My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br /> 2 . SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : See attached testing procedures Equipment Resolution : <br /> Piping Run #91 Vent Piping Run # Diesel Piping Run # Vapor piping Run # <br /> Vent Return <br /> EM <br /> M MEMO=l <br /> Piping Material : Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3 " 3 " 3 " <br /> Length of Piping Run : <br /> Product Stored : 91 Vent Diesel Vent Vapor Return <br /> Method and location of Test boot in Sump Test boot in Sump Test boot in Sump <br /> i in -run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time : 2 : OOpm 2 : 00pm 2 : 00pm <br /> Initial Reading (RI) : 5 psi 5 psi 5 psi <br /> Test End Time : 3 : OOpin 3 : OOpm 3 : OOpm <br /> Final Reading (RF) : 5 psi 5 psi 5 psi <br /> Test Duration : 1 hour 1 hour 1 hour <br /> Change in Reading (RF-RI) : 0 0 0 <br /> Pass/Fail Threshold or 0. 00 0.00 0. 00 0.00 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass E] Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and reconiniended folloiw-tip for failed tests) <br /> F <br />(((E <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.