Laserfiche WebLink
t <br /> F , <br /> OPW Installation , Operation , and Maintenance Manual , Page 75 Executive Order VR- 102-Q <br /> f Tapemeasure CAUTION - DO NOT use a pipe or tubing cutter to cut <br /> the upper drop tube , this may damage the tube , <br /> ) ' t causing it to be out of round thereby prohibiting <br /> assembly of the unit . <br /> FacePipe <br /> Face Seal ' E ) <br /> Adaptor (A ) <br /> To Tank (B ) f <br /> Top it , D. ) ,r <br /> I rare <br /> Bottom / 11 <br /> 1 / <br /> s <br /> d <br /> Figure 1 ! �\� <br /> N � NPe <br /> PP Figure 3 <br /> STEP 4 : FILE THE UPPER DROP TUBE <br /> f'f <br /> File the upper tube square , and <br /> - <br /> remove any burrs or rough edges . <br /> IJ <br /> oPw spm <br /> Container Make sure the cut is flat and <br /> 6 <br /> Measure to here square . <br /> oT a k Screw Jack Screw <br /> ,nslat,attan (Top Kit IMPORTANT : Carefullyfile a good , <br /> of Face Seal O Ring Seal chamfer on the inside edge of the <br /> Adaptor) �� Face Seal drop tube to provide a lead - in for <br /> Adaptor the o- ring and inlet tube installed <br /> in Step 6 . <br /> Figure 1A CAUTION : Failure to properly Figure 4 <br /> TapeMoasure __ _� apply and cure sealant may re- <br /> Rr <br /> _ suit in a failure of a pressure de- rr <br /> cay leak test. r <br /> STEP 5 : APPLY SEALANT <br /> TransferMark E _Froma <br /> per Prepare sealant by thoroughly s- -Sticklo_ Jp <br /> Tube mixing 1 / 3 of each packet togeth - X' <br /> eruntil color isuniform , Gener- <br /> I seam ouslyapply sealanttothe inside <br /> Figure 2 diameter of the upper drop tube . Figure 5 <br /> I <br /> (For °C' less than or equal to 6412 " only) Make sure coverage is completely <br /> around the tube as shown in Fig . <br /> STEP 3 : CUT THE UPPER DROP TUBE 5 ' <br /> Carefully saw through the tube squarely , at the mark STEP 6 : INSTALL INLET TUBE <br /> made in Step 2 . Use a hacksaw with a new fine-tooth Install o-ring in the o- ring groove <br /> blade . Rotating the upper tube as the sawing progress - of inlet tube ( DO NOT USE , <br /> es will minimize run out and ensure a square 90 -degree GREASE ) . Inserttheinlettube ' <br /> cut. A piece of paper , taped s uare with the tube or �� ��" ` s <br /> p ' p p p q into the upper tube until it seats to ,move <br /> hose clamp can be used as guides for making a square against the flange on the upper Figure 6 <br /> CUL inlet tube , <br /> t <br />