120v 10
<br /> SYMBOL LEGEND WYE/ELBOW/SAMCNA DUCT SUPPORT W/GROUND REVISIONS BY
<br /> EQUIPMENT SCHEDULE LOW LOSS 'T' A OR 'B' FUSED DISC CAL BY W/G U WIRE
<br /> PETTING BELOW ELECTRICAL W/GRLIUND
<br /> SYMBOL ITEM AlABBREV. CONTRACTOR WIRE
<br /> MARKMAKE MODEL DESC. CAPACITIES AMB ELECTRICAL ACCESSORIES RECTANGULAR DUCT SIZE
<br /> 102 ITEM QTY VOLT PH NET INSIDE DIMENSIONS LINE EC❑N LOGIC
<br /> CFM HEAT COOLING LINED DUCT WITH RTU- UNIT B❑ARD
<br /> SEE DRAWING FOR THICKNESS
<br /> IN/OUT TOT/SI=NS FLEXIBLE SUPPLY DUCT, CLASS 1 VD— 5' MAX FLEX RC RH G Y1 Y2 W1 W2 C 24 `'' XFRMR
<br /> (E)RTU-3 EXISTING 5 PACKAGE 2000 N A N/A 85 EXISTING - TO REMAIN EXISTING - TO REMAIN — FLEXIBLE RETURN DUCT, CLASS 1 —� C
<br /> / — VD - VOLUME DAMPER, REQUIRED NONE
<br /> TON UNIT GAS 0,5 65 � FD - FIRE DAMPER FDR CS-�A.CS-1. DS-1 yR FURNISH AT ALL SUPPLY
<br /> ELECTRIC VD F5D - EIRE SMOKE DAMPER 1=SD - rITUS ❑R REGISTERS IN WYE ❑R TAP.
<br /> CSFD - CEIL FIRE SMOKE DAMPER CSFD EQUAL, WHITE DAMPER SHALL HAVE
<br /> DM - MOTORIZED DAMPER MD DM FINISH, NO DBD, LOCKING QUADRANT ON 1'
<br /> MD
<br /> MAU-1 CAPTIVEAIRE MAKEUP 1596 N/A N/A N/A 1 HP 115V 10 SEE CAPTIVEAIRE SEE CAPTIVEAIRE SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER O40 DSD, SD
<br /> Al-610 AIR UNIT DRAWINGS DRAWINGS
<br /> DUCTWORK - GI SPIRAL PIPE ON FLOOR PLANS SHAFTS, T AIR PRODUCTS SL 20
<br /> ET
<br /> L..J TURNING VANES TV PLYWOOD/SKIP RC RH G Y1 Y2 WI W2 C PH❑TELECTRTC SMOKE
<br /> SHEETING ROOF DETECTOR O C\2
<br /> I 300 FIRST LETTER CEILING ATTACH TO (E) JOISTS HONEYWELL VISI❑NPR❑ 8000 WITH NC w �
<br /> CS-4 LOCATION: FLOOR WITH 1-#10x1-1/2' AUTOMATED DEMAND RESPONSE
<br /> 12x12 - - ' - W
<br /> WALL 2x2��"=_ANG.L.I`-_...---- -- TERMINALS TO MATCH UNITS H
<br /> DIFFUSER/REGISTER SCHEDULE — ® - FASTAP SCREW FUNCTION SERIES Y AND W
<br /> ❑ CS-4 SECOND LETTER SUPPLY -ATTACH ' GIST TEST REMOTE
<br /> W/2-1/4'0x2' LAGS o o TEST SWITCH � ce)
<br /> MARK MAKE DESCRIPTIO FACE BLOW DAMPER COLOR REMARKS SERVICE: RETURN EMBED i-i/z MIN
<br /> AND LED'S GRN LED p � co
<br /> RED LED p
<br /> EXHAUST HONEYWELL C-7232CIODA R Zi Z r�
<br /> MODEL N MOUNT OPERATING WT FZ
<br /> NUMBER-TYPE: DUCT STRAP----I ' HORN/STROBE O 0 ! �
<br /> CS-4 TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE
<br /> SEE SCHED. DOUBLE NUTTED ALL �' c❑z SENSOR, WALL RESET o Ix
<br /> PER CMC AIR PRODUCTS 62
<br /> Cl 300 --- ClCCUBIC FEET PER MINUTE THREAD ROD WITH RC 0 IOVDC MOUNTED WITH 24
<br /> TDC-3-A4 SUPPLY T-BAR BRANCH BRANCH/BRANCH DUCT 12x12 - GRILLE NECK SIZE IN INCHES SQ 1- "xl- 'x ' POWER MS--RH/KA/P/AT �+
<br /> CR-1 TiTUS 3508 CEILING BLADE NA WYE WHITE INSTALL VD IN WYE 10 PROVIDE vD'S AT ALL WYES AND TAPS WASHER r❑ SUPPORT - w
<br /> SUPPLYING GRILLES AND REGISTERS FOR STRAP , \� J, THERMOSTAT W W x
<br /> RETURN T-BAR BRANCH BRANCH/BRANCH DUCT CE-1 AIR BALANCING PER T-24. ❑Rt----------------
<br /> THERMOSTAT, UNIT NO. 1-J'x24 GA L
<br /> CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIED OT — BELLY BAND DETAIL O C ' 0O Z
<br /> IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID ® Q © BYPASS, NITESTAT, CLOCK — AROUND PIPE ,A. DUCT SUPPORT
<br /> SYSTEMS, A O
<br /> w ! � � a
<br /> RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS ABBREVIATIONS W/OR WO SYMBOLS PLYWOOD/SKIP 2'x24 GA GI nucT SUPPORT STRAP
<br /> SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES, CONFIRM REGISTER
<br /> FINISH CHILL ❑R PAINT) WITH ARCHITECT PRIOR T❑ OR SLOTS. — WITH W/ SHEETING ROOF 2x2XJ' ANGLE WITHIN N OF REGISTER MIN FLEX
<br /> _ DUCT LENGTH IS 3'2' S❑ THAT ALL
<br /> N❑ SCREW HOLES EXHAUST FAN SCHEDULE WITH OUT Wd/
<br /> - -- _=
<br /> JOIST/TRUSSATTACH O DUCTS
<br /> IZE AND SHALL INSULATION THE VALUE DUCT
<br /> AND !
<br /> W/ 'x1-1/2' MAX LENGTH IS 10' FOR ❑SHPT), 5'0"
<br /> - b-77—
<br /> MARK MAKE MODEL DESC. CAPACITIES ELECTRICAL ACCESSORIES AND OPERATING WTD — DOWN DN LAG BOLT I _ FAR ALL OTHERS, ALL ELB❑w
<br /> I, EMBED 1' MIN ----�1 ---- -�.� - — RADIUS'S TO BE 1,5 DUCT DIAMETER, �
<br /> ITEM QTY VOLT PH CONTROLS —
<br /> CFM "ESP RPM SONNES GALVANIZED SHEET METAL GI DOUBLE NUTTED ALL
<br /> 3/8'x2' LAG BOLT THREAD THREAD ROD WITH SQ '
<br /> EMBED 1'INTq FLEX DUCT TURNS T❑ BE 2.0 III
<br /> DIAMETER
<br /> KHF-1 CAPTIVEAIRE KITCHEN 1680 .75 1224 13 .75 HP 115V 10 SEE CAPTIVEAIRE 100# — ABOVE FINISHED FLOOR AFF 1-�'SUPPO " WASHER AT CEILING SYSTEM
<br /> DU85HFA HOOD FAN DRAWINGS JOIST/TRUSS
<br /> BELOW FINISHED FLOOR BFF 1-�'xl- 'x18 GA TO SUPPORT STRAP --
<br /> CEF-1 BROAN L100 CEILING 100 0.5 850 5.4 100 WATT 120 10 BDD, BS, SPEED 8 SEISMIC BRAC' .x N❑TE
<br /> -LOCATE EVERY 40' 1- 24 GA BELLY AIR OUTLET - WT<10#
<br /> CONTROLLER AND BELOW FINISHED CEILING BFC AND AT CHANGES IN '`~—BAND AROUND PIPE
<br /> EXHAUST DIRECTI❑N OF PIPE - DUCT IS EXPOSED SECURE CEILING OUTLET TO S.A.T.
<br /> FAN DISCONNECT — ABOVE FINSHED CEILING AFC CEILING GRID WITH (2) #10x1/2' S/M
<br /> - SCREWS THRU OUTLET FLANGE TO
<br /> LATERAL BRACE 80'N
<br /> EW DUCTWORK — ❑C AND AT CHANGE GRID RUNNER AND AT DIAGONAL
<br /> LATERAL BRAG' ❑F ➢iRECTI❑N CORNERS INSTALL (2) #12 GA. SLACK
<br /> -_
<br /> BDD - BACK DRAFT DAMPER, LOW LEAK -X-.X �X DEMOLITION TO BE REMOVED TBR 40' OC AND AT m WIRES ATTACHED TO STRUCTURE
<br /> ABOVE USING CLOSED LOOP EYEBOLTS,
<br /> - BIRD SCREEN - DUCTWORK EXISTING (E) CD DIRECTION WIRE AND SCREWS ARE REQUIRED ❑N
<br /> BS
<br /> HANGE OF - --- � ALL REGISTERS, I;
<br /> framing and plumbing
<br /> POINT OF CONNECTION POC
<br /> HVA
<br /> C Notes
<br /> g
<br /> r
<br /> the T-�24 energy 14, Insulate all ductwork per 9Y ORALE DETAIL BAR REGISTER
<br /> in accordance p B SEISMIC ANCHORAGE T 2 Ii
<br /> 1, Furnish and install all ductwork CUT OFF POINT COP
<br /> I; ,I
<br /> with the latest editions of CMC (SMACNA duct requirements found in the T-24 cpmp lianc�e
<br /> construction standards), All ductwork shall be tested for leaks wlith a — FURNISHED BY OTHERS FBO DUCT DUPP❑RTS 7 DETAIL MO [�
<br /> 2. All pipes, ductwork and conduit shall be installed and maximum static pressure in the duct of 1,0', maximum —
<br /> seismically braced per SMACNA's Seisl Restraint leakage shall not exceed 47 of the total) supply and UP THROUGH ROOF UTR DETAIL MAu- a
<br /> Guldelines, OSHPD pre--approval #RO010, return air volumes. — HIGH TEMP (500') FLEX 12 GA < CLIP ATTACH
<br /> UNLESS OTHERWISE NOTED UON DRAIN - SEE PLUMBING 'II
<br /> 3. All contractor furnished equipment installation and 15. All economizer, thermostat and fan .Systems shall be CONNECTOR WITH ROPE GASKET TO EC - 2#8 SM SCREWS FOR CEINTINUATIDN
<br /> startup Instructions shall be kept with the piece of tested per T-24 for compliance with the T-24 C CONDENSATE, OVERFLOW C, OF CLAMP FLEX CONNECTOR EACH POST ABOVE WATER LINE
<br /> equipment in weatherproof pouches until final report and the appropriate forms indicated in the T❑ DUCT W/ SS 1/2' IN PAN, 2-1/4' LAGS TO 0
<br /> inspection, After final inspection, three sets of T-24 report shall be provided and signed) by the HWS -- HEATING WATER SUPPLY, RETURN HWS,HWR WIDE HOSE CLAMPS
<br /> PLYW❑OD EMBED 1' - SEAL
<br /> FAN AND BASE PENETRATIONS WATER TIGHT
<br /> operation, installation, maintenance and Start-up Contractor prior to project C[OSe out and the HERS GASKET - HIGH 4x BLOCKING FOR DRAIN
<br /> all be given to the Owner for each reports loaded up to the appropriate CHEERS or — CHWs CHILLED WATER SUPPLY, RETURN CHWS,CHWR TEMP RTv OR 6` O CHANNEL
<br /> SEALANT SET BLOCKING IN MASTIC W ! a
<br /> instructions sh g J Q
<br /> piece of equipment per the Ca Green Building Code, CAL-Certs hosting service, — MACHINE BOLT MB 18 GA ALL WELDED
<br /> All equipment shall be installed, isolated and 16, Contractor shall label all equipment with unique WEATHERT❑P W/18'0 24 GA PLYWOOD TOP W/ !I
<br /> supported per the manufacturer's written identification using plastic engraved plates with 1/2' G,LPG NATURAL GAS, LPG LINE G, LPG COLLAR WELDED TO DUCT 24 GA GI RB W - 'X2' L
<br /> tall tettering indicating the equipment number and ATTACH 18 GA VENTILATED TOP C CURB W/i/4"X2" LAGS
<br /> Instructions, g g q ALL THREAD ROD ATR ROOF CURB T❑ FAN BASE 24" ❑C ALL SIDES - --_-_ W-
<br /> state the areas served by the equipment, See iL
<br /> 4. All Fire and Fire Smoke Damper installation EA SIDE
<br /> SM SCREWS 2 14 GA GI ROOF CURB
<br /> instructions Shall be made available to the inspecting Specifications on dwgs, — OUTSIDE AIR OSA EA SIDE OF FAN BASE 12' MIN HT PR❑VIDE INTERNAL
<br /> as tight ossi101e 18 GA VENTILATED ROOF CURB SUPPORT EVERY 54"
<br /> authority for their review, 17. All flex duct wilt be stretchedg O.5 p 26 GA GI i
<br /> 5. All penetrations through fire rated assemblies shall and as per manufacturers listing to avoiid all kinks FEET PER MINUTE FPM ATTACH VENTILATED C❑UNTERFLASHING
<br /> be fire stopped and sealed with a material that and sagging, CURB TO 1s GA ROOF CURB !
<br /> ' rating Of the assembl 18, All SPlok2 detectors Shall be tested as required with DUCT TEMPERATURE SENSOR DTS 2 EA x1' O SCREWS FILL VOID SPACE W/ 3
<br /> meets or exceeds the T g Y 2 EA SIDE OF CURB BASE FINISH INSULATION
<br /> penetrated, Materials to be used for sealing shall an approved smoke system per the City of — FLEXIBLE DUCT CONNECTOR FC 26 GA GI FINISH ROOFING - ROLL (Y
<br /> General[ Contractor to Stockton's standards in the presence of the COUNTERFLASHING UP CURB AND ATTACH T
<br /> be coordinated with the Gene — FLEX DUCT - NAILER
<br /> vide one brand onsite, inspector or fire Marshall, FILL VOID SPACE w/ rrn
<br /> pro RIGID INSULATION 3/8'0x3-1/2' LAG BOLT - EMBED
<br /> 6. Install all pipe and duct IYISUIatIOn materials per 19. All SyStemS Shall require an air balance (report upon — STEAM PIPE 5 FINISH ROOFING - R❑LL 3' MIN, PLACE 48 ❑C
<br /> T-24 requirements, All material to be installed Shall final inspection, Submit reports On NEBS or NABC UP CURB AND ATTACH TO SEE STRUCT DWGS z
<br /> meet CBC flame and smoke requirements per note 11, forms an independent certified air balance showing — STEAM CONDENSATE SC NAILER FOR TRUSSES W
<br /> shall conform to the system has been balanced and OSA quantities set to 3' MIN, -1/2' LAG BOLT - EMBED
<br /> 7. All Work On this project — 3' MIN, PLACE 48'❑C 4x BLOCKING BY G �I
<br /> followin codes that shown on drawings, MAKEUP WATER CW SEE STRUCT DWGS �
<br /> 9 O ^N
<br /> 20. Condensate drain lines installed in direct or indirect pQ SHUT OFF/BALL VALVE BV FqR rRusSEs
<br /> 2016 CBC sunlight shall be UV resistant CPUC or PVC pipe and FRAMING
<br /> MAU- CURB MOUNT 3 z LO
<br /> 4x BLOCKING BY GC i �
<br /> 2016 CPC shall be painted to protect from UV radiation, DUCT SMOKE DETECTOR DSD 1-HR SHEET ROCK (SR)SHA T DISCO NECT240V SYSTEM nno
<br /> 016 CMC 21. Seal all joints and seams with DP-1010 duct sealer, DISCONNECT (42 FOR 480v �€ _
<br /> GREASE TIGHT,D DUCT Z U
<br /> 2016 CEC SYSTEM)
<br /> 2016 CALIFORNIA GREEN BUILDING CODE. T-24 MECH ANIS PLUMBING MANDATORY FEATURES AIRGAP TO INSIDE SR OL ZQ O M Z
<br /> LINE OPENING WITH
<br /> 5/8" TYPE 'X' SHEET Z B 0
<br /> ROCK8, All wye branches connected to a diffuser, grille ar 15. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM( EFFICIENCY EXHAUST
<br /> WHERE HOOD l Z U W Y
<br /> register shall have a manual VOLUme damper installed PER SECTION 110,2 - SEE SCHEDULES ON M--O, EXHAUST IR DUCT ELECTRICAL PANEL ❑R UNIT
<br /> D EQUIPMENT CERTIFIED PER SECTION GOES THRU KITCHEN 3M FIRE BARRIER DISC❑NNECT I C)z O COO
<br /> OBD's shall onl be used when
<br /> 16. HVAC CONTROLS AN ROOF
<br /> branch, ❑ 61'SC DUCT WRAP DEDICATED CLEAR 0
<br /> in the wye Y _ �p I—
<br /> SII (—
<br /> wye branches will be installed over inaccessible 120,2 FOR THERMOSTATS AND DDC CONTROLS SEE
<br /> ceiling areas or in the slab Of the building. Dampers DETAILS ❑N M0. UNOBSTRUCTED WORKING SPACE U}
<br /> the duct 17, SERVICE WATER HEATING SHALL COMPLY WITH SECTION IN FRONT OF PANEL, U W
<br /> shall be fabricated of the same gauge as h �FL❑❑R/RABO 7❑ STRUCTURAL ! _
<br /> with 1' standoff, locking quadrant, and handle, 110.3 KHF THRU ROOF 8 MEMBER ABOVE PER NPOSSI16 &
<br /> 18, USE ❑F PILOT LIGHTS ON HVAC, GAS C❑❑KI1NG POOL AND DETAIL MD 384-4. VERIFY ALL POSSIBLE O O O
<br /> Fasten red ribbon to handle to mark location, CONFLICTS WITH OTHER TRADES
<br /> All as pipe to he schedule 40 with screwed fittings. SPA HEATERS PROHIBITED PER SECTION 1105 PRIOR TO ROUGHING IN THE 11 SIO
<br /> 9. 9 P P
<br /> All air conditioning/refrigeration condensate drain 19 LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE
<br /> Lines shalt be schedule 40 PVC run to the an
<br /> TEMP AT llO�F OR LESS PER SECTION 110,3 - SEE PANEL BOARD ❑R DISCONNECT,
<br /> approved receptor. Set pipe on redwood blocks with PLUMBING SCHEDULE
<br /> 24 ga GI Cover unless otherwise shown differently 2O VENTILATION REQUIREMENTS PER 120,Lb,c&d M-1 AIR AIR BALANCE REF-BASE
<br /> On drawings, BALANCE GASKET - 1/4" NEOPRENE ELECTRICAL PANEL/DISCONNECT 4
<br /> 10. Provide smoke detectors in the supply air duct on 21. NATURAL VENTILATION PER 1201,bA N/A _ TABLE STAMP
<br /> t when the aggregate cfm exceeds 2000 cfm 22, CONTROLS SHALL MEET REQUIREMENTS PER 1.22, SEE M-0 20 GA CURB W/3/4" M�
<br /> PLYWOOD NAILER Q�D�E w'ON'9
<br /> all unitsTAG AIRFLOW 10' MIN HT
<br /> of all equipment serving a roam or more than one AND NOTES, ATTACH TO WOOD JOISTS USING �, {
<br /> room and the room has no direct exits to the 23, SHUT DOWN AND BACKDRAFT DAMPERS PER 122,f See RTU-3 625 CLOSED CEEILLINING SCREWS, MINIMUM
<br /> SELF TAPPING
<br /> exterior. Duct smoke detectors she installed schedulN/A MAU1 1596 LAG SCREWS - 1-EACH sfnE U)es on M-0 ATTACH REF-TO CURB W/316 xl' CRG)
<br /> hall
<br /> after the supply fan before any branch takeoffs, 24, ISOLATION AREA DEVICES PER 122,8 - DIAMETER TO BE 3/16•
<br /> 26 GA GI
<br /> 5, PIPE INSULATI❑N PER 120,3, SEE NOTES, TABLE 120.3-A COUNTERFLASHING I N0. C044590
<br /> When more than one unit serves a TI space and the 2 g
<br /> aggregate cfm of the units serving the TI space 26, REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE TOTAL OUTSIDE AIR 22.21 FILL VOID SPACE W/ EXP.3 31-20
<br /> exceeds 2000 c-m, all HVAC equipment shalt have duct M--0, NOTES AND SPECIFICATIONS KHF-1 1680 RIGID INSULATION
<br /> OF CA
<br /> Lectors, Al duct smoke detectors shall be 27. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END FINISH R❑❑FING - RCiLL
<br /> �TgTF l.1F0�\
<br /> smoke de
<br /> wired to shut down all units when a single unit OF PROJECT PER SECTION 120.5, 120,7 AND 12fl,8 - SEE (E)CEF- 100 NAI EURB AND ATTACH T❑
<br /> R
<br /> atarms. When fire detection or alarm systems are T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE CEF-1 100 THESE PLANS ARE PRELIMINARY
<br /> provided for the bullding, all smoke detectors SUBMITTED AT THE END OF THE PROJECT FOR EACH CANT STRIP BY ROOFER 12 GA GI CEILING HANGER WIRE
<br /> ) - W/ FOUR TIGHT TURNS WITHIN
<br /> includin those installed for fire smoke dampers HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND 1/4'0x2-1/2' LAG BOLT EMBED ���� 6' TOP AND BOTTOM AND NOT FOR CONSTRUCTION
<br /> g TOTAL EXHAUST AIR 1880 2' MIN, PLACE 48'❑c —_ = UNLESS THERE IS A WET SIGNED
<br /> shall be supervised by such systems per 608,1 Cl PLUMBING PIECE OF EQUIPMENT, SEE ARCH DWGS 2'x24 GA GI nuc? SUPPORT
<br /> Such connections steal[ be shown on the deferred 28. STRAP WITHIN 2' OF REGISTER, SIGNATURE UPON STAMP
<br /> AIR BALANCE (OSA-EA) 341
<br /> FOR STRUCTURE 48' ❑C FIELD - ALL ELBOW
<br /> fire alarm Submittal, 4x BLOCKING BY GC RADIUS'S TO REGISTERS TO BE
<br /> SEE ARCD DWGS FOR TURNS IN,5X DUCT FDIELD TO BEL2XD DUCT
<br /> 11. Such connections shall be shown on deferred fire HANGERS
<br /> SEAL AIRTIGHT DUCT DIAMETER DRAWN
<br /> all submittal, SHEET METAL DUCT
<br /> PC
<br /> 12, All exposed ductwork shall be GI pipe and fittings, W/Y2'2.0 PCF DENSITY MAX DUCT SIZE W/ INSULATION
<br /> Line all rectangular duct with insulation with the SOUND LINER IS 20'ALUMA FLEX (3.5#/FT)
<br /> R-value listed in T-24 for the location of the duct CHECKED
<br /> GD
<br /> DATE
<br /> (attic, conditioned or outside) Alt duct materials
<br /> from insulation to mastics including but not limited R❑❑F EXHAUST FAN CURB 9 FLEX DUCT HANGER j
<br /> to sheet metal, insulation, liners, plastics, rubber DETAIL M� DETAIL 10/1 E
<br /> cements, latex, etc. shall be made of materials with
<br /> JOB# 2019-106 SCALE
<br /> AS NOTED
<br /> a Flame spread <=25 and smoke <=50. JW Na.
<br /> 13. It is the responsibility of the Mechanical Contractor
<br /> �ON AL
<br /> to coordinate the installation of his work including �SF
<br /> equipment
<br /> substitutions with the other trades G GDMD ENGINEERING, INC
<br /> G, 19152
<br /> including but no limited to electrical, fire sprinkler, o�`� G �2� Mechanical and Safety Engineers SHEET
<br /> 212 W Pine St, Ste 4
<br /> Lodi, Ca 95242
<br /> RE�. 6-30-20 Ph 209-367-0899A '4 M U
<br /> 17 �otiAtA\0 0z Fax 209-367-0898
<br /> oP C � E-mail:gdmdengrinc@sbcglobal.net 2 OF 2 SHEETS
<br />
|