My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 11:48:24 AM
Creation date
8/18/2020 11:41:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #132
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POMECO Multi-Port Spill Container Manhole <br /> Installation Instructions 3 . Remove the cover and measure the distance <br /> from the top of the tanks to the final grade . <br /> 1 . Mark off finish grade . (See Figure 1 . ) <br /> 4 . Cut the riser(s) from the underground tank so <br /> Finish Grade that both the fill and vapor risers are set below <br /> the final grade . Use the dimensions below: <br /> Spill Container Inches below grade ( L) <br /> 5 Gal . Cast Iron Base 15 '/" <br /> g 5 Gal , Composite Base 17 '/" <br /> Figure 1 7 . 5 Gal . Cast Iron Base 19 '/" <br /> 7 . 5 Gal , Composite Base 21 '/2" <br /> 2 . Set multi-port manhole assembly (skirt , ring , and Note: Add an extra 34/4 " when using an OPW <br /> cover) to the final grade position . (See Figure FSA400 Face Seal Adaptor. (See Figure 2.) <br /> 2 . ) <br /> 5 . Deburr and thoroughly clean riser pipe (s) . <br /> Finish Grade 6 . Apply pipe dope to riser(s) . The pipe dope is to <br /> be a non -hardening , gasoline resistant , pipe <br /> thread seal compound . <br /> 7 . Install OPW FSA400 Face Seal Adapter onto <br /> riser. ( Recommend Torque , 4" NPT , 125 ft-lbs <br /> min . to 250 ft- lbs max. ) . Apply pipe dope to <br /> FSA-400 . The pipe dope is to be a non - <br /> hardening , gasoline resistant , pipe thread seal <br /> compound . This is optional for spill containers <br /> that are on the vapor lines . <br /> 8 . Thread the spill containers on hand tight. <br /> Note : Do NOT attempt to completely tighten the <br /> Figure 2 containment bucket by using the containment <br /> bucket mounting ring at the top of the bucket. <br /> Note : It is strongly recommended that POMECO 9 . Inspect the containment bucket gasket(s) and <br /> covers be installed with the following minimum the ring gasket for damage . Replace the <br /> clearances . Sheet metal skirts should have gasket(s) if they are damaged , <br /> adequate clearance between the tank sump riser 10 . Apply an even bead of PISCES SL- 1100 to the <br /> sidewall and or the sump top hat. A minimum of topside of the containment bucket gasket(s) . <br /> one and a half inches clearance on all sides is (See Figure 4 . ) <br /> recommended between the POMECO skirt and <br /> the tank sump wall or the sump top hat wall . A ,- 4ont�ainSm'ent <br /> L- 1100 <br /> minimum of two inches clearance is `• <br /> recommended between the bottom of the � � <br /> • ing <br /> POMECO skirt and the horizontal surface of theasket <br /> tank sump or sumptop hat . These clearances <br /> are recommended to allow adequate water <br /> migration away from the sumps . Great careshould be used to maintain the recommended <br /> clearances when setting the rings and pouring Bucket <br /> the concrete . ( See Figure 3 . ) Gasket <br /> Figure 4 <br /> c <br /> 1 %2 Min 11 . Apply an even bead of PISCES SL- 1100 to the <br /> topside of the ring gasket . (See Figure 4 . ) <br /> 12 . Replace the multi- port cover, centering the <br /> riser(s) as close as possible in the containment <br /> openings . Be very careful not to move or <br /> damage the gaskets . <br /> Figure 3 <br /> i <br /> POMECO Multi port Spill Container Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.