My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 4:17:39 PM
Creation date
9/1/2020 3:10:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Fadlities <br /> 2.Clean the spill bucket and examine it for dam- 6.5.1 General. Containment sumps are liquid- <br /> age. Make sure that it is free of cracks, loose tight structures designed to temporarily contain <br /> parts or separation of the bucket from the fill leaks or spills. In addition, containment sumps <br /> pipe. If the spill bucket is damaged notify the often serve as the leak detection monitoring loca- <br /> ownerloperator. tion for double-walled piping systems. Leakage <br /> 3.Attach the test apparatus to the test port. from the primary containment typically flows by <br /> gravity inside the secondary containment to the <br /> 4.Connect the line from the vacuum source to the sump, where it can be easily observed or detected <br /> test apparatus. by a sensor. <br /> S. If the spill bucket is found to have cracks, loose. This section describes a hydrostatic test method. <br /> pails or separation of the bucket from the rill There are vacuum test methods available for con- <br /> pipe, it is not considered to be liquid-tight. This tainment sumps. Consult the manufacturer before <br /> visually indicates a test failure. performing a vacuum test. <br /> 6.4.5 Test Procedure. NOTE: Follow the manufacturer's instructions <br /> 1.Slowly apply a vacuum of 15 inches water when testing the interstitial spaces of double- <br /> column to the spill-bucket interstitial space and walled containment sumps. <br /> close the control valve. if a 15-inch water col- <br /> umn vacuum cannot be attained,the spill bucket 6.5.2 Purpose. This section describes the prep- <br /> fails the test. See Appendix B for pressure and aration and procedures to test the integrity of con- <br /> vacuum conversions. tainment sumps to ensure that they do not leak. <br /> 2.Stan the time--measurement device and record 6.5.3 Description of Test. The containment <br /> the initial vacuum level shown on the gauge. sump is filled to the proper level with water. The. <br /> 3. After I minute,record the ending vacuum level. water level is measured at the beginning and end of <br /> the test. <br /> Upon completion of the test, release the vacuum. <br /> �..+ remove the test apparatus and restore the spill 6.5.4 Test Equipment. Test equipment shall <br /> bucket to its normal operating condition. include: <br /> 6.4.6 Pass/Fail Crfterla. If the ending vacuum • water; <br /> level is 12 inches water column or greater,the spill • measuring stick that is accurate to within 1/16 <br /> bucket passes the test. (0.063) inch and of sufficient length; <br /> If the ending vacuum level is less than 12 inches • stopwatch or other time-measurement device <br /> water column, the spill bucket fails the test. capable of measuring a 1-second increment. <br /> 6.5 Containment Sump Integrity Testing. 6.5.5 Preparation. <br /> 1.Care should be taken when conducting the test <br /> CAUTION: Gaining access to.the contain- in the rain or during freezing weather condi- <br /> ment sump requires removing the lid, tions. <br /> cover or dispenser panel that is in place to <br /> protect the equipment in the sump. These 2. Remove and properly dispose of any liquid and <br /> components can be heavy. They may debris (leaves. sediment and trash) in the con- <br /> require special handling and more than tainment sump. <br /> one person to remove them. Use caution 3. Inspect the containment sump for damage. <br /> when moving and replacing them when Examine all penetration fittings, conduits,junc- <br /> testing Is complete. During the test, put tion boxes,caps and risers(if present),and side- <br /> the covers and panels In a safe location wall seams for defects. damage or improperly <br /> where they are secure and Isolated from installed components. If there are loose com- <br /> vehlcle and customer traffic. ponents (e.g., loose penetration fitting clamps <br /> or mussing interstitial space caps), correct these <br /> items before performing the integrity test. If <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.