My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:30:08 PM
Creation date
8/25/2020 4:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kasey Foley I \f <br /> San Joaquin County C <br /> Environmental Health Department <br /> Certified Unified Program Agency ( CUPA) OCT 0 6 2017 <br /> -2- October 5 , 2017 <br /> ENVIRONMENTAL HEALTH <br /> nE PARTMENT <br /> 4 . Three ( 3 ) sets of tank installation plans prepared by Barghausen Consulting Engineers , Inc . , <br /> dated September 5 , 2017 , <br /> 5 . Three ( 3 ) copies of the work and equipment schedules (see the detailed scopes of work <br /> included on the tank and electrical plans , Pages G . 0 . 2 . 1 and G . 0 . 2 . 2 ) <br /> 6 . Three ( 3 ) sets of fueling system cut sheets <br /> 7 . Three ( 3 ) sets of tank buoyancy calculations for the enclosed tank and electrical plan set <br /> ( Pages M . 5 . 3 . 03 and M . 5 . 3 . 05 ) , dated September 1 , 2017 <br /> 8 . One ( 1 ) check issued by Barghausen Consulting Engineers , Inc . in the amount of $2 , 941 , to <br /> cover expedited Plan Review fees of $ 1 , 824 ($228 per hour x 8 hours ) , the $641 facility fee , <br /> tank fees of $456 ($ 152 per tank x 3 tanks ) , and a surcharge fee of $20] made payable to the <br /> San Joaquin County Environmental Health Department <br /> It is our understanding that the items referenced above comprise a complete application package for <br /> replacement of the UST system equipment at the razed and rebuilt ARCO ampm fueling facility <br /> referenced above . As stated above , an application for removal and closure of the UST system at the <br /> previous facility will be submitted to San Joaquin County EHD under separate cover. <br /> Should you need additional information or require additional items for your review , feel free to contact me <br /> at ainigues@barghausen . com or at (425 ) 251 -6222 . Thank you <br /> Respectfully , <br /> i <br /> M . Alexia Inigues <br /> Project Planner <br /> MAI / BLS/hd <br /> 12796c . 013 . docx <br /> enc : As Noted <br /> cc: David Allen , BP West Coast Products LLC <br /> Jay S . Grubb , Barghausen Consulting Engineers , Inc . <br /> Daniel B . Goalwin , Barghausen Consulting Engineers , Inc . <br /> Chris S . Ferko , Barghausen Consulting Engineers , Inc . <br /> Chris Jensen , Barghausen Consulting Engineers , Inc . <br /> Joshua Harlan , Barghausen Consulting Engineers , Inc . <br /> Dan Santos , Barghausen Consulting Engineers , Inc . <br /> Lori Hoover, Barghausen Consulting Engineers , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.