My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to comment #11: <br /> Regarding Drawing G12.1, The vacuum zone terminations are shown for the vapor <br /> recovery piping/ UDC sumps in all of the UDCs. The vacuum zone terminations for the <br /> product piping are in the corresponding tank sumps, not in the UDCs. The vacuum zone <br /> termination for all the vent piping and vent sump is located in the vent sump box. A <br /> legend has been added to sheet G12.1 for the symbols being used. Also the product <br /> piping termination (typ.) has been added to UDC sump #6 (the furthest dispenser from <br /> the tanks) for connection of the vacuum verification manifold. <br /> Regarding Drawing G5.0, vacuum tubing and terminations have been added to the <br /> details on sheet G5.0 with references to sheet G12.1. <br /> Phil-Tite spill containers are proposed and are called out on sheet G7.0 as part of items <br /> F26, F27, and F28. The fill sump details on sheet G4.1 are schematic and are not <br /> meant to exactly detail the specific manufacturer's equipment. The sump details on <br /> sheets G4.1 reference the Phil-Tite spill container part #'s on sheet G7.0. <br /> Comment #12: <br /> Vacuum zone volumes were requested previously, please clarify where they were <br /> included in this revised submittal. G6.2 lists 3 vacuum zones, however, 9 smart sensors <br /> are shown on G12.1 , please clarify <br /> Response to comment #12: <br /> The Vacuum Zone volumes, and the identification of the 9 vacuum zones (from 3 smart <br /> sensors) corresponding to those detailed on sheet G12.1 have been added to sheet <br /> G6.2, please refer to revised Sheet G6.2 where these volume totals have been added. <br /> Comment #13: <br /> Provide the following certifications: INCON for Byron Molina, a current Xerxes <br /> certification for all tank installers (the submitted certification has a typed in expiration <br /> date), certifications for all proposed flex connectors (Unisource, Fireflex and Flexing), <br /> Phil Tite, Franklin Fueling Defender Series, and Fe Petro for leak detectors <br /> Response to comment #13: <br /> The contractor, MDSM Corporation, indicated that they recently provided you these <br /> certifications for another project in your jurisdiction. Please reference those <br /> certifications as they will be the same for this project. <br /> Comment #14: <br /> Provide all computability documentation and UL/third party listing information (see <br /> attached compatibility requirement guidance letter dated January 2019 for more <br /> information) <br /> Response to comment #14: <br /> 6110tPlease refer to the Listing Documents included with the response package <br />
The URL can be used to link to this page
Your browser does not support the video tag.