My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
2200 - Hazardous Waste Program
>
PR0541357
>
COMPLIANCE INFO_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 12:17:07 PM
Creation date
8/24/2020 10:54:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017
RECORD_ID
PR0541357
PE
2220
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
YMoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VA <br /> DEC 0 2 201 <br /> ffAl <br /> ABF <br /> JIF Frefght Emergency Action and Fire Prevention Plan <br /> Thefollowi' I <br /> �tg Emergency Action and Fire Prevention Pian meet the requirements in part 1810.38 and 1910.39 of the OSHA <br /> regulationsAll employees must be familiar with, able to implement, and strictly adhere to the plan as prescribed below and <br /> depicted in ,the site specific plan at each terminal facility . <br /> Elements of ABF Freight System, Inc.`s Emergency Action and Fire Prevention Plan include: <br /> « FIire or other emergency reporting procedures <br /> • Procedures to follow in the event of an Earthquake, Tornado, or Hurricane <br /> • Emergency evacuation procedures <br /> • I�rocedures for any employees that remain during an evacuation <br /> • procedures to account for employees after evacuating <br /> • I Irocedures for medical or rescue responsibility <br /> • Training for designated employees <br /> • emergency Action and Fire Prevention Plan update and review <br /> • Procedures to control accumulation of flammable and combustible waste material <br /> e rocedures for maintenance of safeguards to prevent accidental ignition <br /> • ire Protection Equipment <br /> Fire or or Enter ency Re ortin -Proc e <br /> All fires or other emergencies should be immediately reported by one of the following preferred means: <br /> It . Verbally by telephone or word of mouth to an onAuty manager or supervisor <br /> r�. By public address system (if applicable) <br /> �34 By the alarm system <br /> 4. Verbally by telephone or word of mouth to local authorities <br /> In the attached sites specific emergency action and fire prevention plan . <br /> :Please use the preferred reporting method indicated i <br /> E <br /> E rt�uafre <br />= All employees should take cover and hold in the event of an earthquake. Shelter can be taken by getting under a desk, <br /> table, or in a door frame while facing away from any windows. If employees are outside in the event of an earthquake, <br /> proceed t the nearest open space away from buildings or overhangs and do not reenter the building, After the earthquake <br /> stops, employees inside the building should check for personal injury and evacuate the building if necessary according to <br /> the Emer ency Evacuation Procedure. <br /> Torndeo <br /> In the event that an ABF freight facility is in eminent danger from a Tornado, employees should take cover on the lowest <br /> floor possible either in small interior rooms or hallways away from doors or windows, {ince in shelter, employees should <br /> protect thir heads with their arms and crouch down. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.