Response to comment #8: <br /> Please refer to Details 1 & 2 on sheet G4.0 where the vacuum supply and <br /> communication components are now identified on the plans. Please note that the <br /> vacuum supply and communication components are also shown on sheet G12.2 which <br /> is referenced on these same details and has not changed from the last submittal <br /> Comment #9: <br /> Per your response #17 all piping cross overs will be a minimum of 12 inches, please <br /> confirm that such cross over distance will be maintained through the entire piping <br /> layout <br /> Response to comment #9: <br /> Please refer to revised sheet G1.0 where the revised fuel-piping layout clearly shows <br /> the cross over distance maintained throughout the entire layout. Detail callouts <br /> referencing the required vertical and horizontal crossover clearances are located at all <br /> critical transitions <br /> Comment #10: <br /> Drawing G7,1, Fe Petro leak detector is listed under VMI schedule and Phil-Tite <br /> components are listed under OPW schedule, please correct as appropriate <br /> Response to comment #10: <br /> Regarding the Fe Petro Leak Detectors, <br /> • Please refer to revised sheet G7.1 where the Fe Petro leak detectors have been <br /> removed from the Vaporless Manufacturing Schedule; <br /> • Please refer to revised sheet G7.0 where the leak detectors have been relocated <br /> to the Fe Petro Schedule; <br /> Regarding the Phil-rite Components listed under the OPW Schedule, this schedule has <br /> been renamed to "OPW/ Phil-Tite Schedule" to allow for multiple manufacturers in this <br /> schedule while still maintaining the labeling sequence for the Item numbers. <br /> Comment #11: <br /> Drawing G12.1, all vacuum zone terminations must be shown for all piping inside under <br /> dispenser containments(UDCs), identify all provisions for communication testing at <br /> each vacuum zone termination (UDCs, sumps, vent sumps, chase piping, etc.), provide <br /> a legend for any symbols(like valves) being utilized. On this drawing several vacuum <br /> hoses terminate without any apparent valves or penetrations they should be going <br /> through. Drawing G5.0 doesn't depict vacuum communication provisions for UDCs or <br /> piping. Also, it is EHD s understanding that Phil-Tice spill containers are proposed, <br /> however OPW spill containers are included on this drawing (OPW spill containers are <br /> also shown on G4.1 and several other drawings), please clarify and correct as <br /> appropriate. <br />