My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
1600 - Food Program
>
PR0162841
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 5:32:21 PM
Creation date
8/25/2020 3:12:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0162841
PE
1615
FACILITY_ID
FA0008109
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRE0NS BY <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> Domestic Water Heating System Domestic Water Heating System <br /> NRCC-PLB-E(Created 11/19) CALIFORNIA ENERGY COMMISSION NRCC-PLB-E(Created 11/19) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-PLB-E CERTIFICATE OF COMPLIANCE NRCC-PLB-E <br /> This document is used to demonstrate compliance for nonresidential occupancies with requirements in 110.1 110.3 120.3 and 140.5 and with requirements in 141.0 for Project Name: WEST LN.CHEVRON lReport Page: Page 2 of 6 <br /> additions and alterations,for domestic water heating scopes using the prescriptive path. For high-rise residential and hotel/motel occupancies,compliance is demonstrated with Project Address: 4747 WEST LN.,STOCKTON,CA 95210 Date Prepared: 2020-03-05 <br /> requirements in 110.1 110.3 120.3 150.0 and§150.108,and with requirements in 150.2 for additions and alterations. <br /> Project Name: WEST LN.CHEVRON IReport Page: Page 1 of 6 D. EXCEPTIONAL CONDITIONS <br /> Project Address: 4747 WEST LN.,STOCKTON,CA 95210 Date Prepared: 2020-03-05 This table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. �OFESS/ <br /> ON <br /> c�0 v,. AL q! <br /> A.GENERAL INFORMATION No exceptional conditions apply to this project. <br /> 01 Project Location(city) STOCKTONCO CD 02 Climate Zone 12 �J J M36488 ly m <br /> 03 loccupancy Types Within Project(select all that apply): E.ADDITIONAL REMARKS � Exp.09/30/21 <br /> ❑✓ Nonresidential High-Rise Residential Hotel/Motel This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. <br /> State Building ❑ Healthcare Facility ❑ Other(Write In): <br /> F F CAS- <br /> B. PROJECT SCOPE <br /> Table Instructions:Include any domestic water heating systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive F. DOMESTIC HOT WATER EQUIPMENT <br /> paths outlined in 140.5 §150.1(c)8,and 141.0 a or§141.0(b)2N for additions or alterations. Solar water heating systems should be documented on the NRCC-SRA Table Instructions:Complete the following table to demonstrate compliance with mandatory equipment requirements in 110.1 and 110.3. For high-rise residential and hotel/ <br /> compliance document. Combined hydronic water heating systems should be documented on the NRCC-MCH compliance document. o o 0 <br /> motel occupancies, compliance with prescriptive requirements in§150.1(c)8 must also be demonstrated and with 150.2 for addition and alteration scopes. W 0 <br /> 01 02 03 Equipment Schedule: Individual Systems N L - Z ti <br /> My project consists of(check all that apply): System Type'-2 System Components 01 02 03 04 05 06oQ <br /> New System (DHW system being installed for the first -a IJ 3 <br /> ❑✓ time in newly constructed building) Central System(serving nonresidential spaces) ZEquipment z Distribution z Controls Minimum J <br /> Max GPM/First Rated Uniform Z <br /> Name or Required Z 0 <br /> New System (DHW system being installed for the first , Equipment Type Volume(gal) Hour Rating Energy Factor = 0 <br /> ❑✓ time in newly constructed building) Individual System(serving nonresidential spaces) ❑✓ Equipment ❑✓ Distribution ❑✓ Controls Item Tag (FHR) (UEF) Uniform Energy <br /> Factor(UEF)' m k <br /> J <br /> POU-1 Electric Instantaneous(<_12kW) <_2 0<_GPM<1.7 0.98 0.91 p, <br /> System Alteration (equipment,distribution or controls) Equipment Distribution Controls <br /> WZ � <br /> 'FOOTNOTE:Compliant equipment maybe found in the Modernized Appliance Efficiency Database System(MAEDBS)on the Energy Commission website:https:// W 3 <br /> 'FOOTNOTE:Point of use water heaters,or other non-central systems used to serve nonresidential spaces,are considered individual systems. 3 <br /> cacertappliances.energy.ca.gov/Pages/Search/Ad vanced5earch.aspx �s <br /> 'Dwelling units refers to hotel/motel guest rooms and units in a high-rise residential occupancy. <br /> C. COMPLIANCE RESULTS Equipment Schedule:Central Systems <br /> Table Instructions:Table C will indicate if the project data input into the compliance document is compliant with water heating requirements. This table is not editable by the 07 08 09 10 11 12 13 14 15 <br /> user. If this table says"DOES NOT COMPLY"or"COMPLIES with Exceptional Conditions"refer to Table D.,or the table indicated as not compliant for guidance. Rated Input Minimum <br /> Name or Designed Maximum z <br /> Equipment Type Volume(gal) Capacity Rated Efficiency Efficiency Efficiency Unit , Q <br /> 01 02 03 04 Item Tag Standby Loss, Standby Loss < <br /> (Btu/h) Required <br /> Domestic Hot Water Equipment Distribution Systems Controls <br /> Compliance Results Z <br /> (See Table F) (See Table G) (See Table H) WH-1 Electric Storage Water Heater 50 34,121.42 0.98 0.8 0.8 0 <br /> Yes Yes Yes COMPLIES <br /> WH-2 Electric Storage Water Heater 20 13,648.568 0.98 1.6 1.6 <br /> Table Continued <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards November 2019 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards November 2019 <br /> W <br /> Q <br /> z � <br /> D_ <br /> STATE OF CALIFORNIA STATE OF CALIFORNIA <br /> CQ <br /> Domestic Water Heating System Domestic Water Heating System (f <br /> NRCC-PLB-E(Created 11/19) CALIFORNIA ENERGY COMMISSION NRCC-PLB-E(Created 11/19) CALIFORNIA ENERGY COMMISSION <br /> CERTIFICATE OF COMPLIANCE NRCC-PLB-E CERTIFICATE OF COMPLIANCE NRCC-PLB-E <br /> Project Name: WEST LN.CHEVRON lReport Page: Page 3 of 6 Project Name: WEST LN.CHEVRON Report Page: Page 4 of 6 <br /> Project Address: 4747 WEST LN.,STOCKTON,CA 95210 Date Prepared: 2020-03-05 Project Address: 4747 WEST LN.,STOCKTON,CA 95210 Date Prepared: 2020-03-05 O <br /> Table Continued <br /> TABLE 120.3-A PIPE INSULATION THICKNESS <br /> 'FOOTNOTE:For gas water heaters/boilers,standby loss is in BTUH. For electric storage water heaters,standby loss is in%/hr. <br /> Nominal Pipe Diameter(in) (� <br /> I <br /> Water Heating Equipment All Occupancies Fluid Temperature Range(°F) Conductivity Range Insulation Mean Rating <1 1 to< 1.5 1.5 to<4 <br /> Not (Btu-in per hour per ft'per°F) Temp(°F) <br /> Yes No Applicable Requirement <br /> Minimum Insulation Required <br /> 18 (' (9, Unfired storage tank insulation shall have Internal+External>_R-16 OR External>_R-12. Label required per§110.3(c)3 <br /> 19 C (� (0- New state buildings 60%of energy for service water heating from site solar energy or recovered energy per§110.3(c)5 105-140 0.22-0.28 100 1.0 in or R-7.7 1.5 in or R-12.51.5 in or R-11 <br /> 20 is 1 r I Ilsolation valves for instantaneous water heater with input rating>6.8 kBTUH or 2 kW has been specified per§110.3(ck6 <br /> G. DOMESTIC HOT WATER DISTRIBUTION SYSTEM H. DOMESTIC HOT WATER SYSTEM CONTROLS LJz <br /> Table Instructions:Complete the following table to demonstrate compliance for nonresidential occupancies with distribution requirements in 120.3 and 140.5. For high-rise Table Instructions:Complete the following table to demonstrate compliance with controls requirements in 110.3 for all occupancies. For high-rise residential and hotel/motel <br /> 01.residential and hotel/motel occupancies,compliance is demonstrated with requirements in 110.3 c 120.3 150.0 150 .. occupancies,compliance is demonstrated with requirements in§150.1(c)8 <br /> Recirculation Loops in Central Systems Serving Dwelling Units or Nonresidential Spaces Yes No Applicable Requirement <br /> Yes No Not RequirementConstruction documents require manufacturer certification that service water-heating systems are equipped with automatic Lu C� <br /> Applicable 01 A C (' LU O O <br /> temperature controls capable of adjusting temperature settings per 110.3 a O LL - <br /> 01 (' (' (0' Air release valve or vertical pump installation per§110.3(c)4A Systems with capacity>167,000 BTUH equipped with outlet temperature controls per§110.3(c)1 unless covered by California CV <br /> 02 C C i9- Check valve or similar located between recirculation pump and water heating equipment to prevent backflow per§110.3(046 02 Plumbing Code Section 613.0. w = <br /> U U 6� <br /> 03 ( (` (� Hose bibb installed between pump and equipment and isolation valve between hose bibb and equipment per§110.3(c)4C 03 Controls for circulating pumps or electrical heat trace systems are capable of automatically turning off the system per§110.3(c)2 z ( 1 Q <br /> 04 C C (0- Isolation valves on both sides of the pump per§110.3(c)4D unless system serves healthcare facility. Lu v W U <br /> 05 C C Cold water and recirculation loo piping shall not be connected to the hot water storage tank drain ort per§110.3 c 4E For recirculation systems serving multiple dwelling units,design includes automatic pump controls per§150.1(c)8Bii,or 150.2 for z � <br /> loop g g p p U 04 C C (0- > z � Z <br /> additions or alterations <br /> 06 (0- C ( Check valve installed on cold water supply between hot water system and next closest tee on cold water supply per§1193(c)4F z LU <br /> For recirculation systems serving individual dwelling units,design includes manual on/off controls as specified in Reference O = C) <br /> 07 ( (, For central systems serving multiple dwelling units,design includes two or more recirculation loops serving separate dwelling 05 ( Appendix RA 4.4.9 per§150.1(c)8. 0 L� � � � <br /> units per§150.1(08Bii unless building has<_8 dwelling units. �: O U <br /> For replacement single heat pump water heaters serving individual dwelling units in climate zones 1-15,design includes w <br /> Mandatory Pipe Insulation All Occupancies 06 (� ( (� z � O <br /> communication interface that meets demand responsive control requirements of§110.12(a)per§150.2(b)1Hiii. Q <br /> For systems serving nonresidential spaces, pipe insulation for the following applications is specified to comply with Table 120.3-A(see below) per 120.3: <br /> 12 ✓❑ Recirculating system piping, including supply and return piping of the water heater U ) <br /> The first 8 ft of hot and cold outlet piping for a nonrecirculating storage system W <br /> Pipes that are externally heated <br /> 13 Insulation shall be protected from damage,including that due to sunlight, moisture,equipment maintenance,and wind. Insulation exposed to weather <br /> shall be installed with a cover suitable for outdoor service per 120.3 b and150.0 ' 3 <br /> TABLE 120.3-A PIPE INSULATION THICKNESS <br /> Table Continued <br /> DATE <br /> CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards November 2019 CA Building Energy Efficiency Standards-2019 Nonresidential Compliance:http://www.energy.ca.gov/title24/2019standards November 2019 03/05/2020 <br /> SCALE <br /> A5 5HOWN <br /> DRAWN <br /> GEA <br /> JOB <br /> SHEET <br /> fDO <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.