My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUPONT
>
1351
>
4800 – General/Other Program
>
PR0528782
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 5:11:44 PM
Creation date
8/19/2020 4:45:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528782
PE
1863
FACILITY_ID
FA0016553
FACILITY_NAME
DREYERS GRAND ICE CREAM
STREET_NUMBER
1351
STREET_NAME
DUPONT
STREET_TYPE
CT
City
MANTECA
Zip
95336-6004
APN
22121019
CURRENT_STATUS
01
SITE_LOCATION
1351 DUPONT CT
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY— <br /> (1)The date of the most recent incident investigation and the expected date of completion of any changes <br /> resulting from the investigation: <br /> (m)The date of the most recent review or revision of employee participation plans: <br /> 7/28/2020 <br /> (n)The date of the most recent review or revision of hot work permit procedures: <br /> 7/28/2020 <br /> (o)The date of the most recent review or revision of contractor safety procedures: <br /> 7/28/2020 <br /> (p)The date of the most recent evaluation of contractor safety performance: <br /> 6/28/2019 <br /> (q)The owner or operator shall submit the following external events analysis information: <br /> (1)The types of natural and human caused external events considered in PHA Section 2760.2: <br /> External Events Analysis is on the following page. <br /> (2) The magnitude or scope of external events which were considered. If not known, the owner or <br /> operator of the stationary source shall work closely with the AA to determine what is required. If seismic <br /> events are applicable,the parameters used in the consideration of the seismic analysis and which edition <br /> of the Uniform Building Code was used when the process was designed: <br /> External Events Analysis is on the following page. <br /> (3) For each external event, with a potential to create a release of a regulated substance that will an <br /> endpoint offsite, apply Sections (e)(1)through (e)(6): <br /> External Events Analysis is on the following page. <br /> (4)The date of the most recent field investigation that equipment is installed and maintained as designed: <br /> 7/28/2020 <br /> 19 of 22 <br /> Doc ID:6a6ea4fac281501cd30efa4128b75fd8a1870d1a <br />
The URL can be used to link to this page
Your browser does not support the video tag.