Laserfiche WebLink
} <br /> 3. The map does not label by name or number all structures including chicken houses, office, <br /> ponds, wells, septic systems and manure holding pits. <br /> 4. No description of the prevailing wind direction at the site. <br /> 5. Does not provide the maximum number of birds the facility design allows. <br /> 6. Does not list the amount of wet manure and dry manure generated daily. <br /> 7. Does not describe the amount of manure to be composted on a daily basis. <br /> 8. Does not describe how the finished compost will be handled and who will remove it from the <br /> site. <br /> 9. Does not describe the amount of manure placed in the lagoon and how often the manure is <br /> pumped in the lagoon. <br /> 10. Does not describe the total volume of the lagoon. <br /> 11. Does not describe how much manure will be removed from Unit 6 (high-rise facility) and how it <br /> will be handled. <br /> 12. The MMP mentions the "drying pad" and a"spreading machine." Manure cannot be placed on <br /> a drying pad or distributed with a spreading machine. <br /> 13. Does not describe how the lagoon will be managed. How often will the lagoon be pumped out <br /> and where will the pumped out waste be taken? <br /> 14. Does not describe what fly control measures will be used in the chicken houses, compost house, <br /> liquid manure pits,the manure lagoon and at the facility in general. <br /> 15. Does not describe if and when a licensed pest control service will be utilized. <br /> 16. Does not describe the number of bird mortality expected each year and the storage and disposal <br /> methods used for dead animals. <br /> 17. Does not describe the type(s) of feed utilized(hay, silage, grain, food processing byproducts, <br /> etc.) and storage location(s). <br /> 18. Does not describe the type, number and capacity of refuse and garbage containers used by the <br /> facility (cans, dumpsters, etc.) and the name of the person or refuse company responsible for <br /> waste removal, frequency of removal and disposal location (transfer station, landfill,etc.) <br /> At this time the EHD cannot approve the Manure Management Plan or the Notification of Compost Site <br /> form. To completely meet the requirements of the EHD, follow the above findings and use the enclosed <br /> Manure Management Plan Guidance Document. <br /> Submit a revised MMP and Notification of Compost Site form to EHD within thirty(30) days. <br /> Direct`'questions to Garrett Backus, REHS at(209)468-2986 <br /> Garrett Backus, RENS <br /> Environmental Health Department <br /> Page 2 of 2 <br />