Laserfiche WebLink
Page 1 of 3 <br /> 372736 <br /> 1 . SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution : <br /> Mason= Piping Run #87 Piping Run # 91 Piping Run # Diesel Piping Run # 87 Vent <br /> Piping Material : Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3 " 3 " <br /> Length of Piping Run : Aprox 200 ' Aprox 200 ' Aprox 200 ' <br /> Product Stored : 87 Gas 91 Gas Diesel Vent 87 <br /> Method and location of <br /> i in -run isolation : <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time : 2 : OOpm 2 : OOpm 2 : OOpm 2 : OOpm <br /> Initial Reading (RI) : 5 psi 5 psi 5 psi 5 psi <br /> Test End Time : 3 : 00pm 3 : OOpm 3 : OOpm 3 : OOpm <br /> Final Reading (RF) : 5 psi 5 psi 5 psi 5 psi <br /> Test Duration : 1 hour 1 hour 1 hour <br /> Change in Reading (RF-RI) : 0 0 0 0 <br /> Pass/Fail Threshold or 0 , 00 0 . 00 0. 00 0 . 00 <br /> Criteria: <br /> Test Result: ' ® Pass ❑ Fail ® . Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments — (inchide information on repairs made prior to testing, and r•econimended folloln-zip for failed tests) <br /> I <br /> i <br /> i <br />