My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 4:30:09 PM
Creation date
8/25/2020 2:28:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 1 of 2 <br /> 5 . SECONDARY PIPE TESTING <br /> Test Method Developed By : Piping Manufacturer r Industry Standard Professional Engineer <br /> �- Other (Specify) <br /> Test Method Used By : W Pressure r7 Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used : gauge Equipment Resolution : .20 <br /> (Tank t1 - REG (Tanktl - REG Product Pipe for reg 1 Product Pipe for reg 1 <br /> UNLEAD) STP UNLEAD) STP to reg 2 to reg 3 <br /> Containment 1 to 1 /2, Containment 1 to 1 /2 <br /> Piping Material : 3/4, 5/6, '7/8 3/4, 5/6,' 7/8 dw fiberglass dw fiberglass <br /> Piping Manufacturer : dw fiberglass dw fiberglass smith smith <br /> Piping Diameter: smith smith 3 in. 3 in. <br /> Length of Piping Run : 3 in. 3 in. 15 ft. 15 ft. <br /> Product Stored : 110 ft. 110 ft. <br /> Method and location of REG UNLEAD REG UNLEAD <br /> sump sump <br /> piping-run isolation : <br /> Wait time between applying <br /> sump sump <br /> pressure/vacuum/water and 15 min 15 min <br /> starting test : 15 min 15 min <br /> Test Start Time : 10:39:00 11 :05 :00 <br /> Initial Reading (RI ): 10:39:00 10:39:00 5.00000 PSI 5 .00000 PSI <br /> Test End Time : 5.00000 PSI 5 .00000 PSI 11 :39:00 12:05 :00 <br /> Final Reading (RF): 11 :39:00 11 :39:00 5.00000 PSI 5.00000 PSI <br /> Test Duration : 5 .00000 PSI 5.00000 PSI I hr 1 hr <br /> Change in Reading (RF-RI ): I hr I hr 0.00000 PSI 0.00000 PSI <br /> P 0.00000 PSI 0.00000 PSI <br /> Pass/Fail Threshold or <br /> +/- 0.00000 +/- 0. 00000 <br /> Criteria: +/- 0.00000 +/- 0.00000 <br /> Test Result : Pass Pass <br /> Pass Pass <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> k <br /> WO: 2339260 <br /> c <br />
The URL can be used to link to this page
Your browser does not support the video tag.