Laserfiche WebLink
INITIAL STUDY <br /> (CONTID) <br /> SA-92-73 <br /> J.b. The operation of the proposed facility will be subject to <br /> regulations administered by the Regional Water Quality Control <br /> Board. Those regulations require specific standards of <br /> construction for waste ponds to safeguard the quality of the <br /> local water table, as well as regulating the operation and <br /> maintenance of the ponds. The operation will also be subject <br /> to the regulations of the Environmental Health Division of <br /> Public Health Services. <br /> l.c. The proposed operation will make use of existing structures <br /> and drainage features. The latter are comprised of three <br /> ponds for the collection and management of animal wastes and <br /> a drainage easement to the parcel to the south for <br /> agricultural drainage. The operation of these facilities will <br /> be consistent with the regulations of the Regional Water <br /> Quality Control Board and the approved Waste Discharge <br /> Requirements for the facility. The requirement for an <br /> Improvement Plan, prepared by a Registered Civil Engineer and <br /> approved by the Development Services Division prior to the <br /> issuance of building permit, will ensure that the drainage <br /> facility on the adjacent parcel is adequately designed and <br /> sized to contain agricultural drainage. <br /> 1.d. There are no streams or bodies of water on the project site. <br /> Because thereis no new construction proposed as a part of <br /> this project, .there will be no erosion or sedimentation of the <br /> existing drainage facility or patterns. <br /> Initial Study (Rev:01/91) <br /> 10 <br />