Laserfiche WebLink
t <br /> r"tt <br /> l <br /> t . <br /> OPW Installation , Operation , and Maintenance Manual , Page 74 Executive Order VR- 102-0 <br /> ®Registered T. M. Owens Corning Fiberglass Corporation ASSEMBLY INSTRUCTIONS <br /> Tape measure IMPORTANT : Each of the numbered steps in the instal - <br /> lation instructions are designed as a CHECK LISTto en - <br /> sure proper installation and trouble free operation of the <br /> OPW 61 SO Overfill Prevention Valve , t <br /> Read and follow these steps carefully , checking them off <br /> as you proceed . <br /> Ej <br /> Riser <br /> Pipe ( ) Figure numbers correspond to step numbers for easy z <br /> with To Tank reference . t <br /> Fa ce ( ) � <br /> > eaIAda ptor Top To <br /> ( I . ) Tank STEP 1 : MEASURE ` <br /> Bot om <br /> Install the OPW Face Seal Adaptor and the OPWThread - f; <br /> on Spill Container on the Fill Riser ( Refer to the Installa- : <br /> tion Instructions Supplied with the Spill Container) , In - <br /> Al <br /> sert a tape measure through the riser pipe and hook it <br /> under the inside of the tank in the lengthwise direction . <br /> �j <br /> EXAMPLE <br /> Measure the distance from the top of the Face Seal r <br /> 1 ) For an Owens- Corning Model G3 Fiberglass® Tank Adaptor threads inside the base of the spill container <br /> Calibration Chart : bucket just below the drain valve outlet window to the <br /> Tank Capacity 10 ,000 gal . , nominal 9 ,403 gal , inside , top lip of the storage tank ( Dim . "A" ) <br /> NOTE : Use actual capacity only ( See Figure 1 & 1A) a i <br /> r; <br /> 2 ) 95 % of actual tank capacity = 0 . 95 x 9403 gal . = The top flange on the 61 SO will rest on the Face Seal <br /> 8933 gat . Adaptor just below the drain valve outlet , and be locked <br /> 3) The closest number which is less than 8933 gal . Is in place between the Face Seal Adaptor and the 4 ' <br /> 8910 gal . Choosing the closest number less than nipple that is installed in the spill container with the 1 <br /> 95 % of actual capacity ensures that the initial Jack Screw Kit ( See Figure 1A) . ( For riser pipe configu - ii <br /> shutoff will occur when the tank is no more than rations other than that shown , consult installation (! <br /> t <br /> 95 % full , drawings or use other necessary means to measure Di- <br /> 4 ) The calibration chart reading of 8910 gal . corre - mension "A" ) . <br /> sponds to a dipstick measurement of 82 . Using a tape measure , measure the distance from the top <br /> 5 ) Dipstick number ( X ) = 82" <br /> of the Face Seal Adaptor in the spill container to the <br /> Tank diameter (Y ) = 92 bottom of the tank ( Dim . <br /> (Y ) (X) _ (Z) ( 92" - 2" = 10" ) IMPORTANT : Inspect the riser pipe for any foreign ma - <br /> (Z ) = 10 " terial , Over spray from tank relining or any internal burrs <br /> 6 ) (Z ) - 2" = C ( 10" - 2" = 8") inside of pipe must be removed prior to installation . Kul <br /> C = 8" Failure to have an unobstructed riser pipe may prevent <br /> proper installation and operation of the valve . The 61 SO <br /> 7 ) Is 8" less than 6- 1121'? is designed for installation into schedule 40 riser pipes . <br /> The 61 SO cannot be installed into schedule 80 riser <br /> NO Measure the distance from the top of the FSA- pipes . <br /> ix <br /> 400 Face Seal Adaptor installed on the riser pipe STEP 2 : MARKTHETUBE i <br /> to the inside , top lip of the storage tank and <br /> obtain measurement (A) . Use the result from Step 1 and HOW TO LOCATE THE <br /> POSITION OF THE 61 SO AT 95% TANK CAPACITYto <br /> Upper tube length = C + (A) mark the upper tube . Measure the distance from the <br /> point where the upper tube and valve body meet . For <br /> " C" measurements greater than 6- 1 /2" use tape <br /> measure to mark the calculated upper tube length onto <br /> the upper tube . <br /> i <br /> I <br />