� CV
<br /> N (j)
<br /> � U
<br /> MAXIMUM AVAILABLE FAULT CURRENT AND VOLTAGE DROP CALCULATIONS FEEDER SCHEDULE POWER RISER DIAGRAM NOTES: , LLQ
<br /> COPPER CONDUCTORS ALUMINUM CONDUCTORS -
<br /> AMPACITY 1� 3m MIN CONDUIT SIZE 1m 1m MIN CONDUIT SIZE 1. MAIN SWITCHBOARD'MSB'BASIS-OF-DESIGN IS SIEMENS'SENTROV AND DIMENSIONS SHOWN INDICATE
<br /> 20 (3j#12+(1}#12 GND (a}#12+(1 y#12 GND D MAXIMUM ALLOWED. EC SHALL SUBMIT CUT-SHEETS INDICATING ALL GEAR DIMENSIONS PRIOR TO ORDERING
<br /> UTILITY TRANSFORMER:
<br /> 30 [3]#10+{1}#10 GND (4)#16+(1)#10 GND 314" ELECTRICAL EQUIPMENT. PROVIDE THIS EQUIPMENT OR APPROVED EQUAL.
<br /> ON r 1 KVA RATING: 750 40 (3}#8+(1}#10 GND {4}#8+(1y#10 GND 314" 2. EC SHALL PROVIDE PROPOSED LAYOUT OF ALL ELECTRICAL ROOMS WITH A TO-SCALE DRAWING OR SKETCH TO tJ
<br /> M VOLTAGE(E): 20850 (3)#6+(1)#111 GN❑ 4}#6+(1)#10 GND 1" VERIFY THAT ALL ELECTRICAL EQUIPMENT WILL FIT WITHIN ELECTRICAL ROOM/SPACE AS PART OF ELECTRICAL
<br /> USE COPPER CONDUCTORS SUBMITTALS.
<br /> Z: 3.50% 60 (3]#4+(1)410 GND {4}#4+(1)#10 GND 1-114" 3. EC SHALL BE RESPONSIBLE FOR MAINTAINING WORKING CLEARANCES IN ACCORDANCE W/CEC 110.26. Q
<br /> � Ifla = �� = 750000 = 70 {3}#4+{7}#8 GND (4y#4+(1y#B GND 1.114"
<br /> ( ) (E)(1.73) 359.84 2084 A 80 (3)#2+(1)#8 GND (4)#2+(1)#8 GND 1-1/4" 4. MAIN SWITCHBOARD'MSB'SHALL BE CONSTRUCTED IN ACCORDANCE W/UL891 AS WELL AS UTILITY AND THE
<br /> FOLLOWING EUSERC REQUIREMENTS:CT COMPARTMENT(P659), U.G. PULL SECTION (708),LINE TERMINATIONS RED INC ARCHITECTS
<br /> 90 {3}#2+{1}#8 GND (4y#2+{1 y#8 GND 1-114" 1217 J STREET,MODESTO,CA 95354
<br /> 2084.259671 100 (3)91+(1)#6 GND (4 #1+ 1 #6 GND 1-1/2^ (706.1,706.2), METER PLATES(628),SMM METERING(642), SUPPORT(659.2). 209.522.6900
<br /> y { y (3)#110+(1)#6 GND (4)#110+(1)#6 GND 2" 5. MAIN SWITCHBOARD'MSB'SHALL BE PROVIDED WITH INTERNAL SURGE PROTECTION DEVICE(SPD)AND POWER
<br /> I(sca) - %Z 3.50% - 59550 A 125 {3}#1+(1}#6 GND (4y#1+(1 y#6 GND 1-112" (3y#210+[1'�#4 OND {4}#216+(1 y#4 GND 2"
<br /> QUALITY METERING. SIEMENS EQUIPMENT AS BASIS-OF-DESIGN:METERING IS TYPICAL OF SEIMENS'PAC3200',
<br /> 150 (3)#110+(1)#6 GND (4)#1ro+(1)#6 GND 2" (3)#310+(1)#4 GND (4)#310+(1)#4 GND 2" SPD IS TYPICAL OF SIEMENS'TPST SERIES-200KA RATED W/INTEGRAL DISCONNECT. PROVIDE THIS OR SEAL:
<br /> } MAIN SWITCH BOARD-MSB: 175 (3)#210+(1)#6 GND (4)#210+(1)#6 GND 2" (3)#410+(1)#4 GND (4)#410+(1)#4 GND 2-112" APPROVED EQUAL.
<br /> J 200 (3)#310+(1)#6 GND (4)#3/0+(1)#6 GND 2" (3)#250+(11#4 GND (4)#250+(1)N GND 2-112"
<br /> � L(ft) = 35 225 (3)#414+ 1}#4 GND (4)#aro+ 1]#4 GND 2.112" (3)#300+ 1]#2 GND (4}#3oa+ 1}#2 GND 2-112° 6. PROVIDE LABEL SERVICE DISCONNECTING MEANS PER CEC 230.70(6).
<br /> { ( ( 7. ELECTRICAL GEAR MAY BE SERIES-RATED. OVER-CURRENT DEVICE ENCLOSURES SHALL BE IDENTIFIED AS
<br /> I(A) = 59550 250 [3]#250+(1)44 GND (4)4250+(1 y#4 GND 2-112" (3)#350+(1)42 GND (4)4350+(1)#2 GND 31' SERIES-RATED AND LABELED IN ACCORDANCE WITH CEC 110.22. THE OVER-CURRENT DEVICES SHALL BE AIC
<br /> C = 22185 (From IEEE Std 241) 300 (3)#350+(1)#4 GND (4)#350+(1)#4 GND 3" (3)#500+(1)#2 GND (4)#500+(1)#2 GND 3-112" RATED PER MANUFACTURER'S LABELING OF THE ELECTRICAL EQUIPMENT. eR S/0
<br /> n = 6 400 21(3)#310+(1 y#3 GND] 2[(4)#10+(1)#3 GND] 2[2'] 2[(3)#250+(2)#1 GND] 2[(4)#250+(2y#1 GND] 2[2-112°] 8. PER CEC 240.86(C)SERIES-RATED MAY ONLY BE USED ON PANEL BOARDS CONTAINING MOTOR LOADS WHERE �OPN J coq F
<br /> 2
<br /> (1.73)(L)(1) _ 3605769.231 600 2[(3)#350+(1)#1 GND] 2[{4)#350+(1]41 GND] 2[3'] 21{3}#500+(1)#210 GND] 2[(4)#500+(1)#2/0 GND] 2[3-1r2"] THE SUM OF THE MOTOR FULL LOAD CURRENTS DOES NOT EXCEED 1%OF THE INTERRUPTING RATING OF THE �� y
<br /> f [C](n)(E) 27686880 = 0.1302339 A +ISO':PROVIDE ADDITIONAL ISOLATED GROUNDING CONDUCTOR LOWER-RATED OVERCURRENT PROTECTION (I.E. 10,000A RATED=100A MAX OF MOTOR LOADS). m
<br /> 9. COORDINATE ALL PRIMARY AND SECONDARY TRENCHING REQUIREMENTS. TYPICALLY PRIMARY TRENCHES Cr No. E 21841
<br /> ARE 48"AND SECONDARY ARE 30"(MIN). TRENCHES TYPICALLY TRANSISTION TO 72"AT SWITCHES, PULLBOXES, EXP:03/31/2019
<br /> M = 1 = 1 = 0.8847726 A SEDICATED AND TRANSFORMERS TO ALLOW FOR 36"LONG-RADIUS SWEEP ELBOWS.
<br /> 1+f 1.130233859
<br /> F
<br /> OUTSIDE AIR 10. NOT USED. �TgTF T
<br /> 'm SYSTEM 11.ALL UNDERGROUND SERVICE CONDUITS SHALL BE SEALED PER CEC 230.8. of cA��F
<br /> o I(sca) _ (I)(M) = 52688 A 'DOAS-1' 12. DEPTH BELOW GRADE FOR ALL EXTERIOR CONDUITS SHALL BE IN ACCORDANCE W/CEC TABLE 300.5.
<br /> 'm 13. FOR ELEVATOR SHUNT TRIP DISCONNECT PROVIDE BUSSMANN"POWER MODULE"SWITCH OR EQUAL. PROVIDE 04/15/2019
<br /> R181029-1651 M W/N.O.CONTACTS, FIRE ALARM VOLTAGE MONITORING RELAY, KEY-TO-TEST SWITCH AND PILOT LIGHT.
<br /> 14.ALL PROTECTION DEVICES SHALL BE MARKED TO INDICATE LOAD SERVED.
<br /> 15. EQUIPMENT GROUNDING CONDUCTOR SHALL NOT BE USED AS ELECTRODE CONDUCTOR. CONSULTANT:
<br /> PANEL PHASE POWER WIRE SIZE FEEDER CONDUCTORS PANEL VOLTAGE DROP FED FROM ARC FAULT SOLAR PV 16. PANEL FEEDERS SHALL BE SIZED TO PREVENT VOLTAGE DROP EXCEEING 2%.
<br /> FACTOR LENGTH PER PHASE LOAD SYSTEM 17. TO REDUCE ARC-FLACH HAZARD IN ACCORDANCE W/CEC 240.87, MAIN CIRCUIT BREAKER SHALL BE EQUIPPED
<br /> (BY OTHERS) W/ELECTRONIC TRIP UNIT(L,S,I)AND EQUIPPED W/"DYNAMIC ARC-FLASH SENTRY(DAS)"(BASIS-OF-DESIGN:
<br /> MAIN SWITCHGEAR'MSB' 3 0.9 #500 35 6 1946 0.89 0.43% 52688 SIEMENS'WL'-SERIES INSULATED CASE CIRCUIT BREAKER W/ETU776 TRIP UNIT AND REMOTE KEYED SWITCH&
<br /> STAUS INDICATOR LIGHT.)
<br /> PANEL'1A' 3 0.9 #3/0 125 2 332 3.86 1.86% MSB 16820 18. ELECTRICAL EQUIPMENT, SUCH AS BUT NOT LIMITED TO SWITCHBOARDS, SWITCHGEAR, PANELBOARDS,AND
<br /> ROOF ROOF METER SOCKETS SHALL BE FIELD OR FACTORY MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL
<br /> PANEL'1 B' 3 0.9 #3/0 125 2 301 3.59 1.72% MSB 16820 ELECTRIC ARC FLASH HAZARDS. MARKINGS SHALL MEET CEC 110.21 AND 110.22(8). 17
<br /> 19. CIRCUIT BREAKER FOR SOLAR PHOTOVOLTAIC SYSTEM SHALL BE LOCATED AT THE OPPOSITE END OF THE
<br /> PANEL'1 H' 3 0.9 #3/0 125 2 93 1.72 0.83% MSB 16820DISTRIBUTION BUSSING FROM THE INCOMING UTILITY CONNECTION. ENGINEERING SYSTEM SOLUTIONS
<br /> PANEL'3A' PANEL'3B' PANEL'3C' PANEL'3D' PANEL'3H' STRUCTURAL•MEP•BUILDING COMMISSIONIN
<br /> PANEL'1 K' 3 0.9 #1/0 185 1 59 3.21 1.54% MSB 5225 208/120 208/120V 208/120V 208/120V 208/120V 20. PER CEC 110.24,SERVICE EQUIPMENT IS TO BE MARKED WITH THE MAXIMUM CALCULATED AVAILABLE FAULT BUILDING RELATIONSHIPS
<br /> 30,4W 30,4W 30,4W 30,4W 30,4W CURRENT AND DATE WHEN CALCULATIONS WERE PERFORMED. EXCEEDING EXPECTATIONS
<br /> PANEL'1L' 3 0.9 #1/0 125 1 62 2.54 1.22% MSB 7382 150A 150A 150A 150A 175A www.es2eng.com
<br /> 4943 NORTH 29TH EAST,STE A
<br /> PANEL'1P' 3 0.9 #1/0 275 1 113 7.53 3.62% MSB 3633 AIC= AIC= AIC= AIC= AIC= IDAHO FALLS,IDAHO 83401
<br /> 22,000 22,000 10,000 10,000 22,000 PHONE:(208)552-9874
<br /> PANEL'1R1' 3 0.9 #3/0 125 2 85 1.66 0.80% MSB 16820 A E PLINS,DR-S�DESIC-ARE THE E-1 SISI PROPERTY OF--
<br /> JOB NUMBER: 17.1019
<br /> 175A 3�
<br /> PANEL'2C' 3 0.9 #250 145 1 239 4.68 2.25% MSB 10852 `WARN I N G ...."LEO "° "=°'1SE"6"E""`"TEMSOLT'°"s
<br /> ARC FLASH HAZARD.
<br /> PANEL'2D' 3 0.9 #250 145 1 213 4.27 2.05% MSB 10852 APPROPRIATE PPE REQUIRED.
<br /> PAN EL'1PL' 3 0.9 #1/0 150 1 98 4.79 2.30% 1R1 5019 FED FROM THIRD FLOOR PANEL 1H THIRD FLOOR FAILURE TO COMPLY CAN RESULT IN DEATH OR INJURY.
<br /> PANEL'1R2' 3 0.9 #1 10 1 43 1.77 0.85% 1R1 14113 REFER TO NFPA 70 E.
<br /> PANEL'17 3 0.9 #1 85 1 28 2.26 1.09% 1R1 6394
<br /> SEE NOTE 18
<br /> PANEL'2N 3 0.9 #250 25 1 242 4.53 2.18% 1A 13876 PANEL'2A' PANEL'213' PANEL'2C' PANEL'2D' PANEL'2L' PANEL'2R' Fakfield
<br /> PANEL'213' 3 0.9 #250 25 1 241 4.25 2.04% 1B 13876 208/120 208/120V 208/120V 208/120V 208/120V 208/120
<br /> 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W INN & SUITES
<br /> PANEL'2R' 3 0.9 #4 30 1 43 2.28 1.10% 1R1 7999 250A 250A 250A 250A 100A 100A BY MARRIOTT
<br /> PANEL'2L' 3 0.9 #10 25 1 12 3.11 1.50% 1L 2878 AIC= AIC= AIC= AIC= AIC= AIC=
<br /> 22,000 22,000 22,000 22,000 10,000 10,000
<br /> PANEL'3N 3 0.9 #1/0 20 1 121 5.04 2.42% 2A 11025 250A 3�
<br /> PANEL'3B' 3 0.9 #1/0 20 1 120 4.76 2.29% 2B 11025 100A 3�
<br /> PANEL'3C' 3 0.9 #1/0 20 1 120 5.19 2.50% 2C 9027
<br /> PANEL'3D' 3 0.9 #1/0 20 1 106 4.72 2.27% 2D 9027
<br /> PANEL'3H' 3 0.9 #2/0 40 1 151 2.74 1.32% 1H 11064 FED FROM FED FROM FED FROM FED FROM
<br /> PANEL1A PANEL1B PANEL1L PANEL1R1
<br /> Q
<br /> SECOND FLOOR 2 TOTAL-PANEL FEEDERS FROM 2ND FL SECOND FLOOR Z
<br /> AIC FAULT CALCULATIONS ARE BASED UPON THE ABOVE UTILITY TRANSFORMERS KVA RATING,Z IMPEDANCE,PROPOSED TRANSFORMER LOCATION AND PANEL LOCATIONS 0
<br /> LL
<br /> INDICATED,AND COPPER CONDUCTORS FOR SECONDARY AND PANEL FEEDERS.EC TO VERIFY ACTUAL TRANSFORMER KVA SIZE,TRANSFORMER Z IMPEDANCE,CONDUCTOR
<br /> MATERIAL AND TRANSFORMER LOCATION W/UTILITY COMPANY PRIOR TO ORDERING ELECTRICAL GEAR W/AIC RATINGS. ELEVATOR U
<br /> M
<br /> BUSSMANN'POWER MODULE'
<br /> FUSIBLE SHUNT TRIP SWITCH -
<br /> (SEE NOTE 13)
<br /> 'MSB' 2"C W/(4)#2/0 CU+(1)#6 CU GND PANEL'2A' PANEL'213' PANEL'3H' PANEL'2L' PANEL'2R' 3 TOTAL PANEL FEEDERS
<br /> 2000A,208/120V FEEDER FEEDER FEEDER FEEDER FEEDER FROM PANEL 1R1
<br /> 30,4W NEMA 3R (
<br /> AIC=65,000 I I IXX
<br /> (SEE NOTES 1-8, 17) 6 TOTAL
<br /> 177-
<br /> 400A 3�
<br /> COORDINATE W/UTILITY COMPANY PANEL FEEDERS DISTRIBUTION DISTRIBUTION FROM FL 150A 3� 100A 3�
<br /> FOR MAX ALLOWABLE METER HEIGHT 1ST D
<br /> (6'-3"AFF TYP)-HOUSE KEEPING SEE NOTE 19 ISECTION I SECTION 125A 3�
<br /> PAD MAY NEED ADJUSTED ACCORDINGLY (UNIT SPACE) I I I
<br /> 100A-3� +ISO
<br /> so.00^ ® ® ® ® ® ® 7.5 ® ® ® 7.5 ® ® ® T (SEE NOTE 5)
<br /> i
<br /> 80.00° _
<br /> 0 13 SPO aUNIT PANEL'1A' PANEL'1B' PANEL'1H' PANEL'1K' PANEL'1L' PANEL'1P' PANEL'1R1' PANEL'1PL' PANEL'1RZ PANEL'1T'
<br /> OCKET ® o.a 208/120V 208/120V 208/120V 208/120V 208/120V 208/120 208/120V 208/120 208/120V 208/120V
<br /> 70'00 25.0 B 15.0 UNIT SPACE 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W 30,4W
<br /> PAD MOUNTED CT COMPARTMENT 10° UNIT 400A 400A 400A 150A 150A 150A 400A 125A 100A 100A
<br /> 60.00" (PROVISION) SPACE 5.0 SPACE IL'
<br /> TRANSFORMER BY 6.2s
<br /> •5.0 SEE TABLE 0 ® ® AIC= AIC= AIC= AIC= AIC= AIC= AIC= AIC= AIC= AIC= O
<br /> UTILITY COMPANY 3.75 M ® 5.0
<br /> so.00° 200 0 5.0 ® ® 5.0 ® ® 22,000 22,000 22,000 10,000 10,000 10,000 22,000 10,000 22,000 10,000 0n
<br /> 10.0 5.0 ® ® 5.0 ® ® Z
<br /> U STUB PRIMARY AND SECONDARY 40.00" 0 s.o ® ® 5.0 ® ® PROVIDE CHASE NIPPLE(S)FOR REQ'D CKTS,
<br /> CONDUITS THROUGH BLOCKOUT MAIN 5.0 ® ® 5.0 ® ® SEE LIGHTING CONTROL SCHEDULE
<br /> m WITHIN±1"OF TOP OF CONCRETE PAD
<br /> 30.00° 20.0 e ® 5.0 ® ® 5.0 ® ® LIGHTING p
<br /> 5.0 ® ® 5.0 ® ® CONTROL z
<br /> 20.00° ® ® ® ® 4"CONCRETE HOUSEKEEPING PAD PANEL'LCP' 0
<br /> 46 PROVIDE CONCRETE TRANSFORMER PAD SUSE 5.0 5.o BY EC. FASTEN GEAR TO PAD U
<br /> 1 30.0 7.5 7.5
<br /> PER UTILITY COMPANY REQUIREMENTS ,� 75.0 75.0 PER MANUFACTURER'S
<br /> 10.00"
<br /> RECOMMENDATIONS
<br /> 25.0 ® ® ® 110.0 ® ® ® 7.5 ® ® ® 7.5 ® ® ® U)
<br /> FINISHED GRADE °0° FIRST FLOOR z
<br /> SECTION# 1 SECTION# 2 SECTION# 3 SECTION# 4 0 J
<br /> COORDINATE LOCATION OF Supply=300 supply=3000 Supply=3000 Supply=3000
<br /> Section=3000 Section=2500 Section=2500
<br /> TRANSFORMER PAD BLOCKOUT W/ Neutral=3000 Neutral=2500 Neutral=2500
<br /> UTILITY-PROVIDED GROUND ROD aa.00 38.00 3e.00 3e.00
<br /> GRC RISERS GROUND PER CEC 250 W/
<br /> COORDINATE ALL PRIMARY-SIDE WORK W/GRC (1)#3/0 CU TO METAL U.G.WATER PIPE
<br /> .53 REQUIRED W/UTILITY COMPANY LONG RADIUS (1)#3/0 CU TO BUILDING STEEL REVISIONS:
<br /> ELBOWS _ (1)#3/0 CU TO CONCRETE ENCASED ELECTRODE
<br /> (1)#1 CU TO BOND METAL GAS PIPING SYSTEM 1 BLDG DEPT 10/12/18
<br /> (SEE NOTE 9)
<br /> EC TO COORDINATE SECONDARY SECONDARY FEEDER W/
<br /> UTILITY. REFER TO LODI ELECTRIC PLAN.COORDINATE
<br /> CONDUIT,CONDUCTORS,TRENCHING,AND TERMINATIONS W/
<br /> UTILITY. SEE NOTES 9 AND 11 FOR MORE INFORMATION.
<br /> u
<br /> m
<br /> :Z
<br /> COORDINATE W/UTILITY COMPANY FOR COORDINATE W/ELECTRICAL INSPECTOR FOR
<br /> INSPECTION AND SIGN OFF OF ALL PRIMARY INSPECTION AND SIGN OFF OF ALL SECONDARY
<br /> ELECTRICAL WORK ELECTRICAL WORK
<br /> m BA PROJECT# 161010
<br /> PLN PROJECT# 17077
<br /> 1 POWER RISER DIAGRAM MARRIOTT# 4476
<br /> t�•� NO SCALE
<br /> U PERMIT# -
<br /> APN# 058-66-012
<br /> U
<br /> N
<br /> r..
<br /> t
<br /> Q
<br /> DATE: 4/15/19
<br /> DRAWN: DW
<br /> CHECKED: JC
<br /> SHEET TITLE:
<br /> ELECTRICAL DETAILS
<br /> 'C
<br /> d
<br /> SHEET NO.:
<br /> c
<br /> 3
<br /> c�
<br /> L
<br /> r
<br /> E501
<br />
|