My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 4:36:01 PM
Creation date
8/25/2020 11:10:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • properly anchored to the dispenser box frame or 10.3 .4 Test Equipment. None, this is a visual <br /> dispenser island; inspection . <br /> • shear section located between I/2 inch above and 10.3 . 5 Test Procedure. <br /> %2 inch below the level of the top surface of the <br /> 1. <br /> dispenser island; Inspect the vapor shear valve for proper <br /> installation and anchoring . The portion of the <br /> • lever arm free to rotate and able to snap the pop- shear valve located below the shear section <br /> pet valve shut/closed; must be rigidly anchored to the dispenser box <br /> • appropriate plug properly installed in the test frame or the concrete dispenser island using <br /> poi, hardware and materials specifically designed <br /> for this purpose. The portion above the shear <br /> • no fuel flow from the dispensing nozzle when section must be rigidly mounted to the inside of <br /> the product shear valve is closed. the dispenser. If the shear valve is not properly <br /> If any one of the passing criteria noted above is not anchored, notify the appropriate person to have <br /> met, then the shear valve fails the test, it repaired, <br /> 2. Place the cover back on the dispenser and <br /> 10.3 Vapor Shear Valves : remove barricades . <br /> 10.3 .1 Purpose. The purpose of this test and 10.3 .6 Pass/Fail Criteria. If a vapor shear valve <br /> inspection is to verify that the vapor shear valves, meets all of the following criteria, it passes the test: <br /> if present, are properly installed per manufacturer 's <br /> specification. properly anchored to the dispenser box frame or <br /> dispenser island; <br /> 10 .3.2 Description of Test. The vapor shear <br /> valve is inspected for proper installation per the shear section located between %2 inch above and <br /> manufacturer. I/2 inch below the level of the top surface of the <br /> dispenser island. <br /> 16.3.3 Preparation . Barricade the entire dis- <br /> penser that is to be inspected and tested so that no If any one of the passing criteria noted above is not <br /> customers will attempt to pump fuel. Open the dis- met, then the' shear valve fails the test. <br /> penser cover to access the inside of the dispenser. <br /> i <br /> i <br /> I <br /> peLorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.