Laserfiche WebLink
IL IN S IL ff<If' SK S-,V n- IU IK1-- ® ice� <br /> September,2000 <br /> AMENDMENT TO MANURE MANAGEMENT PLAN <br /> The objective of this plan is to relocate.the existing drying pad. KRC Aggregate has <br /> informed SKS that they will soon start to excavate at the Dation of out existing <br /> dry pad:,As a result,,SKS has planned,to relocate our drying*pad. The proposed <br /> location is shown on the map that is attached: <br /> During the winter season,it is almost impossible to spread manure on the drying <br /> pad. For that reason ,SKS is proposing to build two manure ponds so that there <br /> would be sufficient capacity for the manure produced in the winter. Vie believe <br /> this would also reduce the risk of fly breeding and help control the manure odor <br /> during the summer. <br /> As stated in our original plan, $KS is planning to use unit,#8 as a composting <br /> house. Manure management is still animportant issue and is taken very seriously by <br /> SKS and its' staff. Our goal is to eliminate fly problems entirely. <br /> 11830 East French camp Road Telephone (209) 983-0642 <br /> Manteca,'Cal lfiornia 95336 Facsimile (2091983-9116, <br />