M PEVRP1200-12 <br /> there are items that must be repaired or replaced 6.5.6 Test Procedure. <br /> (e.g.. deteriorated penetration fitting boots). 1. Begirt the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minimum of 4 inches above the highest sump <br /> prior to proceeding with repairs. <br /> penetration or sump sidewall seam,whichever is --� <br /> 4.Test boots or secondary containment tetmina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etrating the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space mens. if the highest sump penetration or sump <br /> of double-walled piping. Without these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot he tested using of the sump, add water to within I inch of the <br /> this method. top of the sump. <br /> S.if interstitial monitoring sensors are present 2.Plate the meastuing stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test. If the level in the sump to allow for an accurate mea- <br /> sensor is removed, reposition after testing to surement to be taken. The location of the mea- <br /> appropriate position according to the manufac- suring stick must retrain the same for each water <br /> turer's instructions. level measurement. Document the initial water <br /> S.If the containment sump is found to have cracks, level measurement as measured from the bottom <br /> loose parts or separation of any joints or penetra- of the sump. Alternative measurement methods <br /> tion fittings, it is not considered to be liquid- may he used provided that the measurement to <br /> tight.This visually indicates a test failure. 1/16(0.063) inch can be made. <br /> 3.'fake all precautions to prevent the water level <br /> CAUTION: Water can damage electrical from being disturbed during the duration of the <br /> connections. Ensure that there are no test. <br /> components that can be damaged by the 4. After I hour, document the ending water level <br /> addition of water to the sump. If such measurement. <br /> components are present, take appropriate <br /> precautions when performing the test or S. Upon completion of the test: <br /> use an alternative test method. - remove all water and properly dispose of it <br /> according to Section 6.7: <br /> - reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> • return the test boots or secondary contain- <br /> ment fittings to their pre-test operating con- <br /> figurations; <br /> Juncl r- <br /> Candul <br /> ELpx <br /> Piping <br /> EWr9ru:a1 <br /> Conduil <br /> Pyaducl <br /> FIGURE 6-5. The test fluid level in the UDC must be at ming <br /> least 4 inches above the highest sump penetration or <br /> sidewall seam. <br /> FIGURE 6-6. To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> 0 pei.org <br />