Laserfiche WebLink
13 . Using the 61 SA-TOOL , tighten the spill 19 . Apply an even bead of PISCES SL- 1100 around <br /> container(s) onto the riser( s) with a minimum the 5116 " hex bolts after final tightening . <br /> torque of 125 ft. -lbs . and a maximum torque of 20 . Install the spill bucket covers . (See Figure 6 . ) <br /> 250 ftAbs . <br /> 14 . The bolt holes in the multi -port cover must line 21 . (Optional) : Install the product identification disc <br /> up with the bolt holes in the containment bucket on the spill bucket cover and multi -port cover in <br /> mounting ring . the I . D . disc recess . <br /> 15 . Maintenance or as needed : Apply an even bead 22 . Cover the multi -port perimeter ring and cover <br /> of PISCES SL- 1100 onto the bottom of the with plastic to prevent concrete from settling in <br /> mounting ring before assembling the the drainage areas . <br /> containment bucket mounting ring and the 23 . It is required that the perimeter ring and skirt <br /> mounting ring onto the multi-port cover. (See assembly , and the multi -port cover be set as an <br /> Figure 5 . ) assembled unit, with the bolts engaged . Failure <br /> to engage the bolts may result in the distortion of <br /> Bolt Beveled Washer the ring and improper fit of the ring to cover after <br /> evel Facing Down) the concrete is poured . <br /> j Mounting Ring i ,, , hread Seal Washer 24 . When pouring the concrete , hand shovel or <br /> trowel the concrete around the multi-port <br /> SCES SL4100 assembly to prevent the unit from moving or <br /> I <br /> shifting , which can cause alignment problems <br /> and future maintenance problems . <br /> ontainment Bucket Note : Do not stand on the multi -port before the <br /> r Mounting Ring concrete has set up . <br /> 25 . It is recommended that the paved contours <br /> around POMECO covers be adequately sloped <br /> to direct water flow away from the cover, and <br /> Figure 5 directing water runoff from adjacent areas away <br /> from POMECO covers . (See Figure 7 . ) <br /> 16 . Install the beveled thread seal flat washer and <br /> the thread seal washer onto the bolts for the <br /> mounting ring . (See Figure 5 . ) � - 3 <br /> Note : Install the beveled thread seal flat washer <br /> on the bolt with the beveled surface away from <br /> the bolt head . Install the thread seal washer to <br /> seat between the flat washer and the mounting <br /> ring . <br /> 17 . Apply PISCES SL- 1100 to each bolt prior to <br /> inserting them into the mounting ring . <br /> 18 . Tighten the mounting ring retaining bolts until <br /> the containment bucket gasket makes contact <br /> with the multi-port cover. Then , in a crossing Figure 7 <br /> pattern , torque the bolts down between 15 to 20 <br /> ftAbs . <br /> 26 . Remove the plastic after the concrete has set <br /> up . <br /> 27 . After installation is complete , water test the <br /> O O multi -port fixture . The recommended water test <br /> procedures include : <br /> a) Spraying water on cover(s) for 5 to 10 <br /> minutes , using a commonly available <br /> watering device such as a lawn sprinkler. <br /> Q 0 b) Standing water test, not to exceed 1/213 in <br /> water depth for a period of 5 to 10 minutes . <br /> Note : The containment bucket consists of three <br /> components steel top ring , bellows , and bucket <br /> bottom . These parts are held together with stainless <br /> steel retaining bands . <br /> Figure 6 <br /> POMECO Multi port Spill Container Page 3 <br />