Laserfiche WebLink
SWRCB, January 2002 Page 2 of 2 <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : Piping Manufacturer ' Industry Standard F; Professional Engineer <br /> Other (Specify) <br /> Test Method Used By : Wo Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used : gauge Equipment Resolution : .20 <br /> (Tank t4 - SUPREME) <br /> STP Containment 1 to <br /> 1/23 3/4, 5/65 7/8 <br /> Piping Material : dw fiberglass <br /> Piping Manufacturer : smith <br /> Piping Diameter: 3 in. in, in. in. <br /> Length of Piping Run : 200 ft <br /> Product Stored: SUPREME <br /> Method and location of <br /> sump <br /> piping-run isolation : <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min min min min <br /> starting test : <br /> Test Start Time: 11 :05 :00 <br /> Initial Reading (RI): 5 .00000 PSI <br /> Test End Time : 12 :05 :00 <br /> Final Reading (RF): 5 .00000 PSI <br /> Test Duration: I hr <br /> Change in Reading (RF-RI): 0.00000 PSI <br /> Pass/Fail Threshold or +/- 0.00000 +/- <br /> Criteria: <br /> Test Result : Pass <br /> Comments - (include information on repairs made prior to testing, and recovnnended follow-zip for failed tests) <br /> t <br /> WO : 2339260 <br />