Laserfiche WebLink
K KJELOSEN Elisabeth A. Beckensten, P.E. <br /> S S I N N O C K Civil Engineer <br /> N NEUDECK 1550 Harbor Blvd. Suite 212 West Sacramento CA 95691 <br /> inc. cswlENGINEERS BLAND SURVEYORS 916 403-5900 1 fax: 916 403-5901 <br /> C E L E B R AT I N G 60 Y 'E All s ebeckensten(a ksninc.com I https://www.ksninc.com <br /> Warning.- <br /> Information <br /> arning:Information provided via electronic media is not guaranteed against defects including translation and transmission errors. <br /> If the reader is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this <br /> communication is strictly prohibited. If you have received this information in error, please notify the sender immediately. <br /> From: Callahan, Michael [PW] <mcallahan@slgov.org> <br /> Sent: Monday, April 27, 2020 12:45 PM <br /> To: Elisabeth A. Beckensten, P.E. <ebeckensten@ksninc.com>; Wong,Jeff<Jwong@sigov.org> <br /> Cc: Steven Whittlesey<swhittlesey@ksninc.com>; Neal Colwell <ncolwell@ksninc.com>;Joseph E.Thomas <br /> <jthomas@ksninc.com> <br /> Subject: RE:Joe Grindstone Engineered Plans for Septic Holding Tanks <br /> Elisabeth <br /> I have finished reviewing the report. Regarding the floodway definition number 4,the report states that the project is <br /> indeed between the levees and flood water does flow over the project site which means it is within the floodway. The <br /> report then simply states that "it is not the watercourse itself'. The report need to explain this statement and provide <br /> concrete reasoning as to why the project site should not be considered part of a watercourse or river and why it does <br /> not meet floodway definition number 4. <br /> Michael Callahan <br /> Senior Civil Engineer <br /> San Joaquin County <br /> Department of Public Works <br /> (209)468-9360 <br /> mcallahan@sigov.org <br /> From: Elisabeth A. Beckensten, P.E. <ebeckensten@ksninc.com> <br /> Sent:Tuesday, April 07, 2020 6:08 PM <br /> To: Wong,Jeff<Jwong@sigov.org> <br /> Cc: Callahan, Michael [PW] <mcallahan@sigov.org>; Mike Torell (Tore112@hotmail.com) <Tore112@hotmaii.com>; Steven <br /> Whittlesey<swhittlesev@ksninc.com>; Neal Colwell <ncolwell@ksninc.com>;Joseph E. Thomas <br /> <ithomas@ksninc.com>; Scott Andrews<scott@cogenia.com> <br /> Subject: RE:Joe Grindstone Engineered Plans for Septic Holding Tanks <br /> Mr. Wong, <br /> Thank you for forwarding the comments from Mr. Callahan in the Public Works Department. My colleague,Joseph <br /> Thomas, who is Certified Floodplain Manager has reviewed the comments and relevant site data. Please see the <br /> attached letter he prepared addressing the floodway concerns. <br /> 2 <br />