My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
INSTALL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:30:08 PM
Creation date
8/25/2020 4:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(page 6 of s <br /> XII. UNE LEAK DETECTOR TESTING <br /> F[:]Check this box If line leak detectors(LLD)are NOT Installed.(Do not complete this section.) y N NA <br /> This section must be completed if LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rale verified: ❑X 3 GPH ❑0.1 GPH ❑0.2 GPH <br /> Was the testing apparatus property calibrated? X ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak Is detected? ❑ I ❑ 91 <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak Is detected? ❑ I ❑ 0 <br /> For electronic LLDs,does the turbine automatically shut off when a leak Is detected? X ❑ I ❑ <br /> For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? ❑X ❑ 1 ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or falls a test? ® ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑X ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? X ❑ ❑ <br /> Were all LLDs confirmed operallonal within regulatory requirements? ❑X ❑ ❑ <br /> For any answer of"N"above,describe In Section X111 how and when these Issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM 1 PRESSURE 1 HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring Is NOT used.(Do not complete this section.) <br /> This section must be completed If VPH monitoring Is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑X Vacuum ❑Pressure ❑X Hydrostatic <br /> Sensor ID Componerd(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> 1 REG Product Una ❑X Pass ❑Fall ❑X Pass <br /> ❑Fall <br /> 2 REG Vapor Una ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> 3 REG Vent Una ❑X Pass ❑Fail Q Pass ❑Fall <br /> 4 PREM Product Line ❑X Pass ❑Fail ❑X Pass ❑Fall <br /> 5 PREM Vent Una ❑X Pass ❑Fail ❑X Pass ❑Fall <br /> 6 Diesel Producttine ❑X Pass ❑Fail ❑X Pass ❑Fall <br /> 7 Diesel Vent Chase ❑X Pass ❑Fall ❑X Pass ❑Fall <br /> ❑Pass ❑Fall ❑Pass ❑Fall <br /> ❑Pass ❑Fall ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fall <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? ❑X Simulated Leak at Far Ends of the Interstitial SpaceVisual Inspection <br /> Other Describe the method in section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels in all Interstitial spaces? ❑X Yes ❑No(Describe the reason In section XV below.) <br /> For any answer of"Pall"above,describe in Section XV how and when these Issues were or will be corrected. <br /> XV. COMMENTS <br /> GPM=Galas Per tier,Y=Yes.N a No.NA=Not Applicable VPH=V ID=Iderii6mUon <br />
The URL can be used to link to this page
Your browser does not support the video tag.