGEMENT. OCCUPANT OF THE ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS, APPLIANCES. OR COOLING, <br /> 2. ALL WORK SHALL COMPLY WITH FIRE RESISTIVE MATERIALS AND PLASTER AND OTHER APPLICABLE REGULATIONS. HEATING, AND VENTILATING EQUIPMENT SHALL NOT BE MORE THAN <br /> 48" MAX A.F.F. TO THE TOP OF THE OUTLET BOX OR SWITCH. 1113-308.1.1 & 1113-308.1.2 <br /> 15. PRIOR TO THE FINAL PAYMENT, THE CONTRACTOR SHALL DELIVER TO THE OWNER ALL GUARANTEES, WARRANTEES, <br /> MAINTENANCE MANUALS, PARTS LISTS, OPERATING INSTRUCTIONS, AIR BALANCE REPORTS, AS BUILT DRAWINGS AND 3. FINISH 3. THE CENTER OF FIRE ALARM INITIATING DEVICES (BOXES) SHALL BE LOCATED 48" ABOVE THE LEVEL OF THE FLOOR, <br /> COMPLETION OF ALL ITEMS ON THE FINAL PUNCH LIST AND SIGNED BY TENANT. A. WORKING PLATFORM, GROUND SURFACE OR SIDEWALK. SJB Brands, LLC <br /> UNLESS NOTED OTHERWISE (E.G. SPECIAL WALL COVERING AREAS) ALL GYPSUM WALLBOARD SHALL BE TAPED, 17915 SKY PARK CIRCLE, SUITE J, <br /> SPACKLED, AND PAINTED. 4. THE INSTALLATION OF FIRE ALARM EQUIPMENT AND SYSTEMS IN ANY OCCUPANCY WITHIN THE SCOPE OF THESE IRVINE, CA 92614 <br /> 16. UNLESS SPECIFIED OR INDICATED ON DRAWINGS, THE CONTRACTOR SHALL APPLY, INSTALL, CONNECT, ERECT, USE, B• VERIFY ANY SPECIAL FINISH AREA PRIOR TO COMMENCING WORK. REGULATIONS SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF THE LOCAL CODES. TEL: (949)475-0146 <br /> CLEAN, AND CONDITION MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS C. CONTRACTOR IS TO PROVIDE A PAINT ROLLER TEXTURE TO WALLS ONLY. SEE FINISH SCHEDULE FOR EXISTING FAX:(949)475-0137 <br /> CURRENT PRINTED RECOMMENDATIONS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE SUCCESFUL COORDINATION WALLS. <br /> AND INSTALLATION OF OWNERS EQUIPMENT AND FIRE SUPPRESSION SYSTEM. VERIFY SIZES OF THE EQUIPMENT BY <br /> THE OWNER PRIOR TO THE START OF CONSTRUCTION, IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO CHECK THE CEMENTITIOUS BACKER UNITSC.B.U. <br /> DIMENSIONS IN THE FIELD, PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING, HANGERS OR OTHER SUPPORT FOR ( THESE DRAWINGS AND SPECIFICATIONS AND IDEAS, DESIGNS AND <br /> ALL FIXTURES, EQUIPMENT, CABINETRY FURNISHINGS AND ALL OTHER ITEMS REQUIRING THE SAME. 1. REQUIREMENTS ARRANGEMENTS REPRESENTED THEREBY ARE AND SHALL REMAIN <br /> THE PROPERTY OF GARY WANG & ASSOCIATES; AND NO PART <br /> A. SET TILE IN LATEX MODIFIED DRY-SET MORTAR THEREOF SHALL BE COPIED, DISCLOSED To OTHERS OR USED IN <br /> CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE <br /> 2. MATERIALS SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN PREPARED AND <br /> A. CEMENTITIOUS BACKER UNITS - ANSI A118.9. HAZARDS AND PROTRUDING OBJECTS DEVELOPED WITHOUT THE WRITTEN CONSENT OF GARY WANG & <br /> ASSOCIATES. VISUAL CONTACT WITH THESE DRAWINGS AND <br /> B. 2" GLASS FIBER MESH TAPE. 1• OBJECTS PROJECTING FROM WALLS WITH THEIR LEADING EDGES BETWEEN 27" AND 80" ABOVE THE FINISHED FLOOR SPECIFICATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF <br /> THESE RESTRICTIONS. WRITTEN DIMENSIONS ON THESE DRAWINGS <br /> 17. NUMBER OF SPECIFIED ITEMS REQUIRED WHENEVER IN THESE GENERAL NOTES, AN ARTICLE, DEVICE OR PIECE OF C. FASTENERS - NON-CORROSIVE AND NON-OXIDIZING. SHALL PROTRUDE NO MORE THAN 4" INTO WALKS, HALLS, CORRIDORS, PASSAGEWAYS, OR AISLES SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS; <br /> EQUIPMENT IS REFERENCED TO IN THE SINGULAR NUMBER, SUCH REFERENCES APPLY TO AS MANY SUCH ARTICLES ASCONTRACTORS SHALL VERIFY, AND BE RESPONSIBLE FOR ALL <br /> D <br /> ARE SHOWN IN THE DRAWINGS OR REQUIRED TO COMPLETE THE INSTALLATION. GROUT - ANSI A118.6 (USE TYPE RECOMMENDED BY TILE MANUFACTURER) DIMENSIONS AND CONDITIONS ON THE JOB, AND THIS OFFICE <br /> 3. PREPARATION BY CEMENTITIOUS BACKER UNIT INSTALLERS 2. OBJECTS MOUNTED WITH THEIR LEADING EDGES AT OR BELOW 27" ABOVE THE FINISHED FLOOR MAY PROTRUDE ANY MUST N NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS <br /> AND CONDITIONS SHOWN BY THESE DRAWINGS. SHOP DETAIL MUST <br /> A MAXIMUM VARIATION IN THE BACKING SURFACE 18" IN 8'-0" FROM THE REQUIRED PLANE AMOUNT INTO WALKS, HALLS, CORRIDORS, PASSAGE WAYS OR AISLES. BE SUBMITTED TO THIS OFFICE FOR REVIEW BEFORE PROCEEDING <br /> 18. CLEAN UP UPON COMPLETION, REMOVE ALL SURPLUS MATERIAL, EQUIPMENT DEBRIS INCIDENTAL TO THIS WORK, AND / WITH THE FABRICATION. <br /> LEAVE THE PREMISES INA 'VACUUM' CONDITION. <br /> B. HORIZONTAL AND VERTICAL JOINTS AND CORNERS 1/8" SPACING FILLED SOLID WITH LATEX MODIFIED DRIED-SET 3. FREE-STANDING OBJECTS MOUNTED ON POSTS OR PYLONS MAY OVERHANG 12" MAXIMUM FROM 27" TO 80" ABOVE THE ARCHITECT <br /> 19. GUARANTEE MORTAR. GROUND OR FINISHED FLOOR. <br /> THE CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE OR REMEDY ANY FAULTY, IMPROPER OR INFERIOR MATERIALS OR C. GLASS FIBER MESH TAPE-EMBED IN A SKIM COAT OF THE MORTAR OVER JOINTS AND CORNERS <br /> WORKMANSHIP OR ANY DAMAGE TO OTHER WORK RESULTING THEREFROM WITHOUT COSTS TO THE OWNER WHICH SHALL 4. PROTRUDING OBJECTS SHALL NOT REDUCE THE CLEAR WIDTH OF AN ACCESSIBLE ROUTE OR MANEUVERING SPACE. <br /> APPEAR WITHIN ONE YEAR AFTER THE COMPLETION AND ACCEPTANCE OF THE WORK UNDER THIS CONTRACT. 4. INSTALLATION SPECIFICATIONS J4 <br /> A. CEMENTITIOUS BACKER UNITS - ANSI A108.11. 5. WALKS, HALLS, CORRIDORS, PASSAGEWAYS, AISLES OR OTHER CIRCULATION SPACES SHALL HAVE 80" MINIMUM CLEAR GARY WANG <br /> B. TILE-ANSI A108.5. HEAD ROOM. &ASSOCIATES, INC. <br /> C. GROUT - ANSI A108.10. d <br /> 6• ANY OBSTRUCTION THAT OVERHANGS A PEDESTRIAN WAY SHALL BE A MINIMUM OF 80" ABOVE THE WALKING SURFACE <br /> 20. IF ANY CONTRACTOR CLAIMS THAT ANY INSTRUCTIONS FROM THE ARCHITECT OR OWNER INVOLVES EXTRA COST UNDER AS MEASURED FROM THE BOTTOM OF THE OBSTRUCTION. 1000 Corporate Center Suite 550 <br /> THIS CONTRACT, HE SHALL GIVE WRITTEN NOTICE TO THE ARCHITECT AND OWNER THEREOF WITHIN A REASONABLE TIME PAINTING Monterey Park, CA 917544 <br /> AFTER THE RECEIPT OF SUCH INSTRUCTIONS NOT LATER THAN 5 DAYS THEREFROM, AND, IN ANY EVENT, BEFORE 1. SEE FINISH SCHEDULE FOR PAINT PRODUCTS. 7. ALL ROOF PENETRATIONS MUST BE COMPLETED BY THE LANDLORD'S DESIGNATED ROOFING CONTRACTOR AT THE TEL: (626)288-6898 FAX: (626)768-7101 <br /> PROCEEDING TO EXECUTE THE WORK, EXCEPT IN EMERGENCY ENDANGERING LIFE OR PROPERTY, AND THE PROCEDURE TENANTS EXPENSE. http://www.garywang.com <br /> SHALL THEN BE AS PROVIDED FOR CHANGES IN THE WORK, NO SUCH CLAIM SHALL BE VALID UNLESS SO MADE. 2. THE WORK INCLUDES, BUT IS NOT LIMITED TO FURNISHING OF MATERIALS AND EQUIPMENT, AND COMPLETION OF <br /> PAINTING AND PAINTER'S FINISH ON EXPOSED SURFACES AS REQUIRED TO COMPLETE FINISHING OF THE WORK 8• THE TENANT SHALL SLEEVE, FIRE STOP, FLASH AND CAULK ALL FLOOR PENETRATIONS SO THAT THS ODORS AND <br /> INDICATED ON THE DRAWINGS OR SPECIFIED HEREIN. LIQUIDS WILL NOT PENETRATE THE SLAB AT THE OPENINGS. <br /> STAMP <br /> 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE OF MATERIALS AND APPLICATION WITH GOVERNING AGENCIES <br /> 21• THE OWNER SHALL CONTRACT WITH MASTER PROTECTION / FIRE PROTECTION SYSTEM FOR THE 'ANSUL' FIRE ( LOCAL STATE AND FEDERAL) IN CONNECTION WITH THIS PROJECT. <br /> SUPPRESSION SYSTEM. SIGNAGES <br /> 4. THE FOLLOWING EXPOSED SURFACES ARE TO BE PAINTED OR STAINED: <br /> 22. TENANT MUST MAKE A SEPARATE APPLICATION AND PAY A PLAN CHECK FEE FOR ANY AND ALL STORE SIGNS TO THE A. ALL GYPSUM WALLBOARD NOT COVERED BY OTHER MATERIALS. SES ARrl <br /> BUILDING AND SAFETY DEPARTMENT. / <br /> B• ALL EXISTING WALLBOARD TO A MIN. OF 6" ABOVE ROOM CEILING. TYPICAL UNLESS NOTED OTHERWISE ON ROOM FINISH 1. THE SIGNAGE AT THE STOREFRONT WILL BE CONTRACTED DIRECTLY BY THE OWNER. THE GENERAL CONTRACTOR MUST <br /> 23.NO HAZARDOUS WASTE TO BE STORED ON THIS SITE. SCHEDULE. PROVIDE THE REQUIRED J-BOXES AS WELL AS ACCESS PANELS TO ALL NEON SIGNAGE. THE GENERAL CONTRACTOR IS <br /> C. ALL METAL IN IMPROVED AREAS NOT PRE-FINISHED PRIOR TO INSTALLATION. RESPONSIBLE FOR ALL COORDINATION WITH THE SIGN CONTRACTOR AND MAKING SURE THE JOB IS DONE ON TIME. * No 032569 <br /> FULLY DETAILED SHOP DRAWINGS MUST BE SUBMITTED TO THE ARCHITECT FOR REVIEW. THE ACTUAL PLANS ONLY RE .04-;D-_Z,019 <br /> D. ALL WOOD SURFACES, TRIM, OR PIECES NOT PRE-FINISHED PRIOR TO INSTALLATION. (DO NOT PAINT INTERIOR ELEMENTS SHOW LIMITED DESIGN DETAILS AND ARE NOT ADEQUATED FOR CONSTRUCTION OF THE SIGN. A SEPERATE PERMIT WILL (PQ <br /> 24. THE CONTRACTOR SHALL PROVIDE THE BUILDING OWNER, MANAGERIAL AND ORIGINAL OCCUPANTS THE FOLLOWING: NORMALLY CONCEALED SUCH AS STRUCTURAL COMPONENTS). BE REQUIRED. <br /> �F <br /> 5. MATERIALS OF CALF <br /> A. A LIST OF THE HEATING, COOLING, WATER HEATING AND LIGHTING SYSTEMS AND FEATURES, MATERIALS, <br /> COMPONENTS, AND MECHANICAL DEVICES, CONSERVATION OF SOLAR DEVICES INSTALLED IN THE BUILDING AND A. PAINT PRODUCTS SHALL BE MANUFACTURED BY DUNN-EDWARDS OR APPROVED EQUAL. <br /> INSTRUCTION ON HOW TO USE EFFICIENTLY. 2. BARRIER LAWS FOR THE PHYSICALLY HANDICAPPED. (BELOW ARE MINIMUM GUIDELINES PER TITLE 24). SHOULD THERE <br /> B. ACCESSORY MATERIALS SUCH AS TURPENTINE / THINNER / LINSEED OIL SHALL BE APPROVED BY THE COATING BE A CONFLICT BETWEEN THESE MINIMUM REQUIREMENTS AND WHAT IS CALLED FOR ON THE DRAWINGS. THE <br /> B. REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY STATED AND INCORPORATED ON A READILY MANUFACTURE. CONTRACTOR IS TO INFORM THE ARCHITECT PRIOR TO PROCEEDING WITH WORK SO AFFECTED. <br /> ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING THE MAINTENANCE MANUAL. C. THE NUMBER OF COATS IS TO BE THREE MINIMUM. ADDITIONAL COATS SHALL BE APPLIED AT NO ADFDITIONAL COST PROJECT NAME/ADDRESS: <br /> IF NECESSARY TO COMPLETELY HIDE BASE MATERIALS, PRODUCE UNIFORM COLOR, AND PROVIDE SATISFACTORY <br /> FINISH RESULTS. APPLY THE PAINT AS FOLLOWS: <br /> C. A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND RECIRCULATED AIR THAT THE VENTILATION SYSTEM IS JUICE IT UP! <br /> DESIGNED TO PROVIDE TO EACH AREA. 1ST COAT W101 VINYLASTIC <br /> 2ND COAT W440 DECOGIO SEMI-GLOSS ENAMEL RIPON TOWN SQUARE <br /> 3RD COAT W440 DECOGIO SEMI-GLOSS ENAMEL ENTRANCES AND EXITS <br /> C. APPLICATION AND SURFACE PREPARATION SHALL BE DONE ACCORDING TO MANUFACTURER'S WRITTEN SPECIFICATIONS 1. ALL ENTRANCES AND ALL EXTERIOR GROUND FLOOR EXIT DOORS TO BUILDING AND FACILITIES SHALL BE MADE 1201 W. MAIN ST., <br /> AND APPLICATION INSTRUCTIONS. ALL FINISHES SHALL BE APPLIED EVENLY AND BE FREE OF RUNS, SAGS, SKIPS. ACCESSIBLE. RIPON, CA 95366 <br /> 25. EACH HVAC SYSTEM SHALL BE EQUIPPED WITH AT LEAST ONE AUTOMATIC SERVICE TO SETBACK OF SHUTOFF THE CRAWLS OR DEFECTS. 2. EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE <br /> SYSTEM DURING PERIODS OF NON-USE OR ALTERNATE USE OF THE BUILDING SPACES OR ZONES SERVED BY THE OR EFFORT. <br /> SYSTEM. EXCEPTION SMALL AUXILLARY HVAC SYSTEMS WHOSE INPUT POWER IS LESS THAN 500 WATTS MAY HAVE <br /> READILY ACCESSIBLE MANUAL ON/OFF SWITCHING INSTEAD. D. THE CONTRACTOR SHALL PROTECT HIS OWN WORK, AND ADJACENT WORK AND MATERIALS, WITH SUITABLE 3. MANUALLY OPERATED EDGE OR SURFACE MOUNTED FLUSH BOLTS AND SURFACE BOLTS ARE PROHIBITED. WHEN EXIT <br /> COVERINGS OR MASKINGS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR CLEANING THE AREA OF HIS WORK DOORS ARE USED IN PAIRS AND APPROVED AUTOMATIC FLUSH BOLTS ARE USED, THE DOOR LEAF HAVING THE REVISIONS: <br /> AS WELL AS REMOVAL OF EXCESS MATERIAL (EITHER FROM ADJACENT SURFACES OR EXTRA MATERIALS). AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR KNOBS OR SURFACE MOUNTED HARDWARE. THE UNLATCHING OF ANY - <br /> 26. AUTOMATIC TEMPERATURE CONTROLS FOR HVAC SYSTEMS SHALL COMPLY WITH THE FOLLOWING: LEAF SHALL NOT REQUIRE MORE THAN ONE OPERATION. 0 _ <br /> E. SURFACES TO BE PAINTED OR STAINED SHALL BE FREE OF OIL GREASE, LOOSE PAINT, OR OTHER FOREIGN Q <br /> A. EACH ZONE SHALL BE PROVIDED WITH AT LEAST ONE AUTOMATIC TEMPERATURE CONTROL FOR THAT ZONE. MATERIAL. 4. LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE OPERABLE ZL <br /> 6. VERIFY FINISHES ON SIGNAGE WITH ARCHITECT. ALL METAL PAINT TO BE AUTO BODY PAINT. <br /> WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE. PANIC BARS, PUSH-PULL ACTIVATION BARS, OR OTHER HARDWARE <br /> B. MAINTAIN SPACE TEMPERATURE SET POINTS FROM 55°F TO 85°F DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE OPENING HARDWARE. LOCKED EXIT - <br /> DOORS SHALL OPERATE AS ABOVE IN EGRESS DIRECTION. ©C. OPERATE ZONE HEATING AND COOLING IN SEQUENCE IF BOTH ARE PROVIDED. CABINET WORK 8 - <br /> D. PROVIDE A TEMPERATURE RANGE ADJUSTABLE UP TO 10 DEGREES BETWEEN FULL HEATING AND FULL COOLING TO 1. MAKE ALL FINISHED WORK PER THE DETAILED DRAWINGS AND GRADE REQUIREMENTS OF THE WOODWORK INSTITUTE , 5. HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 34" AND 44" ABOVE THE FLOOR. <br /> THE ZONE. 'MANUAL Or MILLWORK' (W.I.C.) <br /> ISSUE DATE: <br /> 27. AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED, SEALED AND INSULATED. 2. TAKE SUCH FIELD MEASUREMENTS AS MAY BE REQUIRED. 6. EVERY DOORWAY LOCATED WITHIN AN ACCESSIBLE PATH OF TRAVEL SHALL BE OF A SIZE AS TO PERMIT THE 1sT - <br /> INSTALLATION OF A DOOR NOT LESS THAN 3 FEET IN WIDTH AND NOT LESS THAN 6'-8" IN HEIGHT. WHEN INSTALLED, <br /> 3. ALL FINISHED WOOD AND CABINET MATERIALS SHALL HAVE MOISTURE CONTENT NOT EXCEEDING 12 % BY WEIGHT. EXIT DOORS SHALL BE CAPABLE OF OPENING SO THAT THE CLEAR WIDTH OF THE EXIT IS NOT LESS THAN 32". 2ND - <br /> 28. MECHANICAL VENTILATION SUPPLY AND EXHAUST SYSTEMS WITH MORE THAN 5000 CFM OF AIR SHALL BE PROVIDED 3RD - <br /> WITRH AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN. 4TH - <br /> 4• PLASTIC LAMINATE FINISHING SHALL CONFORM TO REQUIREMENTS OF ARCHITECTURAL WOODWORK INSTITUTE. 'QUALITY 7. THERE SHALL BE A LEVEL AND CLEAR FLOOR OR LANDING ON EACH SIDE OF A DOOR. THE LEVEL AREA SHALL HAVE A <br /> STANDARDS' FOR 'CUSTOM' GRADE AND NOTES CONTAINED HEREIN. LENGTH IN THE DIRECTION OF DOOR SWING OF AT LEAST 60" AND THE LENGTH OPPOSITE THE DIRECTION OF DOOR 5TH <br /> 29. GRAVITY VENTILATION SYSTEM SHALL BE PROVIDED WITH AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SWING OF 48" AS MEASURED AT RIGHT ANGLE TO THE PLANE OF THE DOOR IN THE CLOSED POSITION. 6TH <br /> SHUTDOWN. <br /> 5. INSTALLATION <br /> 30. GRAVITY VENTILATION SYSTEM SHALL BE PROVIDED WITH AUTOMATIC OR READILY ACCESSIBLE MANUALLY OPERATED INSTALL UNITS LEVEL AND PLUMB WITH TIGHT JOINTS BETWEEN ANY MULTIPLE UNITS. SCRIBE TO WALL AND OTHER 8. THE FLOOR OR LANDING SHALL BE NOT MORE THAN 1/2" LOWER THAN THE THRESHOLD BEVELED OF THE DOORWAY. JOB NUMBER <br /> DAMPERS IN ALL OPENINGS TO THE OUTSIDE, EXCEPT COMBUSTION AIR OPENINGS. SURFACES AS REQUIRED. ADJUST ALL DRAWERS, DOORS AND MOVABLE PARTS TO OPERATE EASILY AND SMOOTHLY <br /> WITHOUT BINDING. <br /> 31. THE AUTOMATIC SPRINKLER SYSTEM SHALL BE FULLY OPERABLE WITHIN THE ENTIRE COVERED MALL BUILDING AND 9. DOORS SHALL HAVE A SMOOTH UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR <br /> FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION WHERE NARROW FRAME DOORS ARE USED. A 10" ARCH PROJECT#: 18-287 <br /> APPROVED BY THE FIELD FIRE INSPECTOR PRIOR TO THE OCCUPANCY AIR OPENINGS. 6. ALL DRAWERS TO BE FULL EXTENSION SIDES WITH A 75 LBS. LOAD CAPACITY. HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE <br /> 7. ALL CORIAN COUNTERTOP JOINTS TO BE EQUALLY SPACED. OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. <br /> 8. MILLWORK CONTRACTOR IS TO PROVIDE SHOP DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. DRAWN BY CHECKED BY <br /> 10. RECESSED DOOR MATS SHALLBE ADEQUATELY ANCHORED TO PREVENT INTERFERENCE WITH WHEELCHAIR TRAFFIC. JR ADR <br /> 9. THE GENERAL CONTRACTOR AND MILLWORK CONTRACTOR ARE TO COORDINATE AND INSTALL ALL REQUIRED BLOCKING. <br /> ANGLE BRACES, SUPPORTS, ETC. TO ADEQUATELY SUPPORT ALL COUNTERS. SHEET CONTENT <br /> 11. MAXIMUM EFFORT TO OPERATED DOORS SHALL NOT EXCEED 5 1/2 LBF FOR EXTERIOR DOORS AND 5 POUNDS FOR <br /> INTERIOR DOORS. SUCH PUSH OR PULL EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE <br /> 10. FINISHES CENTER PLANE OF SLIDING OR FOLDING DOORS. COMPENSATION DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE GENERAL NOTES <br /> COUNTERTOP FINISH PER FINISH SCHEDULE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE <br /> CABINET FACES PER FINISH SCHEDULE DOOR MAY BE INCREASED TO THE MAXIMUM ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY. NOT TO <br /> EXCEED 15 POUNDS. <br /> SHEET NO <br /> 11. HARDWARE PER FLOOR PLAN AND FINISH SCHEDULE (TYP.) <br /> HINGE TEN MFG. INC. SELF CLOSING HINGE - PAT. #5.103.532 <br /> PROVIDED BY EB. BRADLEY MODEL #TNI - CONTACT: <br /> (213) 585-9201 T� l <br /> ■ <br />