DO NOT loosen the stainless steel retaining bands <br /> securing the bellows to the containment bucket top Testing Spill Containers <br /> ring or the containment bucket bottom . Loosening Use California Test Procedures , Their Test <br /> the retaining bands voids any and all warranties on Procedures will check the seals between the drain <br /> this product , valve , nipple and rotatable adapter. To test the spill <br /> containers base and bellows fill the container with <br /> Warning: water. A drop in the water level of 1 /16" or greater <br /> If the cover is removed, for any reason, follow after one hour means that a leak exists . To <br /> the Service and Maintenance instruction as determine where the leak is , look for a steady <br /> noted. Always remove the existing _gaskets and stream of bubbles coming from one of the joints or <br /> install new _gaskets. Never reuse the old water leaking on the outside of the bucket . NOTE : <br /> _gaskets. Reuse of _gaskets may result in an Do not drain the water into the UST after the test is <br /> improper seal. complete . Water must be disposed of per local <br /> requirements for hazardous waste . If the leak <br /> Operation and Maintenance : cannot be corrected the spill container should be <br /> After each fuel delivery , the operator must replaced with another, <br /> remove any standing fuel from the container. <br /> Fuel can be removed by actuating the drain POMECO recommends periodic inspection of covers <br /> valve or with a gasoline absorbing disposable and seals as a part of the regularly scheduled <br /> towel . Annually : Inspect and clean the interior maintenance program . If any of the seals are <br /> of the spill container and drain valve screen . damage they should be replace . Only qualified , <br /> competent, well -trained technicians should perform <br /> Remove accumulated dirt and grit . If the drain maintenance . <br /> valve screen becomes clogged , remove the Note : Common sense and good judgment should <br /> valve , soak in water and use high - pressure air to always be exercised . The contractor' s <br /> clean . Reinstall the drain valve to its proper position understanding of all related site conditions prior to <br /> and test the valve per the appropriate California Test starting the project is essential . If the contractor <br /> Procedure . If problems persist , replace the drain does not have a clear understanding of the required <br /> valve with P/N 1 DK-2100 - EVR (specified torque work and site conditions , the contractor is advised to <br /> 11 . 5 ft- lbs min to 13 . 5 ft-lbs max , 5/ 16 - 18 UN seek clarification prior to starting any portion of the <br /> thread ) . The sealable cover ( 1 SC) adjustment project . <br /> nut is set at the factory , but due to <br /> environmental conditions it may be necessary <br /> to adjust it to either improve sealing or ease <br /> cover removal . Important : Leave these instructions with Station <br /> Operator as per CARIB Requirements <br /> R E 047 E= D <br /> APR 2 4 ? 01q <br /> VVM _ <br /> A DDIIER COMPANY ENVIRONMENTAL HEALTH <br /> P . O . Box 405003 * Cincinnati , Ohio 45240-5003 DEPARTMENT <br /> 1 -800422-2525 Domestically <br /> 513 -870-3315 Internationally <br /> Marketing Agent for POMECO by OPW, Inc . <br /> Copyright , 2002 - OPW Fueling Components Inc . , Cincinnati , OH <br /> Printed in U . S .A . p/n H14976PA — 09/02 <br /> POMECO Multi port Spill Container Page 4 <br />