My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:30:08 PM
Creation date
8/25/2020 4:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time In: <br /> Time Out: <br /> San Joaquin County <br /> .X Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> • �... P Telephone: (209)468-3420 Fax:(209)464-0138 Web:www.sigov.org/ehd <br /> �<<FORtN <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO 07049 Date: 08/02/2019 <br /> Address: 800 E Kettleman LN , LODI 95240 <br /> Requestor: ALEXIA INIGUES, BARGHAUSEN CONSULTING ENGINEERS INC Telephone: (425)251-6222 <br /> Program Element: 2303-UST/PIPING INSTALLATION Request#: SR0078236 <br /> Inspection Type: 131 -UST INSTALLATION INSPECTION <br /> Onsite Service Technician: Latham Zubillaga ICC Service Tech/Installer Exp. Date: 01/08/2020 <br /> Manufacturer training: CSI, 06/21/21 <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the installation of new USTs <br /> -25,000 gallon (regular)Containment Solutions double-walled fiberglass tank <br /> -12,000 gallon (premium)/10,000 gallon (diesel)Containment Solutions double-walled fiberglass split tank <br /> -Verified UL labeling on all tanks. <br /> -Inspected tanks for brine leaks. No leaks observed. <br /> -Inside of tanks was inspected by the contractor on site and stated to be clean and brine-free. <br /> -Verified the use of the manufacturer installation checklist at the time of inspection. <br /> -Verified presence of deadmen and use of anchor straps. <br /> -Verified use proper pea gravel backfill. <br /> -Witnessed tank set. <br /> -Verified the application of additional corrosion protection on all metal anchor components. <br /> -Witnessed backfilling of the tank pit and compaction of pea gravel. <br /> -Witnessed primary tank test, according to manufacturer's specifications(5 psi for 30 minutes).. <br /> -Test start time for the 25,000 gallon tank was 3:18pm,with a top reading of 5.0 psi and bottom reading of 5.4psi. <br /> End reading: 5.0 psi (top), 5.3(bottom) <br /> -Test tart time for the 12,000 gallon tank was 3:19pm,with a top reading of 5.1 psi and bottom reading of 5.4 psi. <br /> End reading: 5.1 psi (top), 5.4 (bottom) <br /> -Test start time for the 10, 000 gallon tank was 3:24pm,with a top reading of 5.0 psi and bottom reading of 4.7psi. <br /> End reading: 5.0 psi (top),4.6(bottom) <br /> NOTE:Additional inspections are required. Refer to the approval letter dated July 29, 2019 for a list of inspections needed. <br /> FA0003633 SR0078236 SC131 08/02/2019 <br /> EHD 23-01 Rev.06/30/15 Page 1 of 2 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.