My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:30:08 PM
Creation date
8/25/2020 4:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> MAR 0 8 2018 <br /> Betty Ho , EHS C_NVIRONNIENTAL HEALTH <br /> Environmental Health Specialist r DEPARTMENT <br /> San Joaquin County <br /> Environmental Health Department -3- March 7 , 2018 <br /> b. In the dispenser sump crossover piping detail for FRP states a 2 " single wall vapor recovery <br /> piping exiting the under dispenser containment. Vapor recovery single wall cannot be <br /> installed. <br /> Response : The plans have been revised to reflect double-wall piping , as noted in the <br /> California Variant , <br /> 10) U5. 3. 12 — in the I: tank sump drain port detail, indicate how the brine communication will be <br /> tested. <br /> Response : The plans have been revised to install a plastic tube with a ball valve , so that the <br /> fluid can easily be drained into a cup to test continuity . <br /> 11) G. 5. 3. 23- In the C- C4ront view section and the D-D:side view section diagrams, states the 2 ' <br /> inside 3 " FRP vapor recovery line. Cannot be installed. In the D-D:side view section diagram, <br /> indicate test port depiction for vacuum communication. <br /> Response : The plans have been revised to install a vacuum tube with a ball valve for testing <br /> continuity . <br /> 12) G. 5. 3. 25- In the C- C4ront view section and the D-D:side view section diagrams, states the 2 ' <br /> inside 3 " FRP vapor recovery line. Cannot be installed. In the D-D:side view section diagram, <br /> indicate test port depiction for vacuum communication. <br /> Response : The plans have been revised to install a vacuum tube with a ball valve for testing <br /> continuity . <br /> We believe that the above responses , together with the enclosed revised plans and technical documents , <br /> address all of the comments in your in your comment letter dated February 22 , 2018 . Please review and <br /> approve the materials enclosed at your earliest convenience . Should you have questions or require further <br /> information , feel free to contact Ryan Bharucha via email at rbharucha@barghusen . com , or me at <br /> ainigues@barghausen . com , or either of us at (425 ) 251 -6222 . Thank you . <br /> Respectfully , <br /> Alexia Inigues <br /> Senior Planner <br /> MAI / RB/ hd [ 12796c . 024 . docx] <br /> enc : As Noted <br /> cc : Jay S . Grubb , Barghausen Consulting Engineers , Inc . <br /> Daniel B . Goalwin , Barghausen Consulting Engineers , Inc . <br /> Josh Harlan , Barghausen Consulting Engineers , Inc . <br /> Ryan Bharucha , Barghausen Consulting Engineers , Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.