My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1995 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
23709
>
4400 - Solid Waste Program
>
PR0400036
>
CORRESPONDENCE_1995 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 9:25:57 AM
Creation date
9/1/2020 10:16:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1995 - 2007
RECORD_ID
PR0400036
PE
4452
FACILITY_ID
FA0000771
FACILITY_NAME
SKS ENTERPRISES
STREET_NUMBER
23709
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240
APN
02317008
CURRENT_STATUS
01
SITE_LOCATION
23709 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September,2000 <br /> AMENDMENT TO MANURE MANAGEMENT PLAN <br /> The objective of this plan is to relocate the existing drying pad. KRC Aggregate has <br /> informed SKS that they will soon start to excavate at the location of our existing <br /> dry pad. As a result, SKS has planned to relocate our drying pad. The proposed <br /> location is shown on the map that is attached. <br /> During the winter season,it is almost impossible to spread manure on the drying <br /> pad. For that reason, SKS is proposing to build two manure ponds so that there <br /> would be sufficient capacity for the manure produced in the winter. We believe <br /> this would also reduce the risk of fly breeding and help control the manure odor <br /> during the summer. <br /> As stated in our original plan, SKS is planning to use unit#8 as a composting <br /> house. Manure management is still an important issue and is taken very seriously by <br /> SKS and its' staff. Our goal is to eliminate fly problems entirely. <br /> Proposed#1-Dry pad located at northside of House#7. <br /> Proposed#2-Dry pad located at eastside of House#9. <br /> Proposed#3- Manure ponds locaated at southside of House#9 180' x 500'. <br /> Proposed#4- SKS is planning to use House#8 as a composting house and is <br /> Located at south of House#7 and behind House#5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.