My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:56:10 AM
Creation date
8/18/2020 10:13:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overfill Protection Testing Testing Procedure <br /> MINIMUM IN IMMUNE I INSURE 111 ilil!liiiiiiiiiii <br /> c. Print the Tank Inventory Report. <br /> d. Test the relay assigned to the external Overfill alarm (if present) to insure the Overfill alarm works. <br /> 1 . If the Overfill alarm does not sound , repair the device before continuing testing. <br /> 3 . Testing <br /> a. Turn off power to the console. <br /> b. Disconnect the probe from the field wiring and remove it from the riser. <br /> 1 . If you are testing more than one tank remove all the probes from their risers. <br /> c. Lay the probe safely on the ground and reattach the field wiring . <br /> d. Position the water float at the bottom of the probe and the product float 25% up from the bottom of the <br /> probe. <br /> e. Power the console back on . <br /> f. Simulate a delivery as follows : <br /> 1 . Move the float towards the top of the probe at a rate of 1 - 2" per ten seconds. <br /> 2 . Continue moving the float to the top of the probe at a rate of 14' per ten seconds for the next 50 <br /> seconds , the probe is now in delivery mode. <br /> 3. Slide the float at a moderate speed to the top of the probe. Note to not slam the float against the head <br /> of the probe, this can damage the float. <br /> g. Once the float reaches the overfill level the Overfill alarm , including external Overfill alarm (if present) , will <br /> sound . <br /> h . Silence the Overfill alarm on the TLS and external Overfill alarm (if present) by acknowledging it. <br /> i. Move the float down to the bottom of the probe. The TLS will clear the Overfill alarm once the delivery delay <br /> time is complete. <br /> j . Repeat 3f 3i for the other probes. <br /> 4 . Test Completion <br /> a. Print out the delivery report for all tanks tested . <br /> b. Power off the console. <br /> I <br /> E c. Replace the probes back into the tank , before inserting into riser, ensure that the floats are positioned at the <br /> bottom of the probe. <br /> E <br /> d . Power on the console. <br /> e. If the console is running BIR enter a manual adjustment for the amount of the delivery. <br /> i f. If the site is not running BIR give the delivery report to the store manager so they can log the delivery as <br /> part of the overfill testing . <br /> i <br /> EEE <br /> t <br /> 25 <br /> r <br /> I'; <br />
The URL can be used to link to this page
Your browser does not support the video tag.