Laserfiche WebLink
2 Red Thread IIA Spec if cation GUide <br /> 3.02 ASTM D2310 Classifications(at 73.4°F) Section 4-Installation and Testing <br /> Primary Pipe Secondary Pipe 4.01 Training and Certification-All joints installed or constructed <br /> 2"-3" RTRP-11AF 3" RTRP-11AF in the field shall be assembled by employees of the contractor <br /> who have been trained by the pipe manufacturer.The pipe <br /> 4" RTRPIIAH 4"6" RTRPIIAH manufacturer or their authorized representative,shall train the <br /> (Mechanical properties cell classifications shown are minimums.) contractor's employees in the properjoining and assembling <br /> procedures required forthe project,including hands-on <br /> 3.03 Fittings-All fittings shall be manufactured using the same type participation by the contractor's employees. Eachbondershall <br /> of material as the pipe.Fittings may be manufactured either by fabricate one pipe-to-pipe and one pipe-to-fittingjointthat shall <br /> compression molding,filamentwinding,resin transfer molding pass the minimum pressure testforthe application as stated in <br /> orcontact molding methods.All fittings,adapter,and sump Section 2.03 without leaking. <br /> penetrations shall be UL971-2004 Listed. Only bonders that have successfully completed the pressure test <br /> Primary fittings shall be adhesive bonded,matched tapered bell shall bond pipe and fittings. Each bonder shall carry a current, <br /> and spigot and rated the same as the pipe. manufacturer proof of training card. <br /> Secondarycontainment fittings shalt betwo-piece style to allow 4.02 Pipe Installation-Pipeshallbeinstalledasspecifiedand <br /> for 100%inspection of the primaryjoint pressure test and berated indicated on the drawings. <br /> to a minimum of 50 psig per UL 971-2004. TheP�tPg Yin s stem shall be installed inaccordancewiththe <br /> Should hydrostatic testing be impractical,testing with low manufacturer's current published installation procedures. <br /> pressure air or inert gas maybe acceptable.Extremecaution 4.03Testing-A hydrostatic pressure test shall be conducted on the <br /> should be used when testingwith air.Follow all safety precautions Y completed p ip ing s stem.The piping tog sY stem shall be subjected <br /> and testing recommendationsofthepipemanufacturer. <br /> to 10 pressurization cycles from 0 psigto 1.5 times the design <br /> 3.04 Connections-Connections toflex connectors orother piping operating pressure as stated in Section 2.03.c.After the 10 cycles, <br /> materia Is shalt be made by the use of NPT(National Pipe Thread) the pressure shall be held on the system for a minimum ofIhour <br /> threaded adapters or flanges bonded to the FRP piping system. and the line inspected for leaks. <br /> 3.05Sump Penetrations-Sump penetrations shall be made by means Test pressures shall not exceed 1.5 times the maximum rated <br /> ofa permanently bonded FRP coupling.The coupling shall be pressure of the lowest rated element in the system. <br /> capable of adjusting for the slope of the piping system entering or <br /> exiting the sump wall. All pipejointsshall be watertight.Alljointsthat are found to <br /> leak,by observation orduringtesting shall be replaced by the <br /> 3.06 Adhesives-Adhesives shall be manufacturer's standard forthe contractorand retested. <br /> piping system specified. <br /> Should hydrostatic testing be impractical,testingwith low <br /> 3.07 Acceptable Products-Red Thread llApipingsystemas pressure air or inert gas maybe acceptable. Extremecaution <br /> manufactured by Fiber Glass Systems or engineered approved should be used when testing with air. Follow all safety precautions <br /> equal. and testing recommendations ofthe pipe manufacturer. <br /> National Oilwell varco has produced this brochure for general Fiber Glass Systems <br /> information only,and it isnot intended fordesign purposes.Although 17115 San Pedro Avenue,Ste 200 <br /> every effort has been madeto maintain the accuracy and reliability of San Antonio,TeXas78232USA <br /> its contents,National Oilwell Varco in no way assumes responsibility <br /> for liability for any loss,damage or injury resulting from the use of Phone:210 477 7500 <br /> information and data herein nor is any warranty expressed orimplied. Fax:210 477 7560 <br /> Always cross-reference the bulletin date with the most current version <br /> listed at the web site noted in this literature. <br /> ©2018 National Oitwell Varco All rights reserved <br /> C11201ENG October 2018 <br /> Fiber Glass Systems I KOY Completion&Production Solutions fgspipe@nov.com nov.com/fgs <br />