My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1995 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
23709
>
4400 - Solid Waste Program
>
PR0400036
>
CORRESPONDENCE_1995 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 9:25:57 AM
Creation date
9/1/2020 10:16:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1995 - 2007
RECORD_ID
PR0400036
PE
4452
FACILITY_ID
FA0000771
FACILITY_NAME
SKS ENTERPRISES
STREET_NUMBER
23709
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240
APN
02317008
CURRENT_STATUS
01
SITE_LOCATION
23709 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> RENS fly letter <br /> Page 3 of 3 <br /> Terminator Jars and at least 5 fly bait stations on each side of the bunker. Suggest that <br /> the fly stations be tied together in pairs so that the two fly stations hang on either side of <br /> the concrete bunker like a pair of saddlebags. By replacing one or two fly bait stations a <br /> week we should be able to keep the fly population down to a manageable number. <br /> When buildings 1 — 3, & 6 are empty of birds, that we remove the material out of the <br /> bunker and compost the material. First we will need to pump the liquid material out of <br /> the bunker. Next, remove the solids from the bunker and compost. The entire area will <br /> then have to be inspected so that all organic debris in and around the bunker is <br /> removed. General fly control measures (fly bait and fly jars) will be in place during this <br /> time period. <br /> The adjacent overflow pond will need to be drained and the organic material removed <br /> and composted as well or spread over the fields in a thin layer and disced into the soil if <br /> approved by E.H.D. <br /> General comments; <br /> By addressing the manure bunker, overflow pond and making an attempt at reducing fly <br /> propagation and introducing adult fly control measures, we should be able to make a <br /> good impact at reducing fly numbers. In addition, we will need to place additional fly <br /> bait stations in and around buildings 1 — 5 and 6 as well as placing fly terminator jars <br /> adjacent to the said buildings as well as between the buildings 1 —5 and the neighbors <br /> residence. The fly bait stations and Terminator jars will need to be inspected and <br /> addressed weekly to ensure that we continue to make an impact on fly reduction. <br /> On my next visit I would like to inspect the Hone facility to see what progress has been <br /> made in implementation the above control measures. Should you have additional <br /> questions please let me know. <br /> Sincerely, <br /> Mark C. Bland, DVM, MS, ACPV <br /> CC: Rolando Calderon, SKS Production Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.