Laserfiche WebLink
120v 10 <br /> SYMBOL LEGEND WYE/ELBOW/SAMCNA DUCT SUPPORT W/GROUND REVISIONS BY <br /> EQUIPMENT SCHEDULE LOW LOSS 'T' A OR 'B' FUSED DISC CAL BY W/G U WIRE <br /> PETTING BELOW ELECTRICAL W/GRLIUND <br /> SYMBOL ITEM AlABBREV. CONTRACTOR WIRE <br /> MARKMAKE MODEL DESC. CAPACITIES AMB ELECTRICAL ACCESSORIES RECTANGULAR DUCT SIZE <br /> 102 ITEM QTY VOLT PH NET INSIDE DIMENSIONS LINE EC❑N LOGIC <br /> CFM HEAT COOLING LINED DUCT WITH RTU- UNIT B❑ARD <br /> SEE DRAWING FOR THICKNESS <br /> IN/OUT TOT/SI=NS FLEXIBLE SUPPLY DUCT, CLASS 1 VD— 5' MAX FLEX RC RH G Y1 Y2 W1 W2 C 24 `'' XFRMR <br /> (E)RTU-3 EXISTING 5 PACKAGE 2000 N A N/A 85 EXISTING - TO REMAIN EXISTING - TO REMAIN — FLEXIBLE RETURN DUCT, CLASS 1 —� C <br /> / — VD - VOLUME DAMPER, REQUIRED NONE <br /> TON UNIT GAS 0,5 65 � FD - FIRE DAMPER FDR CS-�A.CS-1. DS-1 yR FURNISH AT ALL SUPPLY <br /> ELECTRIC VD F5D - EIRE SMOKE DAMPER 1=SD - rITUS ❑R REGISTERS IN WYE ❑R TAP. <br /> CSFD - CEIL FIRE SMOKE DAMPER CSFD EQUAL, WHITE DAMPER SHALL HAVE <br /> DM - MOTORIZED DAMPER MD DM FINISH, NO DBD, LOCKING QUADRANT ON 1' <br /> MD <br /> MAU-1 CAPTIVEAIRE MAKEUP 1596 N/A N/A N/A 1 HP 115V 10 SEE CAPTIVEAIRE SEE CAPTIVEAIRE SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER O40 DSD, SD <br /> Al-610 AIR UNIT DRAWINGS DRAWINGS <br /> DUCTWORK - GI SPIRAL PIPE ON FLOOR PLANS SHAFTS, T AIR PRODUCTS SL 20 <br /> ET <br /> L..J TURNING VANES TV PLYWOOD/SKIP RC RH G Y1 Y2 WI W2 C PH❑TELECTRTC SMOKE <br /> SHEETING ROOF DETECTOR O C\2 <br /> I 300 FIRST LETTER CEILING ATTACH TO (E) JOISTS HONEYWELL VISI❑NPR❑ 8000 WITH NC w � <br /> CS-4 LOCATION: FLOOR WITH 1-#10x1-1/2' AUTOMATED DEMAND RESPONSE <br /> 12x12 - - ' - W <br /> WALL 2x2��"=_ANG.L.I`-_...---- -- TERMINALS TO MATCH UNITS H <br /> DIFFUSER/REGISTER SCHEDULE — ® - FASTAP SCREW FUNCTION SERIES Y AND W <br /> ❑ CS-4 SECOND LETTER SUPPLY -ATTACH ' GIST TEST REMOTE <br /> W/2-1/4'0x2' LAGS o o TEST SWITCH � ce) <br /> MARK MAKE DESCRIPTIO FACE BLOW DAMPER COLOR REMARKS SERVICE: RETURN EMBED i-i/z MIN <br /> AND LED'S GRN LED p � co <br /> RED LED p <br /> EXHAUST HONEYWELL C-7232CIODA R Zi Z r� <br /> MODEL N MOUNT OPERATING WT FZ <br /> NUMBER-TYPE: DUCT STRAP----I ' HORN/STROBE O 0 ! � <br /> CS-4 TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE <br /> SEE SCHED. DOUBLE NUTTED ALL �' c❑z SENSOR, WALL RESET o Ix <br /> PER CMC AIR PRODUCTS 62 <br /> Cl 300 --- ClCCUBIC FEET PER MINUTE THREAD ROD WITH RC 0 IOVDC MOUNTED WITH 24 <br /> TDC-3-A4 SUPPLY T-BAR BRANCH BRANCH/BRANCH DUCT 12x12 - GRILLE NECK SIZE IN INCHES SQ 1- "xl- 'x ' POWER MS--RH/KA/P/AT �+ <br /> CR-1 TiTUS 3508 CEILING BLADE NA WYE WHITE INSTALL VD IN WYE 10 PROVIDE vD'S AT ALL WYES AND TAPS WASHER r❑ SUPPORT - w <br /> SUPPLYING GRILLES AND REGISTERS FOR STRAP , \� J, THERMOSTAT W W x <br /> RETURN T-BAR BRANCH BRANCH/BRANCH DUCT CE-1 AIR BALANCING PER T-24. ❑Rt---------------- <br /> THERMOSTAT, UNIT NO. 1-J'x24 GA L <br /> CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED OT — BELLY BAND DETAIL O C ' 0O Z <br /> IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID ® Q © BYPASS, NITESTAT, CLOCK — AROUND PIPE ,A. DUCT SUPPORT <br /> SYSTEMS, A O <br /> w ! � � a <br /> RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS ABBREVIATIONS W/OR WO SYMBOLS PLYWOOD/SKIP 2'x24 GA GI nucT SUPPORT STRAP <br /> SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES, CONFIRM REGISTER <br /> FINISH CHILL ❑R PAINT) WITH ARCHITECT PRIOR T❑ OR SLOTS. — WITH W/ SHEETING ROOF 2x2XJ' ANGLE WITHIN N OF REGISTER MIN FLEX <br /> _ DUCT LENGTH IS 3'2' S❑ THAT ALL <br /> N❑ SCREW HOLES EXHAUST FAN SCHEDULE WITH OUT Wd/ <br /> - -- _= <br /> JOIST/TRUSSATTACH O DUCTS <br /> IZE AND SHALL INSULATION THE VALUE DUCT <br /> AND ! <br /> W/ 'x1-1/2' MAX LENGTH IS 10' FOR ❑SHPT), 5'0" <br /> - b-77— <br /> MARK MAKE MODEL DESC. CAPACITIES ELECTRICAL ACCESSORIES AND OPERATING WTD — DOWN DN LAG BOLT I _ FAR ALL OTHERS, ALL ELB❑w <br /> I, EMBED 1' MIN ----�1 ---- -�.� - — RADIUS'S TO BE 1,5 DUCT DIAMETER, � <br /> ITEM QTY VOLT PH CONTROLS — <br /> CFM "ESP RPM SONNES GALVANIZED SHEET METAL GI DOUBLE NUTTED ALL <br /> 3/8'x2' LAG BOLT THREAD THREAD ROD WITH SQ ' <br /> EMBED 1'INTq FLEX DUCT TURNS T❑ BE 2.0 III <br /> DIAMETER <br /> KHF-1 CAPTIVEAIRE KITCHEN 1680 .75 1224 13 .75 HP 115V 10 SEE CAPTIVEAIRE 100# — ABOVE FINISHED FLOOR AFF 1-�'SUPPO " WASHER AT CEILING SYSTEM <br /> DU85HFA HOOD FAN DRAWINGS JOIST/TRUSS <br /> BELOW FINISHED FLOOR BFF 1-�'xl- 'x18 GA TO SUPPORT STRAP -- <br /> CEF-1 BROAN L100 CEILING 100 0.5 850 5.4 100 WATT 120 10 BDD, BS, SPEED 8 SEISMIC BRAC' .x N❑TE <br /> -LOCATE EVERY 40' 1- 24 GA BELLY AIR OUTLET - WT<10# <br /> CONTROLLER AND BELOW FINISHED CEILING BFC AND AT CHANGES IN '`~—BAND AROUND PIPE <br /> EXHAUST DIRECTI❑N OF PIPE - DUCT IS EXPOSED SECURE CEILING OUTLET TO S.A.T. <br /> FAN DISCONNECT — ABOVE FINSHED CEILING AFC CEILING GRID WITH (2) #10x1/2' S/M <br /> - SCREWS THRU OUTLET FLANGE TO <br /> LATERAL BRACE 80'N <br /> EW DUCTWORK — ❑C AND AT CHANGE GRID RUNNER AND AT DIAGONAL <br /> LATERAL BRAG' ❑F ➢iRECTI❑N CORNERS INSTALL (2) #12 GA. SLACK <br /> -_ <br /> BDD - BACK DRAFT DAMPER, LOW LEAK -X-.X �X DEMOLITION TO BE REMOVED TBR 40' OC AND AT m WIRES ATTACHED TO STRUCTURE <br /> ABOVE USING CLOSED LOOP EYEBOLTS, <br /> - BIRD SCREEN - DUCTWORK EXISTING (E) CD DIRECTION WIRE AND SCREWS ARE REQUIRED ❑N <br /> BS <br /> HANGE OF - --- � ALL REGISTERS, I; <br /> framing and plumbing <br /> POINT OF CONNECTION POC <br /> HVA <br /> C Notes <br /> g <br /> r <br /> the T-�24 energy 14, Insulate all ductwork per 9Y ORALE DETAIL BAR REGISTER <br /> in accordance p B SEISMIC ANCHORAGE T 2 Ii <br /> 1, Furnish and install all ductwork CUT OFF POINT COP <br /> I; ,I <br /> with the latest editions of CMC (SMACNA duct requirements found in the T-24 cpmp lianc�e <br /> construction standards), All ductwork shall be tested for leaks wlith a — FURNISHED BY OTHERS FBO DUCT DUPP❑RTS 7 DETAIL MO [� <br /> 2. All pipes, ductwork and conduit shall be installed and maximum static pressure in the duct of 1,0', maximum — <br /> seismically braced per SMACNA's Seisl Restraint leakage shall not exceed 47 of the total) supply and UP THROUGH ROOF UTR DETAIL MAu- a <br /> Guldelines, OSHPD pre--approval #RO010, return air volumes. — HIGH TEMP (500') FLEX 12 GA < CLIP ATTACH <br /> UNLESS OTHERWISE NOTED UON DRAIN - SEE PLUMBING 'II <br /> 3. All contractor furnished equipment installation and 15. All economizer, thermostat and fan .Systems shall be CONNECTOR WITH ROPE GASKET TO EC - 2#8 SM SCREWS FOR CEINTINUATIDN <br /> startup Instructions shall be kept with the piece of tested per T-24 for compliance with the T-24 C CONDENSATE, OVERFLOW C, OF CLAMP FLEX CONNECTOR EACH POST ABOVE WATER LINE <br /> equipment in weatherproof pouches until final report and the appropriate forms indicated in the T❑ DUCT W/ SS 1/2' IN PAN, 2-1/4' LAGS TO 0 <br /> inspection, After final inspection, three sets of T-24 report shall be provided and signed) by the HWS -- HEATING WATER SUPPLY, RETURN HWS,HWR WIDE HOSE CLAMPS <br /> PLYW❑OD EMBED 1' - SEAL <br /> FAN AND BASE PENETRATIONS WATER TIGHT <br /> operation, installation, maintenance and Start-up Contractor prior to project C[OSe out and the HERS GASKET - HIGH 4x BLOCKING FOR DRAIN <br /> all be given to the Owner for each reports loaded up to the appropriate CHEERS or — CHWs CHILLED WATER SUPPLY, RETURN CHWS,CHWR TEMP RTv OR 6` O CHANNEL <br /> SEALANT SET BLOCKING IN MASTIC W ! a <br /> instructions sh g J Q <br /> piece of equipment per the Ca Green Building Code, CAL-Certs hosting service, — MACHINE BOLT MB 18 GA ALL WELDED <br /> All equipment shall be installed, isolated and 16, Contractor shall label all equipment with unique WEATHERT❑P W/18'0 24 GA PLYWOOD TOP W/ !I <br /> supported per the manufacturer's written identification using plastic engraved plates with 1/2' G,LPG NATURAL GAS, LPG LINE G, LPG COLLAR WELDED TO DUCT 24 GA GI RB W - 'X2' L <br /> tall tettering indicating the equipment number and ATTACH 18 GA VENTILATED TOP C CURB W/i/4"X2" LAGS <br /> Instructions, g g q ALL THREAD ROD ATR ROOF CURB T❑ FAN BASE 24" ❑C ALL SIDES - --_-_ W- <br /> state the areas served by the equipment, See iL <br /> 4. All Fire and Fire Smoke Damper installation EA SIDE <br /> SM SCREWS 2 14 GA GI ROOF CURB <br /> instructions Shall be made available to the inspecting Specifications on dwgs, — OUTSIDE AIR OSA EA SIDE OF FAN BASE 12' MIN HT PR❑VIDE INTERNAL <br /> as tight ossi101e 18 GA VENTILATED ROOF CURB SUPPORT EVERY 54" <br /> authority for their review, 17. All flex duct wilt be stretchedg O.5 p 26 GA GI i <br /> 5. All penetrations through fire rated assemblies shall and as per manufacturers listing to avoiid all kinks FEET PER MINUTE FPM ATTACH VENTILATED C❑UNTERFLASHING <br /> be fire stopped and sealed with a material that and sagging, CURB TO 1s GA ROOF CURB ! <br /> ' rating Of the assembl 18, All SPlok2 detectors Shall be tested as required with DUCT TEMPERATURE SENSOR DTS 2 EA x1' O SCREWS FILL VOID SPACE W/ 3 <br /> meets or exceeds the T g Y 2 EA SIDE OF CURB BASE FINISH INSULATION <br /> penetrated, Materials to be used for sealing shall an approved smoke system per the City of — FLEXIBLE DUCT CONNECTOR FC 26 GA GI FINISH ROOFING - ROLL (Y <br /> General[ Contractor to Stockton's standards in the presence of the COUNTERFLASHING UP CURB AND ATTACH T <br /> be coordinated with the Gene — FLEX DUCT - NAILER <br /> vide one brand onsite, inspector or fire Marshall, FILL VOID SPACE w/ rrn <br /> pro RIGID INSULATION 3/8'0x3-1/2' LAG BOLT - EMBED <br /> 6. Install all pipe and duct IYISUIatIOn materials per 19. All SyStemS Shall require an air balance (report upon — STEAM PIPE 5 FINISH ROOFING - R❑LL 3' MIN, PLACE 48 ❑C <br /> T-24 requirements, All material to be installed Shall final inspection, Submit reports On NEBS or NABC UP CURB AND ATTACH TO SEE STRUCT DWGS z <br /> meet CBC flame and smoke requirements per note 11, forms an independent certified air balance showing — STEAM CONDENSATE SC NAILER FOR TRUSSES W <br /> shall conform to the system has been balanced and OSA quantities set to 3' MIN, -1/2' LAG BOLT - EMBED <br /> 7. All Work On this project — 3' MIN, PLACE 48'❑C 4x BLOCKING BY G �I <br /> followin codes that shown on drawings, MAKEUP WATER CW SEE STRUCT DWGS � <br /> 9 O ^N <br /> 20. Condensate drain lines installed in direct or indirect pQ SHUT OFF/BALL VALVE BV FqR rRusSEs <br /> 2016 CBC sunlight shall be UV resistant CPUC or PVC pipe and FRAMING <br /> MAU- CURB MOUNT 3 z LO <br /> 4x BLOCKING BY GC i � <br /> 2016 CPC shall be painted to protect from UV radiation, DUCT SMOKE DETECTOR DSD 1-HR SHEET ROCK (SR)SHA T DISCO NECT240V SYSTEM nno <br /> 016 CMC 21. Seal all joints and seams with DP-1010 duct sealer, DISCONNECT (42 FOR 480v �€ _ <br /> GREASE TIGHT,D DUCT Z U <br /> 2016 CEC SYSTEM) <br /> 2016 CALIFORNIA GREEN BUILDING CODE. T-24 MECH ANIS PLUMBING MANDATORY FEATURES AIRGAP TO INSIDE SR OL ZQ O M Z <br /> LINE OPENING WITH <br /> 5/8" TYPE 'X' SHEET Z B 0 <br /> ROCK8, All wye branches connected to a diffuser, grille ar 15. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM( EFFICIENCY EXHAUST <br /> WHERE HOOD l Z U W Y <br /> register shall have a manual VOLUme damper installed PER SECTION 110,2 - SEE SCHEDULES ON M--O, EXHAUST IR DUCT ELECTRICAL PANEL ❑R UNIT <br /> D EQUIPMENT CERTIFIED PER SECTION GOES THRU KITCHEN 3M FIRE BARRIER DISC❑NNECT I C)z O COO <br /> OBD's shall onl be used when <br /> 16. HVAC CONTROLS AN ROOF <br /> branch, ❑ 61'SC DUCT WRAP DEDICATED CLEAR 0 <br /> in the wye Y _ �p I— <br /> SII (— <br /> wye branches will be installed over inaccessible 120,2 FOR THERMOSTATS AND DDC CONTROLS SEE <br /> ceiling areas or in the slab Of the building. Dampers DETAILS ❑N M0. UNOBSTRUCTED WORKING SPACE U} <br /> the duct 17, SERVICE WATER HEATING SHALL COMPLY WITH SECTION IN FRONT OF PANEL, U W <br /> shall be fabricated of the same gauge as h �FL❑❑R/RABO 7❑ STRUCTURAL ! _ <br /> with 1' standoff, locking quadrant, and handle, 110.3 KHF THRU ROOF 8 MEMBER ABOVE PER NPOSSI16 & <br /> 18, USE ❑F PILOT LIGHTS ON HVAC, GAS C❑❑KI1NG POOL AND DETAIL MD 384-4. VERIFY ALL POSSIBLE O O O <br /> Fasten red ribbon to handle to mark location, CONFLICTS WITH OTHER TRADES <br /> All as pipe to he schedule 40 with screwed fittings. SPA HEATERS PROHIBITED PER SECTION 1105 PRIOR TO ROUGHING IN THE 11 SIO <br /> 9. 9 P P <br /> All air conditioning/refrigeration condensate drain 19 LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE <br /> Lines shalt be schedule 40 PVC run to the an <br /> TEMP AT llO�F OR LESS PER SECTION 110,3 - SEE PANEL BOARD ❑R DISCONNECT, <br /> approved receptor. Set pipe on redwood blocks with PLUMBING SCHEDULE <br /> 24 ga GI Cover unless otherwise shown differently 2O VENTILATION REQUIREMENTS PER 120,Lb,c&d M-1 AIR AIR BALANCE REF-BASE <br /> On drawings, BALANCE GASKET - 1/4" NEOPRENE ELECTRICAL PANEL/DISCONNECT 4 <br /> 10. Provide smoke detectors in the supply air duct on 21. NATURAL VENTILATION PER 1201,bA N/A _ TABLE STAMP <br /> t when the aggregate cfm exceeds 2000 cfm 22, CONTROLS SHALL MEET REQUIREMENTS PER 1.22, SEE M-0 20 GA CURB W/3/4" M� <br /> PLYWOOD NAILER Q�D�E w'ON'9 <br /> all unitsTAG AIRFLOW 10' MIN HT <br /> of all equipment serving a roam or more than one AND NOTES, ATTACH TO WOOD JOISTS USING �, { <br /> room and the room has no direct exits to the 23, SHUT DOWN AND BACKDRAFT DAMPERS PER 122,f See RTU-3 625 CLOSED CEEILLINING SCREWS, MINIMUM <br /> SELF TAPPING <br /> exterior. Duct smoke detectors she installed schedulN/A MAU1 1596 LAG SCREWS - 1-EACH sfnE U)es on M-0 ATTACH REF-TO CURB W/316 xl' CRG) <br /> hall <br /> after the supply fan before any branch takeoffs, 24, ISOLATION AREA DEVICES PER 122,8 - DIAMETER TO BE 3/16• <br /> 26 GA GI <br /> 5, PIPE INSULATI❑N PER 120,3, SEE NOTES, TABLE 120.3-A COUNTERFLASHING I N0. C044590 <br /> When more than one unit serves a TI space and the 2 g <br /> aggregate cfm of the units serving the TI space 26, REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE TOTAL OUTSIDE AIR 22.21 FILL VOID SPACE W/ EXP.3 31-20 <br /> exceeds 2000 c-m, all HVAC equipment shalt have duct M--0, NOTES AND SPECIFICATIONS KHF-1 1680 RIGID INSULATION <br /> OF CA <br /> Lectors, Al duct smoke detectors shall be 27. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END FINISH R❑❑FING - RCiLL <br /> �TgTF l.1F0�\ <br /> smoke de <br /> wired to shut down all units when a single unit OF PROJECT PER SECTION 120.5, 120,7 AND 12fl,8 - SEE (E)CEF- 100 NAI EURB AND ATTACH T❑ <br /> R <br /> atarms. When fire detection or alarm systems are T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE CEF-1 100 THESE PLANS ARE PRELIMINARY <br /> provided for the bullding, all smoke detectors SUBMITTED AT THE END OF THE PROJECT FOR EACH CANT STRIP BY ROOFER 12 GA GI CEILING HANGER WIRE <br /> ) - W/ FOUR TIGHT TURNS WITHIN <br /> includin those installed for fire smoke dampers HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND 1/4'0x2-1/2' LAG BOLT EMBED ���� 6' TOP AND BOTTOM AND NOT FOR CONSTRUCTION <br /> g TOTAL EXHAUST AIR 1880 2' MIN, PLACE 48'❑c —_ = UNLESS THERE IS A WET SIGNED <br /> shall be supervised by such systems per 608,1 Cl PLUMBING PIECE OF EQUIPMENT, SEE ARCH DWGS 2'x24 GA GI nuc? SUPPORT <br /> Such connections steal[ be shown on the deferred 28. STRAP WITHIN 2' OF REGISTER, SIGNATURE UPON STAMP <br /> AIR BALANCE (OSA-EA) 341 <br /> FOR STRUCTURE 48' ❑C FIELD - ALL ELBOW <br /> fire alarm Submittal, 4x BLOCKING BY GC RADIUS'S TO REGISTERS TO BE <br /> SEE ARCD DWGS FOR TURNS IN,5X DUCT FDIELD TO BEL2XD DUCT <br /> 11. Such connections shall be shown on deferred fire HANGERS <br /> SEAL AIRTIGHT DUCT DIAMETER DRAWN <br /> all submittal, SHEET METAL DUCT <br /> PC <br /> 12, All exposed ductwork shall be GI pipe and fittings, W/Y2'2.0 PCF DENSITY MAX DUCT SIZE W/ INSULATION <br /> Line all rectangular duct with insulation with the SOUND LINER IS 20'ALUMA FLEX (3.5#/FT) <br /> R-value listed in T-24 for the location of the duct CHECKED <br /> GD <br /> DATE <br /> (attic, conditioned or outside) Alt duct materials <br /> from insulation to mastics including but not limited R❑❑F EXHAUST FAN CURB 9 FLEX DUCT HANGER j <br /> to sheet metal, insulation, liners, plastics, rubber DETAIL M� DETAIL 10/1 E <br /> cements, latex, etc. shall be made of materials with <br /> JOB# 2019-106 SCALE <br /> AS NOTED <br /> a Flame spread <=25 and smoke <=50. JW Na. <br /> 13. It is the responsibility of the Mechanical Contractor <br /> �ON AL <br /> to coordinate the installation of his work including �SF <br /> equipment <br /> substitutions with the other trades G GDMD ENGINEERING, INC <br /> G, 19152 <br /> including but no limited to electrical, fire sprinkler, o�`� G �2� Mechanical and Safety Engineers SHEET <br /> 212 W Pine St, Ste 4 <br /> Lodi, Ca 95242 <br /> RE�. 6-30-20 Ph 209-367-0899A '4 M U <br /> 17 �otiAtA\0 0z Fax 209-367-0898 <br /> oP C � E-mail:gdmdengrinc@sbcglobal.net 2 OF 2 SHEETS <br />