My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
1900 - Hazardous Materials Program
>
PR0519535
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 10:48:50 AM
Creation date
8/24/2020 5:11:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519535
PE
1921
FACILITY_ID
FA0006674
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209-240-24
CURRENT_STATUS
01
SITE_LOCATION
14700 W SCHULTE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aqueous Ammonia 19% SCR System Operating Procedures <br /> These operations are only to be performed by a qualified and trained operator. <br /> Refer to the following documents for additional information: <br /> • Aqueous Ammonia 19%Safety Data Sheet (Safety and Health Considerations) <br /> • Overall System Description <br /> • Piping and Instrumentation Diagrams <br /> • LECHLER Operation and Maintenance Manual <br /> Refer to the Maintenance Section for information on Equipment Inspections. <br /> NOTE: * is used to denote the injection point designation (180, 280, or 380). <br /> Initial Startup <br /> (1) Pump DI water through the system to verify there are no leaks and that the system is <br /> functioning properly. <br /> (2) After the skid is primed, start the pump (see pumps below) against the closed control <br /> valve FCV*V1. <br /> (3) When startup pressure PTS-*P4 are reached, pneumatic control valves FCV*V1 are <br /> opened to a predetermined set point (i.e. 20%) until the standpipe and ring mains are <br /> filled. <br /> (4) The control valve%open setting can be slowly increased to attain up to%of the maximum <br /> flow rate during filling. <br /> Note: An alternative method is to connect DI water to a drain ball valve and fill the <br /> standpipe and ring mains. <br /> • Max Injected Fluid SCR A: 0.22 gpm <br /> • Max Injected Fluid SCR B: 0.22 gpm <br /> • Max Injected Fluid SCR C: 0.16 gpm <br /> (5) Turn on the compressed air. <br /> (6) Verify the I/O are operational and functioning properly. <br /> Operational Readiness <br /> (1) The injection is in Automatic Mode. <br /> (2) The storage tank level is above 65%. <br /> (3) Pumps P80P1 or P80132 is ready for operation. Note: Pump selection is based on injection <br /> location. <br /> (4) Control valves FCV*V1 in the injection line must be closed. Note: Control valve selection <br /> is based on injection location. <br /> (5) Pneumatic ball valve FCV*V2 in the liquid line must be open. <br /> (6) Atomizing air pressure is available. <br /> (7) Pneumatic ball valve FCV-*V3 in the atomizing air line must be open. <br /> Page I B-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.