My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200 = 17 <br /> 10 . SHEAF VALVE <br /> INSPECTION AND <br /> TESTING <br /> r <br /> 10. 1 General . Shear valves are also known as emergen- , <br /> cy shutoff valves , crash valves or impact valves . They are <br /> located on the product lines and sometimes on the vapor <br /> lines inside each dispenser. They must be located at grade <br /> level and securely anchored to function as intended, They r ' <br /> immediately block fuel or vapor flow if a dispenser is dis- <br /> placed from its regular position or if a fire occurs inside <br /> the dispenser. <br /> NOTE Authorities having jurisdiction (AHJs) <br /> may require shear valves to be inspected and r <br /> tested regularly. Furthermore, if a dispenser <br /> is dislodged from its normal position on the �! <br /> island after being hit by a vehicle or after a <br /> drive-off occurs , the shear valve should be <br /> inspected and tested for proper operation. <br /> If product is dispensed using a submersible pump, a shear - <br /> valve must be present on each product riser at the base of FIGURE 104. When activated by fire or <br /> the dispenser. impact, the shear valve closes and blocks <br /> fuel flow from the dispenser supply lines. The <br /> 10. 2 Product Shear Valves . shear valve shown is in the closed position. <br /> 10 . 2. 1 Purpose. The purpose of this test and 10.2. 5 Test Procedure. <br /> inspection is to verify that the product shear valves <br /> are properly installed per manufacturer ' s specifica- 1. Inspect the product shear valve for proper instal- <br /> tion and verify that product will no longer flow lation and anchoring. The portion of the shear <br /> through a product shear valve that is in the closed valve located below the shear section must be <br /> position , rigidly anchored to the dispenser box frame or <br /> the concrete dispenser island using hardware <br /> 10. 2.2 Description of Test . The product shear and materials specifically designed for this pur- <br /> valve is inspected for proper installation per the pose . If the shear valve is not properly anchored, <br /> manufacturer. The product shear valve arm is then close the shear valve, remove the dispenser from <br /> tripped to stop the flow of fuel into the dispenser, service and notify the appropriate person to have <br /> An attempt is made to pump product through the ft repaired. <br /> nozzle with the shear valve in the closed position. <br /> 2. Trip the product shear valve. <br /> 10.2. 3 Preparation . Barricade the entire dis- 3 . Attempt to pump fuel through the nozzle into the <br /> penser that is to be inspected and tested so that no <br /> test can. <br /> customers will attempt to pump fuel. Open the dis- <br /> penser cover to access the inside of the dispenser. 4. Using the wrench, reset the product shear valve <br /> arm into the open position . <br /> 10 . 2 .4 Test Equipment . Test equipment shall <br /> include : 5. Place the cover back on the dispenser and <br /> remove barricades . <br /> • 5-gallon metal test can; <br /> 11 / 16 -inch box wrench or properly sized 10. 2. 6 Pass/ Fail Criteria . If a product shear <br /> • valve meets all of the following criteria, it passes <br /> wrench. the test: <br /> c pei . org <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.