My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2300 - Underground Storage Tank Program
>
PR0232601
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 1:25:14 PM
Creation date
9/3/2020 8:54:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232601
PE
2361
FACILITY_ID
FA0004525
FACILITY_NAME
CHEVRON STATION #372736/2223
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> OPW Installation , Operation , and Maintenance Manual , Page 76 Executive Order VR- 102-Q <br /> i � <br /> STEP 7 : DRILL HOLES ously apply sealant to the first 6 male threads on the <br /> With the inlet tube in place , carefully drill ( 3 ) 1 /8" diam - valve body as shown in figure 10 . Make sure coverage <br /> eter pilot holes through the drop tube and inlet tube at is completely around the threads , and work the sealant1 <br /> three locations at 120 degree intervals around the tube , down into the thread profile . Quickly thread the lower <br /> 1 inch below the flange . Using the pilot holes , drill ( 3 ) tube onto the valve body . Tighten the tube securely by <br /> 5/ 16 dia . holes through the tubes . Remove the burrs hand or with a strap wrench . Remove excess sealant <br /> from the drilling operation from the inside of the drop and smooth sealant bead with water moistened mixing r' <br /> tube assembly with a fine half round file . ( 1 <br /> IMPORTANT : Allow sealant ( epoxy) to cure for 24 <br /> IMPORTANT : A 5/ 16" drill bit must be used . Do not hours before installing into tank . <br /> substitute any other size drill bit . <br /> nCt 7 Sealant <br /> alcund fist 5 th c id< <br /> 'i <br /> Figure 90 i <br /> `i. NOTE : Before installing the valve in the tank , a pres - <br /> , _ sure test can be performed on the valve to check for <br /> vapor tightness . Seal off both ends of the tube with <br /> Figure 7 inflatable plumber' s plugs . Apply a maximum 10 " W . C . <br /> ( 1l3 PSI ) air pressure . If pressure does not hold and a <br /> STEP 8 : ASSEMBLE AND SEAL CLINCH STUDS leak can be located with soap solution , do not install <br /> Loosely assemble the the valve . Send the valve back to OPW for warranty 1, <br /> three ( 3 ) clinch studs , lock evaluation . Caution : Do not over- pressure . Excess pres- <br /> washers , and nuts insure can damage the valve . <br /> holes . Do not tighten at Apply Sealant (, <br /> g �� STEP 11 : CUT LOWER TUBE AT 45 ANGLE <br /> this time . Mix up a small <br /> amount of sealant . Gen � '' - ` � ' / ! Measuring from the underside of the inlet tube flange , <br /> y apply �I,t' V it v mark the overall length of the drop tube a distance of <br /> erousl a I sealant un- � � _ <br /> derneath each clinch stud , I ' � '� } 1'` ( B ) minus 6" or as per local codes or requirements . De - <br /> li termine dimension B from the measurements taken in <br /> head , each nut , and on ti � ` h � ( ) <br /> Ste 1 , Figure 1 (Top of the Face Seal Adaptor below the <br /> the outside of the tube I <br /> around the holes . _ " _ - drain valve outlet in the spill container to the bot- tom <br /> of the tank ) . Saw off the excess tube ata 45. degree <br /> angle , and file off any sharp burrs ( Refer to Figure 16 ) . <br /> Optional : Install the OPW Tank Bottom Protector on the <br /> Figure 8 lower tube ( Refer to Installation instructions supplied <br /> with the Tank Bottom Protector) . <br /> STEP 9 : TIGHTEN SELF-CLINCHING STUDS STEP 12 : PREPARE FILL RISER FOR VALVE INSER- E <br /> Tighten clinch studs securely with a Y2' wrench . Use TION <br /> only the self- clinching studs that are supplied with the IMPORTANT : Inspect the riser pipe for any foreign ma - i <br /> unit . Seating torque is 11 . 5 ftdbs min , to 13 . 5 ft-lbs terial . Over spray from tank relining or any internal <br /> max . Do not over tighten . Note : Failure to properly burrs inside of pipe must be removed prior to installs- <br /> apply and cure the sealant may result in a failure of a tion . Failure to have an unobstructed riser pipe may E' <br /> prevent proper installation or operation of the valve . <br /> pressuredecayleaktest . P P P <br /> STEP 10 : LOWER TUBE ASSEMBLY Thoroughly clean top of riser pipe . <br /> If a vise is used , clamp on the valve body casting only to <br /> avoid damage to the float . Mix the remaining sealant <br /> j until the color is uniform . Using the mixing stick , gener- <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.